Update on the Beaver

We Tried to Find Out

Feb. 13, 2016

Many people were concerned about the mysterious death of the beaver on the south bank of Buffalo Bayou opposite the Arboretum.

The beaver’s corpse was discovered Saturday, Jan. 30, by a group of Boy Scouts documenting wildlife on the bayou as it passes by Memorial Park, an area threatened by a project proposed by the Harris County Flood Control District and promoted by the Bayou Preservation Association. The project, known as the Memorial Park Demonstration Project, would destroy much of the wildlife habitat along some 1.25 miles of the bayou as it passes by the park and the Hogg Bird Sanctuary. The Army Corps of Engineers is currently considering whether to issue a permit for this project, which would otherwise be prohibited under the federal Clean Water Act.

Yes, there are beavers on Buffalo Bayou, and yes, animals do die. We mourn the loss of any creature. But the circumstances of the death of this beaver, which looked otherwise young and healthy, was puzzling, and there was good reason to try to identify the cause. So several days later, we tried.

An anonymous friend generously offered to pay for a necropsy of the beaver. We contacted a veterinarian who was ready to perform it.  Where to store the body? Someone volunteered her freezer. Another member of our team went out of his way to climb down the banks and locate the beaver’s corpse using GPS coordinates. By chance a veterinarian happened to be in the vicinity, as the area was near an animal clinic on West Loop 610.

Alas, the corpse was too far gone for a necropsy.

One of our naturalist experts said that while beavers do have accidents (chopping down a tree that falls on top of them, for instance) he agreed that the strange place and position of the beaver was suspicious. He suggested that though there were no obvious signs of trauma when discovered,  the beaver might have been shot and tossed. A small caliber bullet hole might not be noticed, he pointed out.

Thus ends the tale of the beaver body on Buffalo Bayou.

Beaver discovered dead by Boy Scouts and guides on Buffalo Bayou, Jan. 30, 2016

Beaver discovered dead by Boy Scouts and guides on Buffalo Bayou, Jan. 30, 2016

 

Buffalo Bayou Doesn’t Like Sidewalks, It Seems

Buffalo Bayou Park Was Supposed to Be More Stable

Nov. 16, 2015

Updated Nov. 17, 2015

Update: “Endless Repairs: Buffalo Bayou Sets Its Own Terms,” Houston Chronicle, Nov. 20, 2019

Well, we can’t help but wonder if constantly scraping and repairing the sidewalks, forever reinforcing the collapsing banks somehow, and repeatedly replacing the trees and landscaping is fully covered by the $2 million annual maintenance budget for Buffalo Bayou Park paid by Houston city taxpayers.

The popular, much praised, and much needed park on the banks of the bayou between Allen Parkway and Memorial Drive is suffering from some serious erosion problems. And that matters to us not just because of the expense and waste. This $53.5 million project, a boon to adjacent property owners and those who live and work nearby, was touted as a successful example of what the Harris County Flood Control District, egged on by the Bayou Preservation Association, wants to do to our healthy, historic wild bayou further upstream in and around Memorial Park. Buffalo Bayou Park was supposed to be more stable! The flood control district calls it Natural Stable Channel Design, but it always looked to us like they were doing everything you’re not supposed to do on the banks of streams: dig up the banks, run heavy equipment over the banks, remove the trees and vegetation (yes, they did a lot of that), build concrete and asphalt sidewalks on the banks, plant grass and mow it.

Let’s Work With Nature, Not Against It

Once you’ve done all that, and the banks and channel start falling apart, it’s pretty difficult to fix it. Best to let the bayou do what it will do anyway. (And eventually the bayou will rebuild and replant it all.) But it seems unlikely that the City and the Buffalo Bayou Partnership are going to sit back and patiently let millions of dollars worth of sidewalks, lamps, and bridges collapse into the bayou. Can they stop it? Time will tell.

In the meantime, it does make one wonder about all those concrete trails they are carving out of the banks and floodplains of the bayous for the Bayou Greenways project. A nice idea, but is that going to work?

Here’s what we’re talking about. What this slide show of photos of Buffalo Bayou Park between Shepherd and Montrose taken on Nov. 15, 2015 (and updated with later photos).

