We finally had a chance recently to float down beautiful Buffalo Bayou to see how things have changed. Our trip took us past Memorial Park in the middle of Houston. We also biked along the bayou through Terry Hershey Park far upstream in west Houston below the dams to see what was happening there.

The good news is that some of the high banks that had slumped in Memorial Park and the Hogg Bird Sanctuary during the Memorial Day 2015 flooding are naturally rebuilding.

The bad news is that the River Oaks Country Club has added more riprap to the south bank, hard armoring the bank with ugly, damaging concrete rubble, including where it should not be.

Nature’s Miraculous Way of Restoring. For Free.

Houston has had multiple record-breaking rains and flooding since the spring of 2015. When Buffalo Bayou overflows its high banks, as it did in the Memorial Day flood of 2015, the banks in places sometimes slump or slide away. This happens when the overflowing water seeps through the ground and saturates layers of sandy clay that liquefy, sometimes causing the bank to give way. Buffalo Bayou is 18,000 years old, and this has been happening for a very long time.

This natural tendency to slump is one reason why we think attempting to engineer these banks as proposed by the $6 million Memorial Park Demonstration Project won’t work. It’s also the reason why we think building and repeatedly repairing sidewalks at the bayou’s edge is wasteful and foolish.

Read the rest of this story.

The same high bank three months later on August 4, 2016.

The south-facing high bank of the Hogg Bird Sanctuary collapsed during the Memorial Day flood in 2015. Now self-restored. Photo on August 4, 2016.

It’s Not Dead Yet

Flood Control Still Pushing Costly, Destructive “Stabilization” Project on Buffalo Bayou

July 31, 2016

It’s a pointless, wasteful, ill-conceived, and maybe illegal project to rip up and raze trees and plants and wildlife habitat, dig up the banks, plug up tributaries, dredge and reroute the channel along one of the last natural stretches of Buffalo Bayou in Houston. This is a dreamy stretch of the river in the middle of the city, filled with beaver, otter, alligators, fish and flying creatures, and even edible plants.  It flows for more than a mile past our great public Memorial Park, a natural detention area and significant geologic site that features very old high bluffs and sandstone formations. All of which would be obliterated.

And after almost three years of adamant public opposition, the Harris County Flood Control District is still promoting the project, which will cost the taxpayers at least $4 million plus, not including future costs of maintenance and repair.

It’s mystifying why they want to do this, why they think it would even work, why they don’t realize that the bayou would wash it away or that it would simply all slump away, as has happened in Buffalo Bayou Park downstream, where taxpayers are footing the ever-mounting bill for constantly repairing the banks dug up and stripped of trees and vegetation by Flood Control.

Do They Not Have More Urgent Problems?

Surely, the flood control district has more urgent problems that require our hard-earned tax money. Harris County is one of the most flooded places in the country. And this project, billed as a “stabilization” and “bank restoration” program, will do nothing to address flooding and could even make it worse. The county should focus on the hundreds of miles of channelized bayous and streams unwisely covered in now-aging concrete that should be restored to something more natural and beneficial.

The project, called the Memorial Park Demonstration Project, was first proposed in 2010 by the Bayou Preservation Association under then board chair, Kevin Shanley, landscape architect and principal with SWA Group, the firm responsible for the ugly, obtrusive bridges, collapsing sidewalks, poorly-functioning dog park and non-functioning faux Hill Country fountain and stream in Buffalo Bayou Park.

Read the rest of this post.

Excavate fill

This map prepared by the Harris County Flood Control District shows the areas to be excavated (yellow) and filled (orange) in the proposed Memorial Park Demonstration Project. Note also the rerouting of the channel. Memorial Park and the Hogg Bird Sanctuary, including a tributary, are on the north, with houses in between. The entire south bank is River Oaks Country Club golf course.

Reminder: The Threat is Still Alive

Operation Save Buffalo Bayou II

March 14, 2016

Okay, so we harshed the mood a little with our small, silent reminders that regatta contestants were paddling through a historic natural area still threatened with destruction.

