It’s for the Birds

Report on Plans for the Hogg Bird Sanctuary on Buffalo Bayou

May 11, 2016

First the positives about the presentation Monday evening, May 9, by the Houston Parks Board about plans for the little-known 15.56-acre nature preserve on Buffalo Bayou known as the Hogg Bird Sanctuary.

The sanctuary at the end of Westcott Street south of Memorial Drive is probably better recognized as the mostly impenetrable woods next to the parking lot for the Houston Museum of Fine Arts’ Bayou Bend Collection and Gardens, located across the bayou, accessible by a footbridge. Bayou Bend is the former home of the Hogg Family, who developed River Oaks and in 1924, along with partner Henry Stude, sold at cost to the city the 1,503 acres that became Memorial Park. (The Hogg Brothers also sold to the city at cost 133.5 acres of land intended to be part of Hermann Park. In 1943 the city sold that land for the establishment of the Medical Center, which provoked the continuing ire of their sister, Ima Hogg.) Ima Hogg, a cultural and civic leader and one of the city’s most revered philanthropists, donated the family house and gardens to the museum in 1957 and then donated to the City of Houston the woods on the north side of the bayou as a nature preserve.

The mouth of the tributary and Pleistocene-era bluffs off the Hogg Bird Sanctuary on March 18, 2016. This tributary once flowed to the east across the upper part of the nature preserve into the bayou. Photo by Susan Chadwick

The mouth of the tributary and ancient bluffs in the Hogg Bird Sanctuary on March 18, 2016. This tributary once flowed to the east across the upper part of the nature preserve into the bayou. Photo by Susan Chadwick

Ima Hogg a Defender of Nature and Public Parks

Ima Hogg, who died in 1975, was also an ardent conservationist, early civil rights activist, mental health activist, and defender of park space for the public, in particular Memorial and Hermann parks. In her letters to city officials over the years, available in the archives of the Museum of Fine Arts, she described her firm belief that woodland parks should be kept as natural as possible and criticized in a 1964 letter to then Mayor Louie Welch, who famously thought public parks unnecessary, the “alarming situation” of rapidly diminishing park areas in Houston and “throughout America,” including through construction in the parks by “worthy institutions” that really ought to look for building sites elsewhere, she wrote. Miss Ima was still angry that the city had “relinquished so much of the acreage” in Memorial Park for highways and a golf course and in an earlier letter to then city director of public works, Eugene Maier, demanded that the money the city received from the state for the highway land be used to acquire and improve additional park sites. Let’s guess that probably didn’t happen.

Read the rest of this post.

What’s the Plan for the Hogg Bird Sanctuary?

Meeting Monday, May 9, 2016

May 7, 2016

Anyone interested in the future of that small bit of brambly bird paradise on Buffalo Bayou known as the Hogg Bird Sanctuary will want to attend the public meeting on Monday evening, May 9, near Memorial Park.

The 15.56 acre public park at the end of Westcott Road south of Memorial Drive was donated to the City of Houston in 1958 by the late Ima Hogg as a nature preserve. In 1924 the Hogg Family had sold at cost to the City of Houston the land that is now Memorial Park, formerly a part of Camp Logan. The bird sanctuary is now part of Memorial Park and includes a large parking lot, a visitor center, as well as the entrance to the footbridge that leads across the bayou to Ima Hogg’s former home, now the Bayou Bend Collection and Gardens, a part of the Museum of Fine Arts, Houston.

In 2014 the sanctuary was listed as one of Preservation Texas’ Most Endangered Places because of the threat from the Memorial Park Demonstration Project.

The meeting is to update the public on proposed plans for the park, for which the Houston Parks Board reportedly has received a $1 million gift. According to the announcement, a steering committee of stakeholders, using the Memorial Park Conservancy’s Master Plan (see page 132) as a starting point, has conducted additional research with consultant Design Workshop and developed new ideas.

Who Is On the Steering Committee?