  • Deposition, erosion on north bank and problematic drainage project on south bank at Shepherd Drive. There were trees here once. Photo Nov. 16, 2015, by SC
  • Increased deposition and erosion in same meadow, caused by runoff, exposing irrigation pipes. Photo Feb. 24, 2017, by SC
  • Another view of deposition and erosion in the formerly forested "meadow" on the north bank at Shepherd Bridge. Photo Feb. 24, 2017
  • Slumping in south bank downstream from Shepherd, Nov. 16, 2015.
  • Lone cottonwood still standing on south bank of Buffalo Bayou in November 2015 after parts of it were downed the previous winter.
  • Undermined by removal of surrounding vegetation, big cottonwood falls. Notice that the bayou has steepened its bank previously graded by Flood Control. Photo June 13, 2016.
  • Same fallen tree and bank on August 5, 2017.
  • Same location, former site of tall cottonwood as well as other trees, since removed, on Dec. 18, 2018.
  • Slumping south bank near Dunlavy threatening sidewalk, Nov. 16, 2015.
  • Same location on Feb. 24, 2017, after repeat repairs. Our research show that where the banks are collapsing is where the bayou's original meanders were.
  • The boat launch at The Dunlavy on the south bank, Nov. 16, 2015.
  • Boat launch and bank below The Dunlavy on Jan. 27, 2019
  • Sidewalk threatened on north bank, Nov. 16, 2015.
  • Detail of sidewalk about to collapse on north bank, Nov. 16, 2015.
  • Another section of sidewalk about to collapse on the north bank, Nov. 16, 2015.
  • Jogger on another section of sidewalk threatened by collapsing bank on north side of the park, Nov. 16, 2015.
  • Same location of repeat collapse on north bank opposite the Dunlavy two years later on Feb. 8, 2017.
  • Attempted repairs on same section of north bank on Feb. 8, 2017.
  • Collapsing south bank east of the Dunlavy, Nov. 16, 2015.
  • Collapsing south bank threatening sidewalk east of the Dunlavy, Nov. 16, 2015.
  • Erosion on same south bank below Wortham Fountain on Feb. 8, 2017
  • Vegetation destroyed and bank covered with sediment on north side of park, Nov. 16, 2015.
  • Bank collapse threatening to take out sidewalk on south side of park just west of Rosemont Bridge, Nov. 16, 2015
  • Deposition on south bank of Buffalo Bayou in the park near Montrose, Nov. 16, 2015.
  • Sediment collected on north bank of the park, possibly scraped from sidewalks, Nov. 16, 2015.
  • Sediment deposited by flooding bayou on north bank of park. Photo Feb. 7, 2017
  • Sediment on south bank scraped out of the dog park, Nov. 16, 2015.
  • Deposition and erosion on north bank near Montrose, Nov. 16, 2015.
  • Looking upstream at sunset west of the Rosemont Bridge, Nov. 16, 2015.
  • North bank of Buffalo Bayou in Buffalo Bayou Park moving upstream towards Dunlavy, Nov. 16, 2015.
  • Collapsing bank threatening sidewalk on south bank west of Montrose, Nov. 16, 2015.
  • Runner gazing into same bank collapse on south bank of the bayou, Nov. 16, 2015.
  • The upstream section of the same collapsing bank on the south bank moving upstream towards the Dunlavy, Nov. 16, 2015.
  • Repeat repair of collapsing bank where Buffalo Bayou is seeking out its original meanders. Photo Feb. 8, 2017.
  • Erosion undermining sidewalk on north bank on February 22, 2017
  • Slumped south bank again after Harvey, west (upstream) of the Dunlavy. Photo by SC March 30, 2018
  • The still-closed sidewalk upstream of the Dunlavy with the bank of Buffalo Bayou stabilizing itself naturally with vegetation. Photo Sept. 15, 2019 by SC

Film: Letting the River Heal

Learning to Respect A River’s Natural Process

October 18, 2015

“We have to be patient,” says Steve Nelle, Natural Resources Conservation Service, retired.

“Nature’s going to recover that area at her own timetable in her own way. It’s best to accommodate that natural process.”

Watch this moving and informative 14-minute documentary about a river’s natural process and Best Management Practices for protecting against erosion and preserving a river’s important role in cleansing our water, slowing storm water and runoff, and providing wildlife habitat.

All of this applies to Buffalo Bayou as well as our other bayous, creeks, and streams in Harris County. Even a small riparian buffer of native trees and vegetation a few feet wide is important for our waterways and the cleanliness of the water flowing through our neighborhood streams and into our bays and oceans. But on Buffalo Bayou, especially as it flows past Memorial Park, we are fortunate to have room for the river to move. Letting the river be a river is the most current scientific thinking on river management, even in cities. A dynamic river creates the most beneficial and biologically diverse environment.