“Thanks for polluting my day,” yelled one paddler in the crowd of hundreds of Buffalo Bayou boaters playing loud music and stopping to pee in the woods. We were watching from the sandy bank of the lovely middle meander, forested with young willows and box elder that would all be cut down, the meander filled, graded, and planted with grass.

The event was the 44th Annual Buffalo Bayou Regatta on Saturday, March 12. And once again we hung our beautiful Save Buffalo Bayou banner (Night Heron by Houston artist Frank X. Tolbert 2) from the railroad bridge and set out small white signs alerting participants to the fact that the wild stretch they were passing through would all be bulldozed under a plan proposed by the Harris County Flood Control District and the Bayou Preservation Association (BPA).

Save Buffalo Bayou banner hanging from the railroad trestle crossing Buffalo Bayou from Memorial Park. Photo March 12, 2016, by Richard Hyde.

Save Buffalo Bayou banner hanging from the railroad trestle crossing Buffalo Bayou from Memorial Park. Photo March 12, 2016, by Richard Hyde.

The project, known as the Memorial Park Demonstration Project, demonstrates exactly the wrong thing to do. (See Buffalo Bayou Park and Fonteno Park.) It would raze most of the trees and vegetation along more than 1.25 miles of the 18,000-year-old bayou as it passes by Memorial Park and the Hogg Bird Sanctuary. These trees and vegetation and even the sand are part of the riparian zone, essentially wetlands, that hold the banks together, cleanse and filter the water, slow and absorb storm runoff, provide wildlife habitat, among many other important ecological functions. The $6 million “natural channel design” project, financed with $4 million in county and city taxpayer funds, would dredge and reroute the bayou and plug tributaries, obliterate ancient cliffs, destroy 250,000-year-old sandstone formations, and fill in our lovely meander (a natural detention area). Killing the bayou’s ecosystem in the name of “restoration.” And landscape design.

And no, contrary to rumors, the project, although holding its breath, is not dead. The Army Corps of Engineers is still deciding whether to issue a permit for the project, which is otherwise a violation of the federal Clean Water Act.

The Bayou Preservation Association first formulated the plan for the project in private meetings in 2010 and  former BPA president Kevin Shanley, then a principal with the landscape architecture firm SWA Group, was the primary promoter. SWA Group is the design firm that is also responsible for the landscape design of Buffalo Bayou Park downstream east of Shepherd.

So this is why we had signs up warning of landscapers lurking. In Buffalo Bayou Park downstream, we set out a few signs pointing out that landscaping has washed away (several times actually) and that removal of vegetation has caused erosion problems, and that repairs were $$$$ (paid with City funds). Yes, we were bad! Those signs did not last long, however.

Educational signs posted on expensive repairs to eroding banks that previously had been "stabilized" by the Harris County Flood Control District in Buffalo Bayou Park. Photo March 12, 2016, by AC Conrad.

Educational signs posted on expensive repairs to eroding banks that previously had been “stabilized” by the Harris County Flood Control District in Buffalo Bayou Park. Photo March 12, 2016, by AC Conrad.

Upstream around Memorial Park and the Hogg Bird Sanctuary our signs pointed out where beavers live, where banks were being naturally rebuilt by the bayou, and the Pleistocene bluffs that would be graded into a slope. Interestingly, the bayou, during and after the Memorial Day flood in 2015, has already graded the lower banks of those steep bluffs into a slope.

The River Oaks Country Club is theoretically a one-third partner in the demonstration project and owns the entire south half of the project reach. But in the meantime the club in two places has armored its banks with ugly concrete riprap, one of the most environmentally destructive methods of erosion control (pdf), and also, we allege, in this case illegal, as we contend that much of the riprap was placed in public waters, also a violation of the Clean Water Act.

The club, unfortunately, is having erosion problems on its high banks in those places because it cut down a lot of trees and extended the mowed and watered grass of its golf course up to the edge of the banks.

We put out signs pointing out that riprap damages the ecosystem and is part of the problem, not the solution.

