Support Your Forest on Buffalo Bayou

Annual District G Meeting with City Officials Thursday, March 3

March 2, 2016

Citizens concerned about our forests on Buffalo Bayou will want to attend the annual District G Capital Improvement Plan meeting tomorrow evening, March 3, 2016. The meeting starts at 6:30 p.m. in the Stratford High School Auditorium, 14555 Fern Drive, and features the district’s new city council member, Greg Travis, who was elected to City Council District G last November.

Capital Improvement Plan meetings “afford citizens an opportunity to learn, voice their concerns and address their respective City Council Members and City of Houston officials regarding project planning and delivery,” according to a statement on Travis’ website.

District G extends along Buffalo Bayou from Shepherd Drive to Barker Reservoir in far west Houston.

Members of Save Our Forest, which was successful last year in persuading the City of Houston to drop its plan to raze forest in Terry Hershey Park for a stormwater detention basin, are urging citizens to “show your support for the forest to our new City of Houston administration.”

“We now have a new city council representative, a new mayor and a new [Public Works and Engineering] director since we began our campaign to Save Our Forest,” wrote community activist George Crosby in an email. “It is important that they know how much you care about Buffalo Bayou.

The banks of Buffalo Bayou in Terry Hershey Park in West Houston. Straightened and channelized by the Army Corps of Engineers in the 1940s to speed storm waters, the bayou has since restored itself but remains threatened by public projects to slow storm waters.

The banks of Buffalo Bayou in Terry Hershey Park in West Houston. Straightened and channelized by the Army Corps of Engineers in the 1940s to speed storm waters, the bayou has since restored itself but remains threatened by public projects to build detention basins.

Detention Alternatives Without Destroying Forests

“Last year there were two major rainfall events which caused structural flooding in Houston.  Regional detention alternatives that can reduce local flooding without having to destroy the forested areas of Buffalo Bayou are not happening. Cooperation between the City, County and Federal governments is required for a successful regional detention initiative.

“A cooperative inter-governmental effort begins with the City of Houston understanding our support for this approach.  Please help us give emphasis to Save Our Forest,“ wrote Crosby.

The public forests of Buffalo Bayou are still threatened by a Harris County Flood Control District plan to build some 24 detention basins on both banks of Buffalo Bayou in Terry Hershey Park.

The flood control district is also waiting for a federal permit to raze the forest along more than 1.25 miles of one of the last natural stretches of the bayou as it flows past Memorial Park and the Hogg Bird Sanctuary.

It makes no scientific sense to destroy forests to create detention basins. Forests provide valuable natural detention by slowing, absorbing, and deflecting rainwater, in addition to many other valuable ecological services, including cleansing and filtering the water and protecting against erosion.

In October of 2015, the Obama administration issued an executive order directing all federal agencies to incorporate the value of ecosystem services in their decision-making.

In addition, the Harris County Flood Control District is obligated by state law to conserve forests. (PDF. See page 6.)

 

 

 

The TIRZ, Parks, and the Texas Constitution

Feb. 27, 2015

Here’s the report from the Feb. 25, 2015, Uptown TIRZ 16 board meeting about when the once-a-boat launch on Buffalo Bayou  in Memorial Park at Woodway might be reopened.

Please note that Texas constitution guarantees the right of the people to access navigable waterways through public land.

The fenced-off Parks and Wildlife Paddling Trail takeout, referred to by the TIRZ as the “Woodway outfall,” is in need of a guardrail above a steep drop-off, parking reserved for the handicapped, and a gate that allows the park area to be closed at night, according to Sarah Newbery, the TIRZ 16 project director for Memorial Park.

The bayou access point on public land west of Loop 610 has been surrounded by a locked, curtained fence and closed to the public without explanation for almost a year since construction and landscaping were completed on the $1.36 million “erosion control” and drainage improvement project. The larger park area, known as the Old Archery Range, has been closed without explanation for nearly a decade.

The Houston Parks and Recreation Department is reviewing plans for the guardrail, parking, and permanent access gate for the former boat launch, Newbery told the board members meeting on the seventeenth floor of 1980 Post Oak in the Galleria. The TIRZ expects to send the plans out to bids in April and to finish construction by August, Newbery reported.

There will be a sign on the site by next week explaining all this to the public, said Newbery.