Let’s work with nature, not against it.

This lovely, short film was made about the Blanco River and the impact of the 2015 Memorial Day flood on Wimberly, Texas. We can all learn from it.

Watch the film.

Steve Nelle, Natural Resources Conservation Service, retired. Still photo from the documentary, "Letting the River Heal."

Steve Nelle, Natural Resources Conservation Service, retired. Still photo from the documentary, “Letting the River Heal.”

New Aerial Photos of Buffalo Bayou!

Float In The Air Down Buffalo Bayou With Houston Photographer Jim Olive

October 17, 2015

Travel down the remarkable historic stretch of our 18,000-year-old bayou proposed for “restoration” by the Harris County Flood Control District and the City of Houston. The $6 million project, violating virtually every Best Management Practice for riparian areas, would pointlessly destroy and rebuild over 1.25 miles of a naturally-functioning bayou as it flows past Memorial Park and the Hogg Bird Sanctuary on the north and the River Oaks Country Club on the south.

Photos taken on October 2, 2015. Thank you, Jim Olive!

  • This massive new drainage outfall on Buffalo Bayou at Woodway, soon to be once-again a public boat launch, is not in the project area targeted for "restoration" by the proposed $6 million Harris County Flood Control project. But this formerly forested area in Memorial Park, destroyed for a $1.3 million City "erosion control" project, is for many the beginning of a float trip through the threatened historic natural area in the park. Photo by Jim Olive, Oct. 2, 2015
  • The same drainage outfall/boat launch in Memorial Park at Woodway one year later after an "accidental" mowing of riparian plants by a Memorial Park maintenance crew and now, apparently, bulldozing of what remained for some reason. Photo by Jim Olive on Sept. 29, 2016
  • Concrete riprap placed by the River Oaks Country Club in August 2015 on a terrace below the high bank and adjacent to a wetland at the beginning of the proposed $6 million Harris County Flood Control project. The young box elder and other vegetation naturally planted there by the bayou were destroyed by soil-damaging heavy equipment. The mowed golf course extending to the edge of the high bank and the concrete path for motorized golf carts likely contributed to erosion of the high bank. Memorial Park on the left. Photo by Jim Olive, Oct. 2, 2015
  • Another view of the environmentally-damaging riprap recently placed by the River Oaks Country Club on the south bank at the upstream limit of the proposed project area. Sandy beach of Memorial Park on the left. Photo by Jim Olive, Oct. 2, 2015
  • Aerial view of a lovely meander in Memorial Park showing very old high bluffs on the right. The meander would be filled and the high bluffs leveled by the proposed Memorial Park Demonstration Project. Jim Olive photo, Oct. 2, 2015
  • Another view of the meander with its charming sandy beaches and magnificent high cliffs as we move downstream through this remarkable historic nature area in the middle of Houston targeted for destruction. River Oaks Country Club property on the left. Photo by Jim Olive on Oct. 2, 2015
  • The same meander nearly a year later on Sept. 29, 2016. Photo by Jim Olive
  • Brush on the banks taken down by the Memorial Day 2015 Flood is collecting sediment and naturally rebuilding the banks. The project proposed by Flood Control mimics this natural bank stabilizing process but would pointlessly spend millions of public dollars to destroy the superior work of nature and replace it with costly engineering likely to fail. Memorial Park on the left, River Oaks Country Club on the right. Jim Olive photo Oct. 2, 2015.
  • Sandy forested banks of the River Oaks Country Club on the right. Sandy beach on the left owned by the Harris County Flood Control District, though the property behind is privately owned. Photo by Jim Olive Oct. 2, 2015.
  • Kayakers on Buffalo Bayou in the area targeted for destruction on Sept. 29, 2016. Photo by Jim Olive
  • Kayakers on Buffalo Bayou on Sept. 29, 2016. Photo by Jim Olive.
  • Riprap installed by the River Oaks Country Club on the south bank of Buffalo Bayou in August 2015. Photo by Jim Olive on Oct. 2, 2015.
  • Aerial view of a wetland and the riprap placed on a denuded bank, once forested, by the River Oaks Country Club in August 2015. Sandy beach on the left owned by the people of Houston (as part of the Hogg Bird Sanctuary), with the point owned by Harris County Flood Control . Photo by Jim Olive on Oct. 2, 2015
  • Aerial view of the same riprap one year later on Sept. 29, 2016, showing additional riprap installed at the downstream end. Photo by Jim Olive
  • Wider view of the meander showing south bank armored by riprap in 2015 and 2016 and sandy point on north side owned by the Harris County Flood Control District in front of private residences. Photo by Jim Olive on Sept. 29, 2016
  • Aerial view of the tributary and high banks of the Hogg Bird Sanctuary on the north, a public park, and the River Oaks Country Club golf course on the south near the downstream limit of the area targeted for dredging, grading, and filling by the Harris County Flood Control District. The high bank in the sanctuary slumped during the spring high waters, but the brush lying there is collecting sediment and naturally rebuilding the bank. Photo by Jim Olive on Oct. 2, 2015

