It’s Not Dead Yet
Flood Control Still Pushing Costly, Destructive “Stabilization” Project on Buffalo Bayou
July 31, 2016
It’s a pointless, wasteful, ill-conceived, and maybe illegal project to rip up and raze trees and plants and wildlife habitat, dig up the banks, plug up tributaries, dredge and reroute the channel along one of the last natural stretches of Buffalo Bayou in Houston. This is a dreamy stretch of the river in the middle of the city, filled with beaver, otter, alligators, fish and flying creatures, and even edible plants. It flows for more than a mile past our great public Memorial Park, a natural detention area and significant geologic site that features very old high bluffs and sandstone formations. All of which would be obliterated.
And after almost three years of adamant public opposition, the Harris County Flood Control District is still promoting the project, which will cost the taxpayers at least $4 million plus, not including future costs of maintenance and repair.
It’s mystifying why they want to do this, why they think it would even work, why they don’t realize that the bayou would wash it away or that it would simply all slump away, as has happened in Buffalo Bayou Park downstream, where taxpayers are footing the ever-mounting bill for constantly repairing the banks dug up and stripped of trees and vegetation by Flood Control.
Do They Not Have More Urgent Problems?
Surely, the flood control district has more urgent problems that require our hard-earned tax money. Harris County is one of the most flooded places in the country. And this project, billed as a “stabilization” and “bank restoration” program, will do nothing to address flooding and could even make it worse. The county should focus on the hundreds of miles of channelized bayous and streams unwisely covered in now-aging concrete that should be restored to something more natural and beneficial.
The project, called the Memorial Park Demonstration Project, was first proposed in 2010 by the Bayou Preservation Association under then board chair, Kevin Shanley, landscape architect and principal with SWA Group, the firm responsible for the ugly, obtrusive bridges, collapsing sidewalks, poorly-functioning dog park and non-functioning faux Hill Country fountain and stream in Buffalo Bayou Park.
Reminder: The Threat is Still Alive
Operation Save Buffalo Bayou II
March 14, 2016
Okay, so we harshed the mood a little with our small, silent reminders that regatta contestants were paddling through a historic natural area still threatened with destruction.
“Thanks for polluting my day,” yelled one paddler in the crowd of hundreds of Buffalo Bayou boaters playing loud music and stopping to pee in the woods. We were watching from the sandy bank of the lovely middle meander, forested with young willows and box elder that would all be cut down, the meander filled, graded, and planted with grass.
The event was the 44th Annual Buffalo Bayou Regatta on Saturday, March 12. And once again we hung our beautiful Save Buffalo Bayou banner (Night Heron by Houston artist Frank X. Tolbert 2) from the railroad bridge and set out small white signs alerting participants to the fact that the wild stretch they were passing through would all be bulldozed under a plan proposed by the Harris County Flood Control District and the Bayou Preservation Association (BPA).
The project, known as the Memorial Park Demonstration Project, demonstrates exactly the wrong thing to do. (See Buffalo Bayou Park and Fonteno Park.) It would raze most of the trees and vegetation along more than 1.25 miles of the 18,000-year-old bayou as it passes by Memorial Park and the Hogg Bird Sanctuary. These trees and vegetation and even the sand are part of the riparian zone, essentially wetlands, that hold the banks together, cleanse and filter the water, slow and absorb storm runoff, provide wildlife habitat, among many other important ecological functions. The $6 million “natural channel design” project, financed with $4 million in county and city taxpayer funds, would dredge and reroute the bayou and plug tributaries, obliterate ancient cliffs, destroy 250,000-year-old sandstone formations, and fill in our lovely meander (a natural detention area). Killing the bayou’s ecosystem in the name of “restoration.” And landscape design.
And no, contrary to rumors, the project, although holding its breath, is not dead. The Army Corps of Engineers is still deciding whether to issue a permit for the project, which is otherwise a violation of the federal Clean Water Act.
