Riparian Buffers: What Are They Good For?

A workshop in Houston, Monday, Nov. 17, 2014, about the benefits of riparian buffers.

Nov. 6, 2014

Let’s hope they discuss the importance of riparian buffer right here on Buffalo Bayou.

Speakers include representatives from Texas Forest Service, Natural Resource Conservation Service, Texas Water Resources Institute—and Harris County Flood Control, which plans to demonstrate erosion control by ripping up riparian buffer on the bayou. Should be an interesting workshop.

Sponsored by the Houston Galveston Area Council. 10 am to 12 pm, 3555 Timmons Lane, Suite 120, H-GAC Conference Room A, Second Floor.

Here’s how to sign up.

Here’s an example of what happens to landowners who raze the riparian buffer on their property. The lovely River Oaks property featured below once had riparian forest protecting its sloping banks on Buffalo Bayou. The new owner built a new house and cut down the buffer, likely for the view of the river, and planted grass.

The photo on the left was taken at base flow (low water) on July 12, 2014. The photo on the right was taken, also at low flow, from the same angle although slightly farther away on Oct. 24, 2014.

This property is immediately adjacent to the project area where the Harris County Flood Control District and the Bayou Preservation Association plan to demonstrate erosion control to property owners on Buffalo Bayou by eliminating the riparian buffer. The project is known as the Memorial Park Demonstration Project.

The same property on Oct. 24, 2014. Photo taken slightly farther away but from the same angle.

The same property on Oct. 24, 2014. Photo taken farther away but from the same angle and approximately same water level.

Riparian forest buffer was cut down and replaced by grass on this sloping property on Buffalo Bayou in River Oaks. Photo taken July 12, 2014.

Riparian forest buffer was cut down and replaced by grass on this sloping property on Buffalo Bayou in River Oaks. Photo taken July 12, 2014.

Parks Department: Take Down That Fence

When is a Public Boat Launch Not a Public Boat Launch?

Nov. 6, 2014

A boat launch is no longer a boat launch after the City spends $1.3 million designing, building, and landscaping it and doesn’t include access for the people and their boats.

That’s the explanation from representatives of the parks department and the Uptown TIRZ 16 for why the once-popular official Parks and Wildlife boat launch at Woodway in our Memorial Park remains fenced-off and closed to the public more than six months after it was transformed into a massive drainage outfall.

The maintenance ramp cleared of mud at the Woodway not-a-boat launch on Nov. 1, 2014. It's not safe for people, says the City.

The maintenance ramp cleared of mud at the Woodway not-a-boat launch on Nov. 1, 2014. It’s not safe for people, says the City.

Coincidentally, being able to put in at Woodway allows the public to float down Buffalo Bayou through the historic natural area that the City and County want to obliterate. That nearly 1.5-mile stretch of the river further downstream is one of the last remaining wild reaches of our 18,000-year-old mother bayou. So keeping the put-in closed makes it more difficult for people to see the majestic very old cliffs, lovely forested banks, and sandy beaches of this little known wilderness area that will be destroyed.

Officially it’s not a boat launch at all, which is why it is closed, although it might be a boat launch again sometime in the future, according to Rick Dewees, assistant parks department director in charge of Memorial Park, and Sarah Newbery, the Uptown TIRZ 16 project director for the Memorial Park Master Plan. The Uptown TIRZ 16 financed the project at Woodway with taxpayer funds.

But wait, what’s that gently sloping, winding paved ramp leading down to the water?

That’s not for people; that’s only for maintenance trucks, said Dewees. Newbery agreed.

Read the rest of the story.

Opponents of Bulldozing Wild Banks of Buffalo Bayou Shut Out of Meeting

 

Harris County constable protecting secret meeting of engineers and developers from potential disruption by overly polite defenders of Buffalo Bayou. Photo by Dave Fehling, KUHF.

Harris County constable protecting secret meeting of engineers and developers from potential disruption by overly polite defenders of Buffalo Bayou. Photo by Dave Fehling, KUHF.