The individuals on the steering committee varied from one meeting to another, said Catherine Butsch, communications manager for the Houston Parks Board, in an email. “But the groups represented include Memorial Park Conservancy, Houston Parks and Recreation Department and Houston Parks Board along with the Garden Club [of Houston] in an advisory capacity given their active studies of the site [see page 134],” she wrote. “Others consulted as part of the process include the Harris County Flood Control District, Museum of Fine Arts Houston, Houston Audubon as well as the Garden Club and Rice researchers.”

The meeting will take place from 6:30 to 7:30 p.m. in the Fellowship Hall of St. Theresa’s Catholic Church, 6622 Haskell Street, on the northeast side of Memorial Park. The Houston Parks Board, along with the Memorial Park Conservancy and the Houston Parks and Recreation Department, is sponsoring the meeting.

For questions email info@houstonparksboard.org.

The Memorial Park Master Plan for the Hogg Bird Sanctuary.

The 2014 Memorial Park Master Plan for the Hogg Bird Sanctuary.

 

No Changes in Operation of Buffalo Bayou Dams

Release Rates May Be Looked At in Future

March 13, 2016

It was a dark and stormy night. Thunder boomed and heavy rain pelted the roof as a small group of us sat nervously in the middle of the rising Addicks Reservoir in far west Houston listening to the district commander of the Army Corps of Engineers tell us Addicks and Barker dams are safe.

Flanking Col. Richard Pannell last Wednesday, March 9, was a panel of officials from the Corps’ Galveston District office, as well as representatives from the Harris County Flood Control District and Granite Construction, the company awarded the $71.9 million contract to replace the leaky conduits in the 70-year-old earthen dams. The audience was a small crowd of about thirty hardy citizens who had braved the heavy traffic and heavy rain and managed to find the Bear Creek Community Center in the middle of a dark, wet forest despite the wrong address in the Corps’ public notice.

Col. Pannell made a thorough and convincing presentation of the history of the dams, the current problems, and what is being done about them. Among other work, the conduits in the two dams will be entirely replaced by new conduits in separate locations. This process will take about three years. He emphasized that the dams were in no immediate danger of failing and explained that the dams are labeled “extremely high risk” because of the potential consequences to Houston, the nation’s fourth most populous city, in the unlikely event that the dams failed.

Dams Operating Normally Despite Leaks

There were several questions about the capacity of the dams and the impact of repairs on the rate of future releases of water impounded behind the dams. The pattern of extended high releases and rapid drops has been criticized for damaging property on the bayou and killing trees and vegetation that control erosion.

After the enormous Memorial Day storm last year, the Corps began releasing impounded stormwater at 3000 cubic feet per second (cfs) for the first time. Normally the release rate is limited to 2000 cfs as measured by the Piney Point gauge. The Corps does not release water from the dams during a rain event, and the high releases began on June 1 and continued for ten days, finally dropping on June 12. The banks were already saturated from the storm, and the damage from the extended high flow was plainly visible up and down the bayou.

Read the rest of this story.

Tree on private property downed by extended high water releases from Buffalo Bayou dams in June 2015. Photo courtesy of Don Jones.

Tree on private property downed by extended high water releases from Buffalo Bayou dams in June 2015. Photo courtesy of Don Jones.

 

Your Time Is Up: Cohen Cuts Off Criticism of Costly Memorial Park Plan

What’s the Rush?

Full Council to Consider Unfinished $3.2 Million Plan Wednesday, April 1

Public Comments to Council on Tuesday, March 31

March 29, 2015

Update Monday, March 30: Council Member Steve Costello’s office has responded that as a member of the board of directors of the Memorial Park Conservancy, he will recuse himself from voting on the proposed master plan.

Update Thursday, April 2: Houston City Council unanimously approves $3.2 million master plan for $200-300 million landscaping of Memorial Park over next 20-30 years.

Public comments were limited to two minutes due to the large number of people signed up to speak on the city’s proposed master plan to spend $200-300 million on Memorial Park. A few of the nine members of the council’s Quality of Life Committee, chaired by Ellen Cohen, met last Wednesday afternoon to hear Parks Director Joe Turner and landscape architect Thomas Woltz present the ambitious, vague, and costly master plan for the 1500-acre-plus woodland park.