But why should the public not have access to the bayou through the park now, since there appears to be no legal or even safety reason why this part of the park should not be open in the meantime? The parks department could erect a temporary guardrail above any drop-off it deems dangerous, as it has done in Buffalo Bayou Park. There’s already a gate and a parking lot.

Read the rest of this story.

Bayou Preservation Association Will Attempt to Explain Position in Favor of Destroying Bayou

Jan. 20, 2015

Steve Hupp of the Bayou Preservation Association will attempt to explain tonight (Tuesday, Jan. 20, 2015) why the BPA supports a project that violates its founding purpose of preserving Buffalo Bayou. Hupp will defend the Memorial Park Demonstration Project we oppose at a regular meeting of the Briar Forest Super Neighborhood at 6:30 p.m.

Briar Forest has been fighting Harris County plans to destroy riparian forest for detention basins along the south side of Buffalo Bayou in Terry Hershey Park between Dairy Ashford and Memorial. Terry Hershey Park is a named after one of the founders of the BPA.

The meeting is at the Briarwood School, 12207 Whittington.

Pettibone surveys the "restoration" of the wild banks of Buffalo Bayou.

Pettibone surveys the “restoration” of the wild banks of Buffalo Bayou.

Will the New Memorial Park Master Plan Be for the People?

Nov. 5, 2014

Public Meeting Monday, Nov. 10, 2014, on proposals for a new Memorial Park Master Plan.

The prison-grade fence preventing access to the $1.3 million landscaped not-a-canoe launch and secret wild woods with spring-fed pool in Memorial Park west of 610.

The prison-grade fence preventing public access to the $1.3 million SWA Group- landscaped not-a-canoe launch and secret wild woods with spring-fed pool in Memorial Park west of 610.

The Memorial Park Conservancy, Houston Parks and Recreation Department, and the Uptown Houston TIRZ are holding the second of four community meetings Monday, Nov. 10, 2014, about proposals for a new $1.8 million Memorial Park Master Plan.

The meeting will be from 6:30 to 8:30 p.m. in the White Oak Conference Center, 7603 Antoine Drive, 77004.

Go and ask them why they have locked up an entire forested section of our Memorial Park south of Woodway west of 610 and closed off access from there to Buffalo Bayou, access that historically had always been open to the public.

As far as we know, which is not much, the proposals for the new master plan make no mention of Buffalo Bayou. The previous master plan from 2004 recommended that the bayou be left alone as “a symbol of dynamic natural process.”

The 2004 plan reported that “a study of the Bayou’s dynamics and stability concluded that, after adjusting to increased urban runoff and water management structures upstream, the Bayou is vertically and horizontally stable, i.e., it is not deepening its channel nor is it dramatically widening its path.”

The landscape architecture firm of Nelson Byrd Woltz is leading the development of the new master plan. The City of Houston and the Uptown TIRZ plan to spend  $100 to $150 million in tax money on capital improvements to the park in the next twenty years. None of that money is for park maintenance.

A Bold Stand on Buffalo Bayou from A Long-Time Conservationist

It’s time again to stop the bulldozers on the bayou

Flood-control plans are a ‘tragic, misguided, destructive experiment’

October 24, 2014 | Updated: October 24, 2014 5:22pm

I feel responsible.

In 1966 Terry Hershey asked me to join with her, George Mitchell, and then Congressman George Bush in their campaign to stop the Army Corps of Engineers and the Harris County Flood Control District from bulldozing the natural banks of Buffalo Bayou near our homes on the west side of Houston.

At the time none of us knew what we know now: that the trees and vegetation that grow on the bayou’s banks are so important to the quality of our water, to erosion and flood control. We just knew that we preferred and respected nature. My house backed up to the bayou, and I let the enchanting forest back there grow wild. I was one of the only homeowners in our small neighborhood on the river who never had problems with erosion. Others who cut down the wild trees and plants saw their backyard gardens and lawns wash away.

We stopped the bulldozers on the bayou back then, and at other times too over the years. The organization that we formed became the Bayou Preservation Association, and eventually I became the president of it. I am still on the executive committee of the BPA, as it is called, though the organization no longer serves the cause of preservation. The BPA has lost its way.

Read the rest of the editorial in Gray Matters in the Houston Chronicle.

Great egrets flying past Memorial Park. The banks here will be bulldozed, and the bayou filled in and a new channel cut further south  through River Oaks Country Club property.