Oct. 30, 2014

Nobody Was Pepper-Sprayed But Door-Holding Constables Didn’t Smile Either

The unsurprising vote was 18-1 Monday, Oct. 27, 2014, in favor of stripping the forested banks, dredging, channelizing, and rerouting the last natural stretch of Buffalo Bayou as it flows past our great Memorial Park in the middle of Houston.

The Harris County Flood Control Task Force, dominated by engineers, builders, architects, bankers, developers, and realtors, voted behind closed doors on secret ballots to spend $4 million in tax money to make our wild Buffalo Bayou a bigger drainage ditch for development of west Houston. That seems to be the gist of it. Along with helping the River Oaks Country Club shore up the banks of its currently being renovated golf course. The club, which owns half the property in the project, is contributing one-third of the $6 million cost.

Whether the experimental project will work is another question. But hey, if it washes out, it’s only beautiful public parkland and a stretch of the river that teaches us the healthy benefits of what natural rivers do.

Evelyn Merz, the Sierra Club representative, cast the lone opposing vote. Representatives of the Citizens Environmental Coalition and the Audubon Society did not attend the meeting, as far as we could tell. The representative of the League of Women Voters apparently voted in favor.

Task Force Chairman Ranney McDonough of McDonough Engineering refused to allow Merz to speak, though she tried.

“It wasn’t always like that,” recalls Frank C. Smith Jr., past chairman of the task force, who was allowed into the meeting as a guest of Merz. In the past, says Smith, the task force was more evenly balanced between development and environmental interests.

The thirty-one members of the little-known task force, founded in 1973 through the efforts of citizen activists like Smith, are appointed by the Harris County Commissioners’ Court. It is an advisory body, and the vote Monday was symbolic. A committee of the task force, appointed to “investigate” the controversial project, voted 5-1 in favor of it Oct. 15. Again, Merz was the only negative vote.

The Army Corps of Engineers is considering whether to issue a permit to the Harris County Flood Control District for the project, known officially as the Memorial Park Demonstration Project.

The Houston city council has already voted to waste $2 million on destroying an irreplaceable natural resource in the middle of the city. However, councilmembers must eventually vote on whether the test experiment (the often-failing techniques haven’t been proven to work on a river like ours) is a legal taking and use of public parkland according to state law.

So let your city council representatives know what you think about that.

Listen to Dave Fehling’s report on the meeting on KUHF 88.7.

 

 

 

 

A Bold Stand on Buffalo Bayou from A Long-Time Conservationist

It’s time again to stop the bulldozers on the bayou

Flood-control plans are a ‘tragic, misguided, destructive experiment’

October 24, 2014 | Updated: October 24, 2014 5:22pm

I feel responsible.

In 1966 Terry Hershey asked me to join with her, George Mitchell, and then Congressman George Bush in their campaign to stop the Army Corps of Engineers and the Harris County Flood Control District from bulldozing the natural banks of Buffalo Bayou near our homes on the west side of Houston.

At the time none of us knew what we know now: that the trees and vegetation that grow on the bayou’s banks are so important to the quality of our water, to erosion and flood control. We just knew that we preferred and respected nature. My house backed up to the bayou, and I let the enchanting forest back there grow wild. I was one of the only homeowners in our small neighborhood on the river who never had problems with erosion. Others who cut down the wild trees and plants saw their backyard gardens and lawns wash away.

We stopped the bulldozers on the bayou back then, and at other times too over the years. The organization that we formed became the Bayou Preservation Association, and eventually I became the president of it. I am still on the executive committee of the BPA, as it is called, though the organization no longer serves the cause of preservation. The BPA has lost its way.

Read the rest of the editorial in Gray Matters in the Houston Chronicle.

Great egrets flying past Memorial Park. The banks here will be bulldozed, and the bayou filled in and a new channel cut further south  through River Oaks Country Club property.

Great egrets flying past Memorial Park. The banks here will be bulldozed, and the bayou filled in and a new channel cut further south through River Oaks Country Club property. Photo by Jim Olive.

KUHF Radio Broadcast Room Filled With Smoke from Burning Pants

Oct. 13, 2014

An Outstanding Job by Environment Reporter Dave Fehling on Buffalo Bayou and the Importance of Riparian Forest

Dave Fehling did an outstanding job of reporting for the Houston Matters radio show on the Buffalo Bayou bulldozing project that aired last Wednesday, Oct. 8, 2014. (Segment starts at 18:35.) Fehling is Houston Public Media’s State Impact reporter for Energy and the Environment.