Update on Puzzling Project to Bulldoze Wild Buffalo Bayou

Damaging, Expensive, Contradictory Plan Still Threatens

Conflicts Still Apparent, Purpose Still Unclear

No Permit Yet

October 8, 2015

The Harris County Flood Control District has responded to largely critical public comments to the Army Corps of Engineers about Flood Control’s misguided project to destroy one of the last natural stretches of Buffalo Bayou in Houston, a most remarkable asset to have in the middle of a city. The Corps is reviewing the Flood Control District’s responses, says Jayson Hudson, who has been the Corps’ Galveston District project manager for the permit application.

Flood Control must apply for a permit from the Corps of Engineers because the Clean Water Act requires the Corps to ensure that projects on federal waters do not damage the health of our waters. Federal waters are defined as navigable streams (Buffalo Bayou) up to the Ordinary High Water Mark, their tributaries and adjacent wetlands, all of which form the great living veins and arteries of our limited water supply. Some studies argue that all riparian areas , the highly biologically diverse natural gardens and forests along stream banks so vital for clean water, should be considered protected wetlands .

This beautiful meander, a natural detention area, would be filled in and graded, the woods and high cliffs destroyed, and the entire floodplain area obliterated by a permanent road. Aerial photo on Oct. 3, 2015, by Jim Olive

This beautiful meander, a natural storm water detention area, would be filled in and graded, the woods and high cliffs destroyed, and the entire floodplain area obliterated by a permanent road. Aerial photo on Oct. 3, 2015, by Jim Olive

Read the rest of this post.

The Piles of Concrete Came Down

Country Club Armors High Banks with Chunks of Rubble

August 12, 2015

For months we watched with suspense the towering piles of concrete riprap. They hung heavily over the edge of a high bank on the south side of Buffalo Bayou near the downstream end of one of the loveliest natural stretches of the bayou in the city. It’s a long stretch of the bayou that the Harris County Flood Control District wants to bulldoze and “restore” to a “more natural state,” so we were apprehensive.

A row of small telltale colored flags had first appeared near the waterline here and upstream at the upper limit of the area targeted for flood control’s highly destructive Memorial Park Demonstration Project.

The south bank of the nearly 1.5 mile project area is owned by the River Oaks Country Club, which is a one-third partner in the $6 million public project initiated and promoted by the Bayou Preservation Association. The club, which has nearly completed a renovation of its golf course on the bayou, had long threatened to armor its banks with riprap if the “stabilization” project didn’t go through.

And now the club has carried through on its threat, laying down black plastic sheeting on the steep banks at those two locations downstream and upstream, distributing chunks of concrete on the slopes, and covering the blocks with dirt. Club member Steve Lindley, who is overseeing the riprap work as well as the golf course upgrade for the club, said that the plastic sheeting is porous and biodegradable and that club plans to seed the dirt with grass to keep it from washing away and eventually to plant it with native vegetation such as chili pequin.

Read the rest of this post.

Concrete riprap and straw boom on the south bank of Buffalo Bayou at water's edge. Photo taken Aug. 9, 2015.

Concrete riprap, dirt, plastic, and straw boom on the south bank of Buffalo Bayou at water’s edge. Photo taken Aug. 9, 2015.

What Flood Control Is Not Telling Us

 

“Maintenance” Road Planned Along Bulldozed Bank

June 4, 2015

Updated June 8, 2015. See below.

Updated June 7, 2015. See  below.

The Harris County Flood Control District is planning to create a 12-foot wide pathway for maintenance vehicles along the graded bank of Buffalo Bayou in Memorial Park.

The maintenance road parallel to the bayou is not included in the plans to “restore” the wild banks of the bayou submitted to the Army Corps of Engineers by the flood control district.