But we’re glad people had fun, enjoyed the bayou, and picked up some of trash.

Maybe they’ll think about the future of the bayou.

And special thanks to river guide Tom Helm and to Richard Hyde for extra long duty putting out and picking up our banner and picking up our signs.

Support Your Forest on Buffalo Bayou

Annual District G Meeting with City Officials Thursday, March 3

March 2, 2016

Citizens concerned about our forests on Buffalo Bayou will want to attend the annual District G Capital Improvement Plan meeting tomorrow evening, March 3, 2016. The meeting starts at 6:30 p.m. in the Stratford High School Auditorium, 14555 Fern Drive, and features the district’s new city council member, Greg Travis, who was elected to City Council District G last November.

Capital Improvement Plan meetings “afford citizens an opportunity to learn, voice their concerns and address their respective City Council Members and City of Houston officials regarding project planning and delivery,” according to a statement on Travis’ website.

District G extends along Buffalo Bayou from Shepherd Drive to Barker Reservoir in far west Houston.

Members of Save Our Forest, which was successful last year in persuading the City of Houston to drop its plan to raze forest in Terry Hershey Park for a stormwater detention basin, are urging citizens to “show your support for the forest to our new City of Houston administration.”

“We now have a new city council representative, a new mayor and a new [Public Works and Engineering] director since we began our campaign to Save Our Forest,” wrote community activist George Crosby in an email. “It is important that they know how much you care about Buffalo Bayou.

The banks of Buffalo Bayou in Terry Hershey Park in West Houston. Straightened and channelized by the Army Corps of Engineers in the 1940s to speed storm waters, the bayou has since restored itself but remains threatened by public projects to slow storm waters.

The banks of Buffalo Bayou in Terry Hershey Park in West Houston. Straightened and channelized by the Army Corps of Engineers in the 1940s to speed storm waters, the bayou has since restored itself but remains threatened by public projects to build detention basins.

Detention Alternatives Without Destroying Forests

“Last year there were two major rainfall events which caused structural flooding in Houston.  Regional detention alternatives that can reduce local flooding without having to destroy the forested areas of Buffalo Bayou are not happening. Cooperation between the City, County and Federal governments is required for a successful regional detention initiative.

“A cooperative inter-governmental effort begins with the City of Houston understanding our support for this approach.  Please help us give emphasis to Save Our Forest,“ wrote Crosby.

The public forests of Buffalo Bayou are still threatened by a Harris County Flood Control District plan to build some 24 detention basins on both banks of Buffalo Bayou in Terry Hershey Park.

The flood control district is also waiting for a federal permit to raze the forest along more than 1.25 miles of one of the last natural stretches of the bayou as it flows past Memorial Park and the Hogg Bird Sanctuary.

It makes no scientific sense to destroy forests to create detention basins. Forests provide valuable natural detention by slowing, absorbing, and deflecting rainwater, in addition to many other valuable ecological services, including cleansing and filtering the water and protecting against erosion.

In October of 2015, the Obama administration issued an executive order directing all federal agencies to incorporate the value of ecosystem services in their decision-making.

In addition, the Harris County Flood Control District is obligated by state law to conserve forests. (PDF. See page 6.)

 

 

 

Fighting For Our Public Forests on Buffalo Bayou

On the Radio

Forests Work for Us

Oct. 28, 2015

Listen to Susan Chadwick of Save Buffalo Bayou and Landrum Wise of Save Our Forest talk about community campaigns to protect public forest along some twelve miles of Buffalo Bayou in Houston.

They spoke with Pat Greer and H.C. Clark on Eco-Ology on KPFT 90.1 Tuesday, Oct. 27, 2015, about efforts to keep the City of Houston and the Harris County Flood Control District from destroying woodlands on Buffalo Bayou in Memorial Park in the center of Houston and in Terry Hershey Park in far west Houston.