Most importantly Fehling recognized and addressed the main issue completely ignored by the project promoters: the importance of riparian forest, which is basically wetlands necessary for cleansing our waters, controlling erosion and flooding, and providing wildlife habitat. (Yes, in addition to clean water, we need hawks and dragonflies and alligator snapping turtles to survive. We are all linked in the chain of nature.)

This project would destroy most of the perfectly healthy riparian buffer along almost 1.5 miles of the last natural stretch of our 18,000 year-old Buffalo Bayou as it flows between Memorial Park and the Hogg Bird Sanctuary on the north and the golf course of the River Oaks Country Club on the south. (The club happens to be in the process of rebuilding its entire golf course.)

Two important points that we’d like to clarify and that are causing confusion in the public mind:

  1. This is not a disagreement between conservationists. This is a battle between conservationists on the one side and developers and profiteers on the other. The influential Bayou Preservation Association, which was instrumental in creating this project and which continues to be its strongest advocate, is no longer a preservation group. The president of the BPA works for the Energy Corridor District, the development agency for the Katy Prairie in West Houston, one of the fastest growing areas in Houston and source of Buffalo Bayou. The BPA board is heavy with representatives of major engineering, construction, and landscape design companies. On the board is a representative of KBR, the engineering contractor for this bayou project. Representatives of the flood control district sit on the advisory board.
  1. This area is not suffering from severe erosion. See below.

Read the rest of this story.

Edible smart weed and young box elder, black willow, and sycamore building a new riparian forest on a sandy marsh of Buffalo Bayou in Memorial Park. Great white egret in the background. Photo taken on October 6, 2014, by Susan Chadwick.

Edible smart weed and young box elder, black willow, and sycamore building a new riparian forest on a sandy marsh of Buffalo Bayou in Memorial Park. Great white egret in the background. Photo taken on October 6, 2014, by Susan Chadwick.

The Memorial Park Master Plan and the Survival of Buffalo Bayou

Sept. 20, 2014

Nobody wanted to mention the strange plan to bulldoze our wild Buffalo Bayou in Memorial Park and they wouldn’t let us put out our flyers at the Memorial Park Conservancy meeting in the El Dorado Ballroom on Wednesday, Sept. 17, 2014, to introduce the beginnings of a new master plan for the park. The previous master plan in 2004 recommended that this last remaining stretch of wild bayou be left alone as a valuable educational tool about nature and its dynamic process. The conservancy, a private, non-profit organization charged with protecting and preserving the 1500-acre park, has decided to ignore that recommendation and supports razing the riparian forest, dredging, channelizing, rerouting, and destroying the ecosystem of this stable, functioning reach of the bayou. Because.

Well, few people understand what the purpose of this bizarre project is, and we have talked to some certified geniuses about it. Proponents call it erosion control, flood control, invasive species control, “restoration,” but none of it explains the massive amount of destruction planned or why they are using long-discredited channelizing methods that likely will result in more erosion, more flooding, and the whole artificially reconstructed bayou washing out, along with whatever native vegetation they plant there.

Read the rest.

Topographic map of Buffalo Bayou on the southern edge of Memorial Park, 2013.

Topographic map of Buffalo Bayou on the southern edge of Memorial Park, 2013.

Learning How Rivers Work and Why Bulldozing Wild Buffalo Bayou Won’t Work

Sept. 18, 2014

If more city people understood how rivers work, they would know why our wild Buffalo Bayou should be left alone in and around Memorial Park and why the project to bulldoze it is pointless, wrong, and won’t work.

Interested in learning about the living process of a stream and the importance of riparian zones? Want to find out more about proper land use and management to protect riverfront property against erosion?

Save Buffalo Bayou is developing an educational program about urban riparian areas. But the basic principles are the same for streams in the city and in the country. For now you can learn from an expert at Texas A&M.

The Texas Riparian Association is holding a Riparian and Stream Ecosystem Workshop on September 24, 2014, from 8 am to 4 pm at Whites Park Community Center, 219 White Memorial Park Road in Hankamer near Anahuac, about an hour east of Houston.