The district revealed the plan for what it is calling a “Monitoring Access Zone” at an invitation-only meeting Tuesday, June 2, 2015. The meeting was one of a series to develop a planting plan for the $6 million “erosion control,” “bank restoration,” “water quality improvement,” “flood conveyance” project known as the Memorial Park Demonstration Project. Apparently the planting plan is not progressing well, as at the meeting the district proposed planting tall fescue, an invasive exotic almost impossible to control. Tall fescue has been the scourge of Texas prairies for several decades at least.

“Tall fescue forms a near-monoculture and is responsible for the loss of otherwise undisturbed prairie remnants throughout Texas and the Midwest,” reports one of our landscape ecologists.

Well, so much for the district’s native plant expertise and commitment to a native-only riparian forest.

This beautiful tributary extending deep into the center of Memorial Park is labelled a "gully" by the flood control district. It will be plugged. Photo by Jim Olive on March 25, 2015.

This beautiful tributary extending deep into the center of Memorial Park is labelled a “gully” by the flood control district. It will be plugged. Photo by Jim Olive on March 25, 2015.

No trees, no “better than ever” riparian forest

Little is known about the previously undisclosed but long-suspected “Monitoring Access Zone.” According to a source who was at the meeting, the 12-foot wide pathway will be planted with some sort of seed mix for several years until the district is certain the “restored” banks will hold. They won’t hold, of course, so this grassy, flat “access zone” is likely to be permanent.

Which means no trees, no “better than ever” riparian forest and wildlife habitat, banks bulldozed and leveled even through the so-called “no-work zones.”

What is Federal Jurisdiction

The district explained at the meeting that it was not required to reveal the “monitoring” road to the Army Corps of Engineers because it does not impact federal waters, presumably because the road will be above the Ordinary High Mark, which is the lateral limit of federal jurisdiction.

But it will not be above the OHWM, which in a significant section of the park extends deep into the forest as part of the flood plain, a natural detention area, including swales and wetlands, all of which are under federal jurisdiction. The road and the “bankfull bench” upon which it will sit will also fill and block at least two tributaries, which also are under federal jurisdiction, although on its plans the district labels both tributaries “gullies,” thereby attempting to remove the tributaries from federal jurisdiction. (See sheets 16 and 18.) Gullies are classified as an “erosional feature” by federal law. An actual gully leading from the South Picnic Loop parking lot is oddly labeled a “tributary.” (See sheet 16.)

So far we don’t know the length of “Monitoring Access Zone,” whether it extends along the entire north bank of the project area, including private property, or whether a “Monitoring Access Zone” will also be built on the south bank of the project, land which belongs to the River Oaks Country Club.

Guess we’ll have to ask the flood control district. And object to the Corps.

What else is the flood control district not telling us?

Snowy egrets flying past another tributary adjacent to the middle meander in Memorial Park, also labeled a gully by HCFCD. The banks here will be bulldozed, and the bayou filled in and a new channel cut further south through River Oaks Country Club property. Photo by Jim Olive.

Snowy egrets flying past another tributary adjacent to the middle meander in Memorial Park, also labeled a gully by HCFCD. The banks here will be bulldozed, and the bayou filled in and a new channel cut further south through River Oaks Country Club property. Photo by Jim Olive.

 

Update June 7, 2015

There is no “road” planned for maintenance vehicles on the wild banks of Buffalo Bayou targeted for “restoration” by the Harris County Flood Control District.

Jason Krahn, manager for the district’s controversial $6 million project to “improve” one of the last natural stretches of Buffalo Bayou, wrote in an email to Save Buffalo Bayou on June 5 that “there is no road proposed for the post construction monitoring activities associated with MPDP [Memorial Park Demonstration Project].”

Participants in the district’s Vegetation Advisory Workgroup for the dredging and channelizing project had been told that for several years after “restoration” there would be a grassy 12-foot wide “Monitoring Access Zone” for maintenance vehicles to access the bulldozed and reconstructed banks of what is now a perfectly healthy historic natural area in need of no monitoring or maintenance whatsoever–other than picking up the trash and mitigating runoff from trails and parking lots.

This “Monitoring Access Zone,” workgroup participants were told, would remain in place until there was no longer any need for monitoring, replanting, watering, removal of noxious invasive vegetation, or repairs to failing “stabilized” banks, etc. Presumably removal of noxious invasive vegetation would not include the tall fescue, a noxious invasive plant, described above, that the district earlier this month was contemplating planting. Responding to objections, the district reportedly has changed its mind about the tall fescue.

Krahn said that monitoring activities would take place on both the north and south banks of the bayou in the project area, which includes Memorial Park and the Hogg Bird Sanctuary on the north and the River Oaks Country Club on the south.

