What Do The Candidates Think?
We Asked Them
Election is Saturday, Dec. 12, 2015
Dec. 10, 2015
What do the candidates think about spending $4 million in public funds to destroy and “restore” one of the last natural stretches of Buffalo Bayou in Houston?
What do the candidates think now in light of the failing banks of Buffalo Bayou Park downstream, a signature $53.5 million project long touted by the Harris County Flood Control District and that park’s landscape designer SWA Group as a model for what should be done upstream in Memorial Park?
We asked them. And if they did not respond to our email, we called them today (Thursday, Dec. 10, 2015) to make sure that they received the email and asked again for a response.
The runoff election is Saturday, Dec. 12. Here are the responses we received. Maybe their answers or non-answers will help you decide how to vote.
Buffalo Bayou Doesn’t Like Sidewalks, It Seems
Buffalo Bayou Park Was Supposed to Be More Stable
Nov. 16, 2015
Updated Nov. 17, 2015
Update: “Endless Repairs: Buffalo Bayou Sets Its Own Terms,” Houston Chronicle, Nov. 20, 2019
Well, we can’t help but wonder if constantly scraping and repairing the sidewalks, forever reinforcing the collapsing banks somehow, and repeatedly replacing the trees and landscaping is fully covered by the $2 million annual maintenance budget for Buffalo Bayou Park paid by Houston city taxpayers.
The popular, much praised, and much needed park on the banks of the bayou between Allen Parkway and Memorial Drive is suffering from some serious erosion problems. And that matters to us not just because of the expense and waste. This $53.5 million project, a boon to adjacent property owners and those who live and work nearby, was touted as a successful example of what the Harris County Flood Control District, egged on by the Bayou Preservation Association, wants to do to our healthy, historic wild bayou further upstream in and around Memorial Park. Buffalo Bayou Park was supposed to be more stable! The flood control district calls it Natural Stable Channel Design, but it always looked to us like they were doing everything you’re not supposed to do on the banks of streams: dig up the banks, run heavy equipment over the banks, remove the trees and vegetation (yes, they did a lot of that), build concrete and asphalt sidewalks on the banks, plant grass and mow it.
Let’s Work With Nature, Not Against It
Once you’ve done all that, and the banks and channel start falling apart, it’s pretty difficult to fix it. Best to let the bayou do what it will do anyway. (And eventually the bayou will rebuild and replant it all.) But it seems unlikely that the City and the Buffalo Bayou Partnership are going to sit back and patiently let millions of dollars worth of sidewalks, lamps, and bridges collapse into the bayou. Can they stop it? Time will tell.
In the meantime, it does make one wonder about all those concrete trails they are carving out of the banks and floodplains of the bayous for the Bayou Greenways project. A nice idea, but is that going to work?
Here’s what we’re talking about. What this slide show of photos of Buffalo Bayou Park between Shepherd and Montrose taken on Nov. 15, 2015 (and updated with later photos).
Update on Puzzling Project to Bulldoze Wild Buffalo Bayou
Damaging, Expensive, Contradictory Plan Still Threatens
Conflicts Still Apparent, Purpose Still Unclear
No Permit Yet
October 8, 2015
The Harris County Flood Control District has responded to largely critical public comments to the Army Corps of Engineers about Flood Control’s misguided project to destroy one of the last natural stretches of Buffalo Bayou in Houston, a most remarkable asset to have in the middle of a city. The Corps is reviewing the Flood Control District’s responses, says Jayson Hudson, who has been the Corps’ Galveston District project manager for the permit application.
Flood Control must apply for a permit from the Corps of Engineers because the Clean Water Act requires the Corps to ensure that projects on federal waters do not damage the health of our waters. Federal waters are defined as navigable streams (Buffalo Bayou) up to the Ordinary High Water Mark, their tributaries and adjacent wetlands, all of which form the great living veins and arteries of our limited water supply. Some studies argue that all riparian areas , the highly biologically diverse natural gardens and forests along stream banks so vital for clean water, should be considered protected wetlands .
While We Wait
The Flood Control District’s Failing “Natural Channel Design” Projects
July 11, 2015
Well, the comments are in to the Army Corps of Engineers. The comment period that ended June 5 was not extended. So now we wait to find out what the Corps will do next about a permit for the Harris County Flood Control District’s controversial $6 million Memorial Park Demonstration Project. The flood control district wants to destroy one of the last natural stretches of Buffalo Bayou as it flows past Memorial Park in the middle of the city so that engineers can “build it better,” thus demonstrating exactly the wrong thing to do for erosion control and bank stabilization on the bayou.
It’s the wrong thing to do because the specially adapted trees and plants on the bayou (known as the riparian zone) protect the land from erosion, slow storm water and runoff, filter pollution and bacteria (and trash) from the water, provide shade and habitat, among many other vital functions. Razing the riparian buffer, as this project would do, digging up and running heavy equipment over the banks and bayou bottom are all contrary to Best Management Practices and the policies of virtually every federal and state agency charged with protecting the health of our waters, our wildlife habitat, and our soil.
What Are the Options?
So what are the Corps’ options?
Recent Comments