Read the rest.

Riparian forest on Buffalo Bayou. Photo by Jim Olive.

Riparian forest on Buffalo Bayou. Photo by Jim Olive.

Memorial Park, the Master Plan, and Our Wild Buffalo Bayou

Sept. 15, 2014

Proposals for a new master plan for Memorial Park will be presented at a public meeting on Wednesday, Sept. 17, from 6 to 8 p.m. at the Eldorado Ballroom, 2310 Elgin Street. Anyone concerned about the future of our great Memorial Park and Buffalo Bayou as it  flows past the park will want to attend this meeting, one of four “update” meetings scheduled about the plan over the next several months.

The prominent national landscape architecture firm of Nelson Byrd Woltz is leading development of the plan. Thomas Woltz, principal of the firm, and his team will share results of their research and analysis, as well as initial design concepts at the Wednesday meeting co-hosted by Houston City Council Members Dwight Boykins and Robert Gallegos.

Do Nothing to Our Wild Bayou is the Best Policy

The last master plan for Memorial Park in 2004 recommended that nothing be done to disturb the natural environment of Buffalo Bayou. After extensive analysis by a team of fluvial geomorphologists and hydraulic engineers, the plan wisely concluded that “the recommended course of action for the Bayou is simply to leave it alone and consider it a symbol of dynamic natural process. The Bayou can serve as a valuable environmental education tool that depicts the change inherent in nature.”

It is not yet known, to us at least, what recommendations the new master plan will make about our treasured last stretch of wild bayou in Houston. However, contradicting the clear conclusions of the 2004 master plan, the Memorial Park Conservancy officially and actively supports the Bayou Preservation Association‘s bizarre project to bulldoze the bayou’s riparian forest, level and grade the banks and cliffs, dredge, channelize, and reroute the bayou. This would forever destroy a valuable and historic natural resource in our great public park, an amazing oasis of riverine wilderness in the middle of the city.

Read the rest.

1915 USGS topographic map of Buffalo Bayou in the area to be bulldozed by a project supported by the Memorial Park Conservancy and the Bayou Preservation Association.

1915 USGS topographic map of Buffalo Bayou in the area to be bulldozed by a project supported by the Memorial Park Conservancy and the Bayou Preservation Association.

The Bad Things That Happen When You Strip Forest from the Banks of Bayous

Aug. 2, 2014

We Have Forgotten The Wisdom of Our Predecessors

The early settlers knew better than to cut down the trees and vegetation from the banks of Buffalo Bayou and other streams.

HCC8

Erosion control by cutting trees and vegetation and disturbing soil along the banks of Buffalo Bayou as it passes by the Houston Country Club.

Even where they set up sawmills along the bayou in the 1820s and ’30s, the mill owners had the common sense to leave the trees standing along the riverbank to protect the land from erosion, says Janet Wagner, chair of the Harris County Historical Commission.

Before that, says Wagner, the indigenous people who lived and camped along the bayou left the riparian forest intact, understanding its importance for holding the banks in place, cleansing and cooling the waters, slowing storm waters, providing fish and wildlife habitat, and much more.

The Harris County Flood Control District, in a wrongheaded plan promoted by the Bayou Preservation Association and supported by the Memorial Park Conservancy and the City of Houston, is proposing to strip most of the riparian forest buffer from some of the last wild banks of Buffalo Bayou in Houston. Known as the Memorial Park Demonstration Project, the controversial $6 million project is demonstrating to landowners up and down the bayou and elsewhere exactly what they should not do to protect their property. Preservation of riparian zones along waterways is both federal and state policy, but apparently the city and the county have not yet understood that message.

Recently the flood control district announced another misguided restoration” project to strip trees and vegetation from the banks of a tributary of Greens Bayou.

The costly experience of the Houston Country Club ought to be instructive. The club not too long ago bulldozed a significant amount of trees and vegetation from the banks of Buffalo Bayou as it passes by the club golf course in Tanglewood. This was a project designed by the engineering firm AECOM, which also designed the failing “erosion control” project in the former Archery Range in Memorial Park at Woodway. A representative of AECOM sits on the board of the Bayou Preservation Association.