The Bayou Preservation Association first formulated the plan for the project in private meetings in 2010 and former BPA president Kevin Shanley, then a principal with the landscape architecture firm SWA Group, was the primary promoter. SWA Group is the design firm that is also responsible for the landscape design of Buffalo Bayou Park downstream east of Shepherd.
So this is why we had signs up warning of landscapers lurking. In Buffalo Bayou Park downstream, we set out a few signs pointing out that landscaping has washed away (several times actually) and that removal of vegetation has caused erosion problems, and that repairs were $$$$ (paid with City funds). Yes, we were bad! Those signs did not last long, however.
Upstream around Memorial Park and the Hogg Bird Sanctuary our signs pointed out where beavers live, where banks were being naturally rebuilt by the bayou, and the Pleistocene bluffs that would be graded into a slope. Interestingly, the bayou, during and after the Memorial Day flood in 2015, has already graded the lower banks of those steep bluffs into a slope.
The River Oaks Country Club is theoretically a one-third partner in the demonstration project and owns the entire south half of the project reach. But in the meantime the club in two places has armored its banks with ugly concrete riprap, one of the most environmentally destructive methods of erosion control (pdf), and also, we allege, in this case illegal, as we contend that much of the riprap was placed in public waters, also a violation of the Clean Water Act.
The club, unfortunately, is having erosion problems on its high banks in those places because it cut down a lot of trees and extended the mowed and watered grass of its golf course up to the edge of the banks.
We put out signs pointing out that riprap damages the ecosystem and is part of the problem, not the solution.
But we’re glad people had fun, enjoyed the bayou, and picked up some of trash.
Maybe they’ll think about the future of the bayou.
And special thanks to river guide Tom Helm and to Richard Hyde for extra long duty putting out and picking up our banner and picking up our signs.
Buffalo Bayou Doesn’t Like Sidewalks, It Seems
Buffalo Bayou Park Was Supposed to Be More Stable
Nov. 16, 2015
Updated Nov. 17, 2015
Update: “Endless Repairs: Buffalo Bayou Sets Its Own Terms,” Houston Chronicle, Nov. 20, 2019
Well, we can’t help but wonder if constantly scraping and repairing the sidewalks, forever reinforcing the collapsing banks somehow, and repeatedly replacing the trees and landscaping is fully covered by the $2 million annual maintenance budget for Buffalo Bayou Park paid by Houston city taxpayers.
The popular, much praised, and much needed park on the banks of the bayou between Allen Parkway and Memorial Drive is suffering from some serious erosion problems. And that matters to us not just because of the expense and waste. This $53.5 million project, a boon to adjacent property owners and those who live and work nearby, was touted as a successful example of what the Harris County Flood Control District, egged on by the Bayou Preservation Association, wants to do to our healthy, historic wild bayou further upstream in and around Memorial Park. Buffalo Bayou Park was supposed to be more stable! The flood control district calls it Natural Stable Channel Design, but it always looked to us like they were doing everything you’re not supposed to do on the banks of streams: dig up the banks, run heavy equipment over the banks, remove the trees and vegetation (yes, they did a lot of that), build concrete and asphalt sidewalks on the banks, plant grass and mow it.
Let’s Work With Nature, Not Against It
Once you’ve done all that, and the banks and channel start falling apart, it’s pretty difficult to fix it. Best to let the bayou do what it will do anyway. (And eventually the bayou will rebuild and replant it all.) But it seems unlikely that the City and the Buffalo Bayou Partnership are going to sit back and patiently let millions of dollars worth of sidewalks, lamps, and bridges collapse into the bayou. Can they stop it? Time will tell.
In the meantime, it does make one wonder about all those concrete trails they are carving out of the banks and floodplains of the bayous for the Bayou Greenways project. A nice idea, but is that going to work?
Here’s what we’re talking about. What this slide show of photos of Buffalo Bayou Park between Shepherd and Montrose taken on Nov. 15, 2015 (and updated with later photos).