In addition to their great social value and benefit to our health, well-being, and quality of life, the trees and vegetation that grow naturally along the bayou perform vital ecological services and are a key part of the bayou’s living system. Known as riparian zones or buffers, these specially adapted trees and plants cleanse and filter pollutants from the water. They protect the banks from erosion, absorb and slow storm water runoff and provide natural flood detention. They shade us and cool the stream, and provide wildlife habitat.

Legally Required to Conserve Harris County Forests

The Harris County Flood Control District, according to its 1937 charter, is charged by state law with conserving forests in the county. (See page six.) But for decades the district has been razing forests to build storm water detention basins on our bayous, creeks, tributaries, and elsewhere, and to re-engineer channels and banks. Detention basins are used to hold or slow temporarily surface runoff or high flows in a stream during storms.

The flood control district’s project on Buffalo Bayou in Memorial Park, known as the Memorial Park Demonstration Project, would raze some 80 percent of the trees and vegetation along more than 1.25 miles of the bayou and its tributaries in Memorial Park and the Hogg Bird Sanctuary. The Army Corps of Engineers, which enforces the federal Clean Water Act, is currently considering whether to issue a permit for the controversial $6 million project, which is described by flood control as an “erosion control” and “bank stabilization” project. The project violates Best Management Practices for riparian areas. Virtually every federal and state resource agency has policies and regulations protecting riparian zones, which perform essentially the same function as federally-protected wetlands.

Recent Success for Save Our Forest

The City of Houston recently withdrew a project to cut down the majority of trees and understory on some 42 acres of public forest and excavate up to six large detention basins on the south bank of Buffalo Bayou in Terry Hershey Park between Beltway 8 and Wilcrest Drive. The Capital Improvement Project was to have cost the taxpayers between $3.5 and $8.5 million.

However, the flood control district appears to be continuing with its widely-opposed “Charting Buffalo” study that proposes as many as 24 storm water detention basins along some 10.7 miles of both banks of Buffalo Bayou in the forests of Terry Hershey Park between Beltway 8 and Highway 6 at Barker and Addicks dams. On Nov. 12, 2013, despite public opposition, Harris County Commissioners Court approved flood control’s request for $250,000 for a vegetation and topography survey in the park.

The headwaters of Buffalo Bayou are on the Katy Prairie west of Houston, and the 18,000-year-old “mother bayou,” fed by numerous tributaries, flows for some 53 miles east through the city and the ship channel into Galveston Bay. Buffalo Bayou, unlike major bayous like White Oak and Brays, which join Buffalo Bayou just west and east of downtown, has never been covered with concrete, though parts of it have been channelized.

Listen to the radio broadcast.

The banks of Buffalo Bayou in Terry Hershey Park in West Houston. Straightened and channelized by the Army Corps of Engineers in the 1940s to speed storm waters, the bayou has since restored itself but remains threatened by public projects to slow storm waters.

The banks of Buffalo Bayou in Terry Hershey Park in West Houston. This 10.7-mile stretch of the bayou downstream from Barker and Addicks dams was straightened and channelized by the Army Corps of Engineers in the 1950s to speed storm waters. The bayou in this park has since restored itself but remains threatened by public flood control projects. Photo Oct. 6, 2015 by Susan Chadwick

 

 

 

Film: Letting the River Heal

Learning to Respect A River’s Natural Process

October 18, 2015

“We have to be patient,” says Steve Nelle, Natural Resources Conservation Service, retired.

“Nature’s going to recover that area at her own timetable in her own way. It’s best to accommodate that natural process.”

Watch this moving and informative 14-minute documentary about a river’s natural process and Best Management Practices for protecting against erosion and preserving a river’s important role in cleansing our water, slowing storm water and runoff, and providing wildlife habitat.

All of this applies to Buffalo Bayou as well as our other bayous, creeks, and streams in Harris County. Even a small riparian buffer of native trees and vegetation a few feet wide is important for our waterways and the cleanliness of the water flowing through our neighborhood streams and into our bays and oceans. But on Buffalo Bayou, especially as it flows past Memorial Park, we are fortunate to have room for the river to move. Letting the river be a river is the most current scientific thinking on river management, even in cities. A dynamic river creates the most beneficial and biologically diverse environment.