Watch this slide show of the disastrous results of razing riparian forest at the Houston Country Club. The photographs were taken on June 27, 2014, and annotated by geophysicist Richard Hyde, a longtime supporter of Buffalo Bayou.

 

Here is another shocking slide show of  photographs taken almost three months earlier on April 2, 2014, of the same, formerly forested area of the Houston Country Club. (See comparison aerial photos below.) The photos were provided by Evelyn Merz, conservation chair of the Houston Regional Group of the Sierra Club. Note in the photos shown above how much more damage had been done three months later.

The flood control district proposes to bulldoze, dredge, and trample with heavy equipment nearly 1.5 miles of Buffalo Bayou and its banks as it flows between Memorial Park and the Hogg Bird Sanctuary on the north and the River Oaks Country Club on the south. The taxpayers of Houston and Harris County are paying $4 million and the country club $2 million for this project.

The Army Corps of Engineers is currently considering whether to issue a permit for the project to the flood control district.

Buffalo Bayou before it was stripped of forest by the Houston Country Club.

Buffalo Bayou before it was stripped of forest by the Houston Country Club.

Buffalo Bayou after forest was razed along parts of the Houston Country Club golf course.

Buffalo Bayou after forest was razed along parts of the Houston Country Club golf course.

Reminder: Meeting With City Council Members Representing Buffalo Bayou

July 29, 2014

Public Meeting with Council Members Pennington and Cohen

It’s about Shepherd Drive, but go and ask why they support the project to destroy Buffalo Bayou.

Plus The Top Ten Reasons They Give for The Awful Project and The Correct Answers

Don’t forget the public meeting  tonight (Wednesday, July 30, 2014) with City Council Members Oliver Pennington (District G) and Ellen Cohen (District C), who represent the wild banks of Buffalo Bayou to be bulldozed by the misguided project known as the Memorial Park Demonstration Project. Even the natives and the early settlers (including mill owners) knew better than to cut down the riparian forest on Buffalo Bayou, recognizing its importance for naturally controlling erosion of the banks, slowing storm waters, filtering pollution and bacteria, trapping sediment, and providing wildlife habitat.

Otter emerging from its den on a tributary of Buffalo Bayou. Photo courtesy of Dewey Stringer.

Otter emerging from its den on a tributary of Buffalo Bayou. Photo courtesy of Dewey Stringer.

Cohen represents Memorial Park, which belongs to all of us. And Pennington, who is running for mayor, represents the south bank of the project, owned by the River Oaks Country Club, stewards of the riparian forest for which it is named since 1923. Pennington also represents that little-known section of Memorial Park just west of 610, now known as the Bayou Woodlands, formerly the Archery Range. There, just off Woodway, a failing “erosion control” project is spewing mud and silt into the bayou. Previously this was a lovely forested ravine with a nature trail. The TIRZ 16, encompassing the Galleria area, now including Memorial Park, and a special kind of improvement district that gets to keep and spend tax money that would have gone into the city treasury, spent $1,147,934 on this particular drainage boondoggle designed by engineering firm AECOM, which also designed the failing “erosion control” project on the banks of the Houston Country Club.

So go and ask these city council members why they support the destruction of some of the last best, healthiest and most beautiful bayou we have in the city. The project would destroy nearly 1.5 miles of the bayou, including most of the forest on both banks, dredging up and rechanneling our lovely, shady stream, obliterating creeks and prehistoric bluffs too old even to contemplate, killing and driving away wildlife, trampling and removing habitat, and so much more that is wrong. The Army Corps of Engineers is considering whether to issue a permit for the project.

The meeting, held in conjunction with the city Public Works and Engineering Department, is from 6 to 7:30 p.m. at St. Anne’s Catholic Church (St. Basil’s Hall), 2140 Westheimer Road. The purpose is to review a paving and drainage project, set to begin in a few weeks, on Shepherd Drive from Westheimer to Buffalo Bayou. So it’s not exactly about the bayou project. But there will be a question and answer period.

Here are the Top Ten Reasons they give for destroying the bayou and how to answer.

 

 

« Previous PageNext Page »