He also wrote that “no work zones” on the bayou were in fact “no work zones,” despite the fact that heavy equipment would be driven over the banks, according to the district’s plans. However, above the Ordinary High Water Mark these “no work zones” would not be graded into bankfull benches, wrote Krahn, because “these are portions of the project area that already have the necessary geomorphic characteristics for a sustainable, stable channel.”  A bankfull bench is a flat or sloping area above the bank of a stream that slows overflowing floodwater.

Asked to clarify the “Monitoring Access Zone,” Krahn has not yet replied.

But it’s not a “road,” Krahn insisted. So we won’t call it a “road.”

How about sendero?

Updated June 8, 2015

Project Manager Jason Krahn has clarified the “monitoring access zone.” In an email to Save Buffalo Bayou Monday morning, Krahn wrote:

“To provide for the monitoring access as outlined in the Atkins report [the post-construction monitoring plan included in the revised permit application], the District is working to define the appropriate spacing for vegetation within a portion of the flood plain planting zone. A spacing of 12-foot in width is currently being considered to allow for this access, or ‘monitoring access zone’ as you’ve referenced it in your previous email correspondence.”

 

 

 

 

 

 

 

 

Immutable Plan. Invisible Rocks.

“Revised” plan to destroy Buffalo Bayou not really “revised” at all.

Project manager says no significant changes to much criticized original plan.

No sandstone in project area, says flood control, contradicting itself.

June 3, 2015

Invisible ancient sandstone in project area at 29°45'35.8"N 95°25'58.6"W 29.759953, -95.432954. Photo by Bill Heins.

Invisible ancient sandstone in project area at 29°45’35.8″N 95°25’58.6″W. Photo by Bill Heins.

Despite the hundreds of comments criticizing the purpose, methods, impact, cost, benefit, and harm of Harris County Flood Control District’s proposed “erosion control” project on Buffalo Bayou in and around Memorial Park, the district has made no significant changes to the plans recently re-submitted to the Army Corps of Engineers.

Jason Krahn, project manager for the controversial Memorial Park Demonstration Project, told Dianna Wray of the Houston Press that the district was “simply following the guidelines” and that there were “no significant changes” to the original project plan.

Indeed, many of the “revised” plan sheets posted by the Army Corps of Engineers on its website appear to have been simply relabeled with new dates, though there are some with new details.

The public has until June 5 to send comments to the Corps about the district’s “revised” permit application and the district’s responses to previous comments. There is no limit on the number of comments one can make. So if you’ve already made a comment, make another!

Read the rest of this story.

The Blinged-Out Master Plan for Memorial Park

 

City Council Quality of Life Committee Should Send Expensive, Overdone Master Plan Back to Drawing Board

March 24, 2015

The Memorial Park Conservancy is sending its $3.2 million unfinished master plan for Memorial Park to the Houston City Council’s Quality of Life Committee on Wednesday, March 25. The plan is so far a gaudy, overstuffed mish-mosh of bad, hazy, contradictory, wrong, and incomplete ideas developed apparently with the main goal of spending some $200-300 million, half of it public money.

The committee should reject this tacky, impractical document and consider directing hundreds of millions of dollars towards the purchase of new parkland instead.

Among other things, the plan misleadingly describes Buffalo Bayou as it flows along Memorial Park as “altered.” A slide shown at the final presentation of the plan to a packed audience at the Museum of Fine Arts Houston March 9 outlined the bayou in bright red and identified it as “altered Buffalo Bayou.” (See slide 18.)

We were stunned. Reasonable people would assume that “altered” meant channelized, dug up, scraped, engineered, rebuilt, etc. by humans or machines. In fact, the bayou flowing past Memorial park is one of the last unaltered stretches remaining in the city.

But no, “altered” in this case means “changed over time,” explains Shellye Arnold, executive director of the park conservancy. The bayou has adjusted to increased water flows from increased runoff due to development and paving; therefore the bayou is “altered,” says Arnold in an email.

The conservancy is developing the ten-twenty-thirty-year plan with the Houston Parks and Recreation Department and the Uptown TIRZ 16, which is funneling our tax money into the blinged-out project. It’s not clear who is in charge of the master plan, or even who is now in charge of Memorial Park, for that matter.

Read the rest of this post.

Central Texas limestone entryway proposed for Houston's Memorial Park. Image from Memorial Park Conservancy.

Central Texas limestone entryway proposed for Houston’s Memorial Park. Image from Memorial Park Conservancy.

 

 

 

 

« Previous PageNext Page »