Let’s work with nature, not against it.

This lovely, short film was made about the Blanco River and the impact of the 2015 Memorial Day flood on Wimberly, Texas. We can all learn from it.

Watch the film.

Steve Nelle, Natural Resources Conservation Service, retired. Still photo from the documentary, "Letting the River Heal."

Steve Nelle, Natural Resources Conservation Service, retired. Still photo from the documentary, “Letting the River Heal.”

Update on Puzzling Project to Bulldoze Wild Buffalo Bayou

Damaging, Expensive, Contradictory Plan Still Threatens

Conflicts Still Apparent, Purpose Still Unclear

No Permit Yet

October 8, 2015

The Harris County Flood Control District has responded to largely critical public comments to the Army Corps of Engineers about Flood Control’s misguided project to destroy one of the last natural stretches of Buffalo Bayou in Houston, a most remarkable asset to have in the middle of a city. The Corps is reviewing the Flood Control District’s responses, says Jayson Hudson, who has been the Corps’ Galveston District project manager for the permit application.

Flood Control must apply for a permit from the Corps of Engineers because the Clean Water Act requires the Corps to ensure that projects on federal waters do not damage the health of our waters. Federal waters are defined as navigable streams (Buffalo Bayou) up to the Ordinary High Water Mark, their tributaries and adjacent wetlands, all of which form the great living veins and arteries of our limited water supply. Some studies argue that all riparian areas , the highly biologically diverse natural gardens and forests along stream banks so vital for clean water, should be considered protected wetlands .

This beautiful meander, a natural detention area, would be filled in and graded, the woods and high cliffs destroyed, and the entire floodplain area obliterated by a permanent road. Aerial photo on Oct. 3, 2015, by Jim Olive

This beautiful meander, a natural storm water detention area, would be filled in and graded, the woods and high cliffs destroyed, and the entire floodplain area obliterated by a permanent road. Aerial photo on Oct. 3, 2015, by Jim Olive

Read the rest of this post.

Once-a-Boat-Launch at Woodway to Re-Open by Mid-December

Meanwhile Buffalo Bayou Busy Replanting, Beautifying

Sept. 5, 2015

A contractor has been found at last to take down the heavy-duty chain-link construction fencing, put up some railing, spread some gravel and sod, and restore the informational sign in that western part of Memorial Park that was once a popular boat launch and is now referred to by public officials as a drainage outfall.

Native, edible amaranth in the foreground growing on the bank of the Woodway drainage outfall. Smartweeds, snoutbean, and other plants, mostly native but also some invasive, in the background. Photo Aug. 28, 2015

Native, edible amaranth in the foreground planted by Buffalo Bayou on the bank of the Woodway drainage outfall. Smartweeds, snoutbean, and other plants, mostly native but also some invasive, in the background. Native plants like amaranth and smartweed stabilize the soil and help prepare for new forest growth. Non-native Bermuda and St. Augustine grasses planted by contractors. Photo Aug. 28, 2015

Closed to the public for more than two years, including more than a year after the $1.36 million taxpayer-funded solar-irrigated “erosion control” project was completed, the ugly, massively enlarged outfall draining Post Oak Road is still officially a Texas Parks and Wildlife Paddling Trail boat launch. Previously it was also a forested area with a nature trail.

But officials with the Uptown Tax Increment Reinvestment Zone (TIRZ) 16 now seem genuinely eager to do “what we can to get it open to the public,” said John Breeding, administrator, at the Uptown board meeting in a Galleria high-rise last Wednesday, Aug. 26.

The board voted without discussion to award a contract for $219,272.10 to Jerdon Enterprise, LP, which was the sole bidder for the long-delayed project. With “add-ons” the cost could go to $335,615.10. That seems like a lot of public money for taking down some chain-link fencing, putting up some standard railing, laying down some loose gravel, etc. But apparently no one else wanted to do it.