Great egrets flying past Memorial Park. The banks here will be bulldozed, and the bayou filled in and a new channel cut further south through River Oaks Country Club property. Photo by Jim Olive.

The Memorial Park Master Plan and the Survival of Buffalo Bayou

Sept. 20, 2014

Nobody wanted to mention the strange plan to bulldoze our wild Buffalo Bayou in Memorial Park and they wouldn’t let us put out our flyers at the Memorial Park Conservancy meeting in the El Dorado Ballroom on Wednesday, Sept. 17, 2014, to introduce the beginnings of a new master plan for the park. The previous master plan in 2004 recommended that this last remaining stretch of wild bayou be left alone as a valuable educational tool about nature and its dynamic process. The conservancy, a private, non-profit organization charged with protecting and preserving the 1500-acre park, has decided to ignore that recommendation and supports razing the riparian forest, dredging, channelizing, rerouting, and destroying the ecosystem of this stable, functioning reach of the bayou. Because.

Well, few people understand what the purpose of this bizarre project is, and we have talked to some certified geniuses about it. Proponents call it erosion control, flood control, invasive species control, “restoration,” but none of it explains the massive amount of destruction planned or why they are using long-discredited channelizing methods that likely will result in more erosion, more flooding, and the whole artificially reconstructed bayou washing out, along with whatever native vegetation they plant there.

Read the rest.

Topographic map of Buffalo Bayou on the southern edge of Memorial Park, 2013.

Topographic map of Buffalo Bayou on the southern edge of Memorial Park, 2013.

Memorial Park, the Master Plan, and Our Wild Buffalo Bayou

Sept. 15, 2014

Proposals for a new master plan for Memorial Park will be presented at a public meeting on Wednesday, Sept. 17, from 6 to 8 p.m. at the Eldorado Ballroom, 2310 Elgin Street. Anyone concerned about the future of our great Memorial Park and Buffalo Bayou as it  flows past the park will want to attend this meeting, one of four “update” meetings scheduled about the plan over the next several months.

The prominent national landscape architecture firm of Nelson Byrd Woltz is leading development of the plan. Thomas Woltz, principal of the firm, and his team will share results of their research and analysis, as well as initial design concepts at the Wednesday meeting co-hosted by Houston City Council Members Dwight Boykins and Robert Gallegos.

Do Nothing to Our Wild Bayou is the Best Policy

The last master plan for Memorial Park in 2004 recommended that nothing be done to disturb the natural environment of Buffalo Bayou. After extensive analysis by a team of fluvial geomorphologists and hydraulic engineers, the plan wisely concluded that “the recommended course of action for the Bayou is simply to leave it alone and consider it a symbol of dynamic natural process. The Bayou can serve as a valuable environmental education tool that depicts the change inherent in nature.”

It is not yet known, to us at least, what recommendations the new master plan will make about our treasured last stretch of wild bayou in Houston. However, contradicting the clear conclusions of the 2004 master plan, the Memorial Park Conservancy officially and actively supports the Bayou Preservation Association‘s bizarre project to bulldoze the bayou’s riparian forest, level and grade the banks and cliffs, dredge, channelize, and reroute the bayou. This would forever destroy a valuable and historic natural resource in our great public park, an amazing oasis of riverine wilderness in the middle of the city.

Read the rest.

1915 USGS topographic map of Buffalo Bayou in the area to be bulldozed by a project supported by the Memorial Park Conservancy and the Bayou Preservation Association.

1915 USGS topographic map of Buffalo Bayou in the area to be bulldozed by a project supported by the Memorial Park Conservancy and the Bayou Preservation Association.

Reminder: Meeting With City Council Members Representing Buffalo Bayou

July 29, 2014

Public Meeting with Council Members Pennington and Cohen

It’s about Shepherd Drive, but go and ask why they support the project to destroy Buffalo Bayou.

Plus The Top Ten Reasons They Give for The Awful Project and The Correct Answers

Don’t forget the public meeting  tonight (Wednesday, July 30, 2014) with City Council Members Oliver Pennington (District G) and Ellen Cohen (District C), who represent the wild banks of Buffalo Bayou to be bulldozed by the misguided project known as the Memorial Park Demonstration Project. Even the natives and the early settlers (including mill owners) knew better than to cut down the riparian forest on Buffalo Bayou, recognizing its importance for naturally controlling erosion of the banks, slowing storm waters, filtering pollution and bacteria, trapping sediment, and providing wildlife habitat.