Dozens of people spoke in favor of the plan. Most of them were members of the board of or connected to the Memorial Park Conservancy, and many of them, users of the park, gave moving testimony about their reasons for joining the conservancy: the devastating impact of the 2011 drought, which has killed more than half the trees in the park.

But there were also strong critics of the unfinished $3.2 million proposal, which so far does not seem to be an actual written plan specifically identifying and prioritizing what should be done and when, two key elements for a successful master plan, according to a recent report on urban park conservancies from the Trust for Public Land.

A large contingent of critics were residents or property owners adjoining the park concerned about the increase in traffic, noise, lights, and people using the park. A smaller group of conservationists also expressed concern about the increase in traffic and parking, the loss of trees and natural areas, the expense, inappropriate planting plans, and lack of detail about costs and maintenance. It was suggested that new facilities be placed instead in new parkland purchased with some of the millions of public dollars to be used for the project.

The new master plan proposes to increase parking by thirty percent. However, the 2004 master plan for the park, much of which has never been carried out, identified parking lots as “undesirable intrusions on the natural landscape” and recommended “no net change to the quantity of daily use parking spaces” in the park. To manage peak demand, the 2004 plan recommended the use of shuttles and the construction of “an ‘over-flow only’ parking using environmentally sensitive construction techniques along the rail and power line right of way.”

Read the rest of this story.

Springtime on a tributary of Buffalo Bayou in Memorial Park. Photo by Jim Olive on March 25, 2015.

Springtime on a tributary of Buffalo Bayou in Memorial Park. Photo by Jim Olive on March 25, 2015.

The Blinged-Out Master Plan for Memorial Park

 

City Council Quality of Life Committee Should Send Expensive, Overdone Master Plan Back to Drawing Board

March 24, 2015

The Memorial Park Conservancy is sending its $3.2 million unfinished master plan for Memorial Park to the Houston City Council’s Quality of Life Committee on Wednesday, March 25. The plan is so far a gaudy, overstuffed mish-mosh of bad, hazy, contradictory, wrong, and incomplete ideas developed apparently with the main goal of spending some $200-300 million, half of it public money.

The committee should reject this tacky, impractical document and consider directing hundreds of millions of dollars towards the purchase of new parkland instead.

Among other things, the plan misleadingly describes Buffalo Bayou as it flows along Memorial Park as “altered.” A slide shown at the final presentation of the plan to a packed audience at the Museum of Fine Arts Houston March 9 outlined the bayou in bright red and identified it as “altered Buffalo Bayou.” (See slide 18.)

We were stunned. Reasonable people would assume that “altered” meant channelized, dug up, scraped, engineered, rebuilt, etc. by humans or machines. In fact, the bayou flowing past Memorial park is one of the last unaltered stretches remaining in the city.

But no, “altered” in this case means “changed over time,” explains Shellye Arnold, executive director of the park conservancy. The bayou has adjusted to increased water flows from increased runoff due to development and paving; therefore the bayou is “altered,” says Arnold in an email.

The conservancy is developing the ten-twenty-thirty-year plan with the Houston Parks and Recreation Department and the Uptown TIRZ 16, which is funneling our tax money into the blinged-out project. It’s not clear who is in charge of the master plan, or even who is now in charge of Memorial Park, for that matter.

Read the rest of this post.

Central Texas limestone entryway proposed for Houston's Memorial Park. Image from Memorial Park Conservancy.

Central Texas limestone entryway proposed for Houston’s Memorial Park. Image from Memorial Park Conservancy.

 

 

 

 

Parks Department: Take Down That Fence

When is a Public Boat Launch Not a Public Boat Launch?

Nov. 6, 2014

A boat launch is no longer a boat launch after the City spends $1.3 million designing, building, and landscaping it and doesn’t include access for the people and their boats.

That’s the explanation from representatives of the parks department and the Uptown TIRZ 16 for why the once-popular official Parks and Wildlife boat launch at Woodway in our Memorial Park remains fenced-off and closed to the public more than six months after it was transformed into a massive drainage outfall.