Work on the Outfall Phase II is now scheduled to begin this month and be completed by December 15, 2015.

And if you’re confused about why a TIRZ and not the parks department or the city council would be making these decisions, well, it is confusing. But the TIRZ has control of the money.

Read the rest of this post.

The Piles of Concrete Came Down

Country Club Armors High Banks with Chunks of Rubble

August 12, 2015

For months we watched with suspense the towering piles of concrete riprap. They hung heavily over the edge of a high bank on the south side of Buffalo Bayou near the downstream end of one of the loveliest natural stretches of the bayou in the city. It’s a long stretch of the bayou that the Harris County Flood Control District wants to bulldoze and “restore” to a “more natural state,” so we were apprehensive.

A row of small telltale colored flags had first appeared near the waterline here and upstream at the upper limit of the area targeted for flood control’s highly destructive Memorial Park Demonstration Project.

The south bank of the nearly 1.5 mile project area is owned by the River Oaks Country Club, which is a one-third partner in the $6 million public project initiated and promoted by the Bayou Preservation Association. The club, which has nearly completed a renovation of its golf course on the bayou, had long threatened to armor its banks with riprap if the “stabilization” project didn’t go through.

And now the club has carried through on its threat, laying down black plastic sheeting on the steep banks at those two locations downstream and upstream, distributing chunks of concrete on the slopes, and covering the blocks with dirt. Club member Steve Lindley, who is overseeing the riprap work as well as the golf course upgrade for the club, said that the plastic sheeting is porous and biodegradable and that club plans to seed the dirt with grass to keep it from washing away and eventually to plant it with native vegetation such as chili pequin.

Read the rest of this post.

Concrete riprap and straw boom on the south bank of Buffalo Bayou at water's edge. Photo taken Aug. 9, 2015.

Concrete riprap, dirt, plastic, and straw boom on the south bank of Buffalo Bayou at water’s edge. Photo taken Aug. 9, 2015.

But It’s Best to Leave the Bayou Alone, Says BPA’s Water Quality Director

Feb. 5, 2015

We lost track of the number of times our jaws dropped listening to Steve Hupp present the Bayou Preservation Association’s argument for destroying one of the last natural stretches of Buffalo Bayou in Houston.

Hupp, who was speaking to the Briar Forest Super Neighborhood council on Jan. 20, is the water quality director for the BPA, which was founded in the 1960s to protect the natural banks of Buffalo Bayou from the bulldozers of the Harris County Flood Control District. Hupp lamented that a representative of Flood Control wasn’t there to help him make his case for bulldozing and dredging some 80 percent of a healthy stretch of our wild, southern bayou for more than a mile in and around our public Memorial Park, including the great cliffs of the Hogg Bird Sanctuary. This $6 million boondoggle, touted as “bank restoration and stabilization,” is called the Memorial Park Demonstration Project (MPDP). Demonstrating exactly the wrong thing to do for erosion control by razing the riparian buffer, the project will destroy the bayou’s ecosystem. According to the BPA, the bayou will be re-engineered to “a more natural state.”

Briar Forest, which is south of Buffalo Bayou between Gessner, Westheimer, and Dairy Ashford, has been fighting its own battle with Flood Control over a plan to destroy a significant amount of forest to create stormwater detention basins.

City Council Member Oliver Pennington was at the meeting. Pennington, who is running for mayor, represents District G, which includes Briar Forest way out there and much closer into town, the south bank of Buffalo Bayou in the “bank restoration” project area. The south bank, which is half of the project, is owned entirely by the River Oaks Country Club, founded in 1924, of which Pennington is a member and which is donating $2 million or one-third of the projected cost of the “stabilization” project. The club is in the process of digging up and rebuilding its golf course, which over the decades has encroached on what was once thick riparian forest, moving closer and closer to the edges of the high banks of the bayou.

Read the rest of this story.

An aerial photo taken in 1953 of Buffalo Bayou and surrounding riparian forest in the project area.

An aerial photo taken in 1953 of Buffalo Bayou and surrounding riparian forest in the project area.