Otter emerging from its den on a tributary of Buffalo Bayou. Photo courtesy of Dewey Stringer.

Otter emerging from its den on a tributary of Buffalo Bayou. Photo courtesy of Dewey Stringer.

Cohen represents Memorial Park, which belongs to all of us. And Pennington, who is running for mayor, represents the south bank of the project, owned by the River Oaks Country Club, stewards of the riparian forest for which it is named since 1923. Pennington also represents that little-known section of Memorial Park just west of 610, now known as the Bayou Woodlands, formerly the Archery Range. There, just off Woodway, a failing “erosion control” project is spewing mud and silt into the bayou. Previously this was a lovely forested ravine with a nature trail. The TIRZ 16, encompassing the Galleria area, now including Memorial Park, and a special kind of improvement district that gets to keep and spend tax money that would have gone into the city treasury, spent $1,147,934 on this particular drainage boondoggle designed by engineering firm AECOM, which also designed the failing “erosion control” project on the banks of the Houston Country Club.

So go and ask these city council members why they support the destruction of some of the last best, healthiest and most beautiful bayou we have in the city. The project would destroy nearly 1.5 miles of the bayou, including most of the forest on both banks, dredging up and rechanneling our lovely, shady stream, obliterating creeks and prehistoric bluffs too old even to contemplate, killing and driving away wildlife, trampling and removing habitat, and so much more that is wrong. The Army Corps of Engineers is considering whether to issue a permit for the project.

The meeting, held in conjunction with the city Public Works and Engineering Department, is from 6 to 7:30 p.m. at St. Anne’s Catholic Church (St. Basil’s Hall), 2140 Westheimer Road. The purpose is to review a paving and drainage project, set to begin in a few weeks, on Shepherd Drive from Westheimer to Buffalo Bayou. So it’s not exactly about the bayou project. But there will be a question and answer period.

Here are the Top Ten Reasons they give for destroying the bayou and how to answer.

 

 

Tell the Bayou Preservation Association What You Think About Its Plan to Destroy Buffalo Bayou

July 21, 2014

BPA Board Meeting Tuesday, July 22, at Noon

The Bayou Preservation Association, which is promoting the project to bulldoze Buffalo Bayou, is having a board meeting tomorrow, Tuesday, July 22, at noon. The meeting is open to the public, so go and let the BPA know what you think about its plan to raze nearly 1.5 miles of perfectly healthy riparian forest along both banks of Buffalo Bayou in and around our public Memorial Park. The meeting is in the AECOM Building, 5444 Westheimer, third floor. (Update: The BPA is a private, non-profit organization, and its meetings do not have to be open to the public.)

Do be aware that not everyone on the BPA board nor every member of the BPA supports this ugly boondoggle, which would channelize one of the last remaining stretches of natural bayou left in the city, change the course of the bayou, excavate and fill in the banks, and obliterate magnificent cliffs, lovely creeks, and tributaries. It would replace the shady, wild banks with sun-baked Bermuda grass. Wildlife habitat would be eliminated.

Note that the meeting is in the AECOM Building. AECOM, you may recall, was the engineering contractor for the failing “erosion control” project in Memorial Park at Woodway as well as for the disastrous Houston Country Club erosion control project. (Story about that coming up.)

A representative of AECOM is on the board of the BPA as well as a representative of KBR, the engineering contractor for the Buffalo Bayou project and a major donor to the BPA (along with the Harris County Flood Control District). Also on the BPA board are two property owners (Mike Garver and Terri Thomas) out of the half dozen or so private property owners whose property is to be “restored” by the $4 million taxpayer-funded portion of the $6 million HCFCD project. A major BPA donor (Michael Dishberger) is also a property owner benefiting from the public project.

BPA President Robert Rayburn works as development and natural resource director at the Energy Corridor District, which means promoting development of the Katy Prairie, which means more runoff and storm waters going into the dams and into Buffalo Bayou. The Energy Corridor District has written a letter of support for the project, citing “the importance of biotechnical drainage way stabilization and riparian restoration” [sic] and “the important role that stable, sustainable drainage corridors provide to surrounding properties …”

 

The BPA's natural, sympathetic, holistic plan to help Buffalo Bayou be all it wants to be.