The maintenance ramp cleared of mud at the Woodway not-a-boat launch on Nov. 1, 2014. It's not safe for people, says the City.

The maintenance ramp cleared of mud at the Woodway not-a-boat launch on Nov. 1, 2014. It’s not safe for people, says the City.

Coincidentally, being able to put in at Woodway allows the public to float down Buffalo Bayou through the historic natural area that the City and County want to obliterate. That nearly 1.5-mile stretch of the river further downstream is one of the last remaining wild reaches of our 18,000-year-old mother bayou. So keeping the put-in closed makes it more difficult for people to see the majestic very old cliffs, lovely forested banks, and sandy beaches of this little known wilderness area that will be destroyed.

Officially it’s not a boat launch at all, which is why it is closed, although it might be a boat launch again sometime in the future, according to Rick Dewees, assistant parks department director in charge of Memorial Park, and Sarah Newbery, the Uptown TIRZ 16 project director for the Memorial Park Master Plan. The Uptown TIRZ 16 financed the project at Woodway with taxpayer funds.

But wait, what’s that gently sloping, winding paved ramp leading down to the water?

That’s not for people; that’s only for maintenance trucks, said Dewees. Newbery agreed.

Read the rest of the story.

Will the New Memorial Park Master Plan Be for the People?

Nov. 5, 2014

Public Meeting Monday, Nov. 10, 2014, on proposals for a new Memorial Park Master Plan.

The prison-grade fence preventing access to the $1.3 million landscaped not-a-canoe launch and secret wild woods with spring-fed pool in Memorial Park west of 610.

The prison-grade fence preventing public access to the $1.3 million SWA Group- landscaped not-a-canoe launch and secret wild woods with spring-fed pool in Memorial Park west of 610.

The Memorial Park Conservancy, Houston Parks and Recreation Department, and the Uptown Houston TIRZ are holding the second of four community meetings Monday, Nov. 10, 2014, about proposals for a new $1.8 million Memorial Park Master Plan.

The meeting will be from 6:30 to 8:30 p.m. in the White Oak Conference Center, 7603 Antoine Drive, 77004.

Go and ask them why they have locked up an entire forested section of our Memorial Park south of Woodway west of 610 and closed off access from there to Buffalo Bayou, access that historically had always been open to the public.

As far as we know, which is not much, the proposals for the new master plan make no mention of Buffalo Bayou. The previous master plan from 2004 recommended that the bayou be left alone as “a symbol of dynamic natural process.”

The 2004 plan reported that “a study of the Bayou’s dynamics and stability concluded that, after adjusting to increased urban runoff and water management structures upstream, the Bayou is vertically and horizontally stable, i.e., it is not deepening its channel nor is it dramatically widening its path.”

The landscape architecture firm of Nelson Byrd Woltz is leading the development of the new master plan. The City of Houston and the Uptown TIRZ plan to spend  $100 to $150 million in tax money on capital improvements to the park in the next twenty years. None of that money is for park maintenance.

A Bold Stand on Buffalo Bayou from A Long-Time Conservationist

It’s time again to stop the bulldozers on the bayou

Flood-control plans are a ‘tragic, misguided, destructive experiment’

October 24, 2014 | Updated: October 24, 2014 5:22pm

I feel responsible.

In 1966 Terry Hershey asked me to join with her, George Mitchell, and then Congressman George Bush in their campaign to stop the Army Corps of Engineers and the Harris County Flood Control District from bulldozing the natural banks of Buffalo Bayou near our homes on the west side of Houston.

At the time none of us knew what we know now: that the trees and vegetation that grow on the bayou’s banks are so important to the quality of our water, to erosion and flood control. We just knew that we preferred and respected nature. My house backed up to the bayou, and I let the enchanting forest back there grow wild. I was one of the only homeowners in our small neighborhood on the river who never had problems with erosion. Others who cut down the wild trees and plants saw their backyard gardens and lawns wash away.