While We Wait
The Flood Control District’s Failing “Natural Channel Design” Projects
July 11, 2015
Well, the comments are in to the Army Corps of Engineers. The comment period that ended June 5 was not extended. So now we wait to find out what the Corps will do next about a permit for the Harris County Flood Control District’s controversial $6 million Memorial Park Demonstration Project. The flood control district wants to destroy one of the last natural stretches of Buffalo Bayou as it flows past Memorial Park in the middle of the city so that engineers can “build it better,” thus demonstrating exactly the wrong thing to do for erosion control and bank stabilization on the bayou.
It’s the wrong thing to do because the specially adapted trees and plants on the bayou (known as the riparian zone) protect the land from erosion, slow storm water and runoff, filter pollution and bacteria (and trash) from the water, provide shade and habitat, among many other vital functions. Razing the riparian buffer, as this project would do, digging up and running heavy equipment over the banks and bayou bottom are all contrary to Best Management Practices and the policies of virtually every federal and state agency charged with protecting the health of our waters, our wildlife habitat, and our soil.
What Are the Options?
So what are the Corps’ options?
Immutable Plan. Invisible Rocks.
“Revised” plan to destroy Buffalo Bayou not really “revised” at all.
Project manager says no significant changes to much criticized original plan.
No sandstone in project area, says flood control, contradicting itself.
June 3, 2015
Despite the hundreds of comments criticizing the purpose, methods, impact, cost, benefit, and harm of Harris County Flood Control District’s proposed “erosion control” project on Buffalo Bayou in and around Memorial Park, the district has made no significant changes to the plans recently re-submitted to the Army Corps of Engineers.
Jason Krahn, project manager for the controversial Memorial Park Demonstration Project, told Dianna Wray of the Houston Press that the district was “simply following the guidelines” and that there were “no significant changes” to the original project plan.
Indeed, many of the “revised” plan sheets posted by the Army Corps of Engineers on its website appear to have been simply relabeled with new dates, though there are some with new details.
The public has until June 5 to send comments to the Corps about the district’s “revised” permit application and the district’s responses to previous comments. There is no limit on the number of comments one can make. So if you’ve already made a comment, make another!
Operation Save Buffalo Bayou: Banners, Signs Erected During Big Regatta Saturday, March 7
March 8, 2015
Defenders of Buffalo Bayou traipsed through clumps of wild chives and violets on the banks of the bayou Saturday, March 7, in order to hang colorful banners from bridges and trees and set out signs informing more than a thousand participants in the annual Buffalo Bayou Regatta about the grave threat to our wild bayou.
Operation Save Buffalo Bayou was a huge success as competitors paddling down the bayou waved and shouted “No bulldozers!” and “Leave it natural!” to members of the Buffalo Bayou defense team sitting on the banks in the project area.
Bayou defenders also handed out informational flyers at the end of the race in Sesquicentennial Park adjacent to the Wortham Center downtown and engaged participants and officials in conversation.
The regatta was organized by the Buffalo Bayou Partnership (BBP), a non-profit organization in charge of developing the $58 million Buffalo Bayou Park between Memorial Drive and Allen Parkway downstream of the project area. The partnership officially supports the $6 million plan to bulldoze one of the last natural stretches of the bayou as it flows past Memorial Park in the middle of Houston.
Sand on the Sidewalks
BBP President Anne Olson wrote a letter of support for the destruction project to the Army Corps of Engineers in June 2014 saying that the plan would “significantly prevent” the bayou from “depositing silt on Buffalo Bayou’s downtown parks and trails.” She also claimed that the project, known as the Memorial Park Demonstration Project, would demonstrate “a prototype that can be employed by bayou property owners who currently remedy their property erosion by all different types of inappropriate stabilization methods.”
In fact the amount of silt and sediment contributed by the historic nature area targeted for destruction by the Harris County Flood Control District is minimal. But the project itself would likely greatly increase the sediment flowing downstream as a result of dredging the bayou, removing trees and plants, and breaking up the soil structure of the banks.