The BPA’s natural, sympathetic, holistic plan to help Buffalo Bayou be all it wants to be.

Another Failed Erosion Control Project on Buffalo Bayou

July 15, 2014

Kayaked down Buffalo Bayou past Memorial Park the other day with geophysicist Richard Hyde, a longtime supporter of Buffalo Bayou, an early member of the Bayou Preservation Association, and an opponent of the BPA’s very bad plan to destroy the natural beauty of Buffalo Bayou in order to … well, no one can quite figure out the purpose of this bizarre and heart-breaking project that would raze over a mile of perfectly fine riparian forest along both banks in and around our great Memorial Park. The proposal, created and promoted by the BPA and officially a project of the Harris County Flood Control District, would also dig up and fill in the bayou, its banks and high bluffs, dam up or bulldoze tributaries, causing enormous loss of land and forest to the River Oaks Country Club, which is paying $2 million for the privilege. It is a mystery why anyone thinks this is a good idea; a mystery how a project with no public benefit and so much public harm ever got funded ($4 million from county and city taxpayers); and a mystery why the BPA, an organization founded to “preserve the natural beauty” of the bayou, would be so hell-bent on eradicating it.

The water was very low — known as base flow, the bayou’s natural flow during fair weather, which is very slow and shallow. Except it wasn’t really base flow because a thunderstorm had just passed over, so even as we were slip-sliding in under the Woodway bridge the water was rising and the current picking up from runoff.

Our first shocking encounter was the new Woodway drainage outfall, recently constructed at a cost of $1,147,934 to Houston taxpayers (i.e. taxes that went to the Galleria area TIRZ 16 rather than into the city treasury). Laughably, this project, no longer under construction but still closed to the public, is described as an “erosion control” project in the TIRZ 16-Uptown 2013-2017 Capital Improvement Plan. “This drainage outflow project is to mitigate erosion in banks of Buffalo Bayou at Woodway,” says the budget description.

Please note the horrific erosion from the dissolving banks of this new massive outfall, the sand and mud clogging the channel, the concrete sidewalk and steps. There were trees here once, and a nature trail. Update 8.4.2014: In 1848, the rock-bottomed ford here was known as “Dutchman’s Crossing.”

Photo taken July 15, 2014, of mud and sand eroding from sides of new drainage outfall at Woodway on Buffalo Bayou.

Photo taken July 15, 2014, of mud and sand eroding from sides of new drainage outfall at Woodway on Buffalo Bayou.

The budget shows no funds allocated for operating and maintenance.

The big, new drainage pipe was also supposed to be set at an angle that allowed the often powerful flow of water to be released in the direction of the flow of the bayou, instead of shooting directly at the opposite bank. But apparently someone forgot to tell that to AECOM, the engineers who designed the project (as well as the tragically unsuccessful “erosion control” project at the Houston Country Club, which razed much of the riparian forest buffer on the banks of Buffalo Bayou along its golf course). AECOM designed the Woodway outfall so that the water blasts directly at the opposite bank, which is already being eaten away by the force.

The big new outfall shoots stormwater directly across the bayou at the opposite bank. Oops. Maybe they want the bayou to erode?

The big new outfall shoots storm water directly at the opposite bank and sediment into the bayou. Oops. Maybe “erosion control” means “increasing erosion”?

Mr. Hyde just shook his head.

This “erosion control” project is in City Council Member Oliver Pennington’s district and Mr. Pennington is running for mayor, as he tells everyone he meets, so be sure to let him know what you think about Mr. Pennington’s “erosion control.” He’s holding a public meeting on Wednesday, July 30, 2014, from 6:00 to 7:30 pm at St. Anne’s Catholic Church, St. Basil’s Hall, 2140 Westheimer (at the corner of Shepherd). The meeting is to discuss “storm drainage improvements” on Shepherd from Westheimer to Buffalo Bayou. The project is scheduled to begin in a few weeks and will last over a year, so it’s very kind of Mr. Pennington to offer a public meeting about it.

Mr. Pennington supports the “erosion control” project that requires razing the wild banks and destroying our natural bayou in and around Memorial Park. So let him know what you think about that too. Might be time to bring out the pitchforks pickets and banners.

To be continued.

 

 

 

 

Next Page »