We stopped the bulldozers on the bayou back then, and at other times too over the years. The organization that we formed became the Bayou Preservation Association, and eventually I became the president of it. I am still on the executive committee of the BPA, as it is called, though the organization no longer serves the cause of preservation. The BPA has lost its way.

Read the rest of the editorial in Gray Matters in the Houston Chronicle.

Great egrets flying past Memorial Park. The banks here will be bulldozed, and the bayou filled in and a new channel cut further south  through River Oaks Country Club property.

Great egrets flying past Memorial Park. The banks here will be bulldozed, and the bayou filled in and a new channel cut further south through River Oaks Country Club property. Photo by Jim Olive.

The Memorial Park Master Plan and the Survival of Buffalo Bayou

Sept. 20, 2014

Nobody wanted to mention the strange plan to bulldoze our wild Buffalo Bayou in Memorial Park and they wouldn’t let us put out our flyers at the Memorial Park Conservancy meeting in the El Dorado Ballroom on Wednesday, Sept. 17, 2014, to introduce the beginnings of a new master plan for the park. The previous master plan in 2004 recommended that this last remaining stretch of wild bayou be left alone as a valuable educational tool about nature and its dynamic process. The conservancy, a private, non-profit organization charged with protecting and preserving the 1500-acre park, has decided to ignore that recommendation and supports razing the riparian forest, dredging, channelizing, rerouting, and destroying the ecosystem of this stable, functioning reach of the bayou. Because.

Well, few people understand what the purpose of this bizarre project is, and we have talked to some certified geniuses about it. Proponents call it erosion control, flood control, invasive species control, “restoration,” but none of it explains the massive amount of destruction planned or why they are using long-discredited channelizing methods that likely will result in more erosion, more flooding, and the whole artificially reconstructed bayou washing out, along with whatever native vegetation they plant there.

Read the rest.

Topographic map of Buffalo Bayou on the southern edge of Memorial Park, 2013.

Topographic map of Buffalo Bayou on the southern edge of Memorial Park, 2013.

Memorial Park, the Master Plan, and Our Wild Buffalo Bayou

Sept. 15, 2014

Proposals for a new master plan for Memorial Park will be presented at a public meeting on Wednesday, Sept. 17, from 6 to 8 p.m. at the Eldorado Ballroom, 2310 Elgin Street. Anyone concerned about the future of our great Memorial Park and Buffalo Bayou as it  flows past the park will want to attend this meeting, one of four “update” meetings scheduled about the plan over the next several months.

The prominent national landscape architecture firm of Nelson Byrd Woltz is leading development of the plan. Thomas Woltz, principal of the firm, and his team will share results of their research and analysis, as well as initial design concepts at the Wednesday meeting co-hosted by Houston City Council Members Dwight Boykins and Robert Gallegos.

Do Nothing to Our Wild Bayou is the Best Policy

The last master plan for Memorial Park in 2004 recommended that nothing be done to disturb the natural environment of Buffalo Bayou. After extensive analysis by a team of fluvial geomorphologists and hydraulic engineers, the plan wisely concluded that “the recommended course of action for the Bayou is simply to leave it alone and consider it a symbol of dynamic natural process. The Bayou can serve as a valuable environmental education tool that depicts the change inherent in nature.”

It is not yet known, to us at least, what recommendations the new master plan will make about our treasured last stretch of wild bayou in Houston. However, contradicting the clear conclusions of the 2004 master plan, the Memorial Park Conservancy officially and actively supports the Bayou Preservation Association‘s bizarre project to bulldoze the bayou’s riparian forest, level and grade the banks and cliffs, dredge, channelize, and reroute the bayou. This would forever destroy a valuable and historic natural resource in our great public park, an amazing oasis of riverine wilderness in the middle of the city.

Read the rest.

1915 USGS topographic map of Buffalo Bayou in the area to be bulldozed by a project supported by the Memorial Park Conservancy and the Bayou Preservation Association.

1915 USGS topographic map of Buffalo Bayou in the area to be bulldozed by a project supported by the Memorial Park Conservancy and the Bayou Preservation Association.