A Misguided Project and Waste of Public Funds

July 19, 2014

Often the best project is to let the river fix itself. — Mathias Kondolf, “Meander Bends, Landscape Preferences, and River Restoration.” p. 51

Mathias Kondolf is one of the world’s leading river scientists. He recently wrote a letter to the Army Corps of Engineers recommending that the corps deny Harris County a permit to bulldoze the wild banks of Buffalo Bayou in and around Memorial Park.

The $6 million project would remove most of the riparian buffer from nearly 1.5 miles of some of the last remaining stretch of natural bayou in our city, demonstrating to landowners up and down the bayou and elsewhere the exact wrong thing to do. By far the most beautiful and healthiest stretch of the bayou, as it flows past Memorial Park and the Hogg Bird Sanctuary this shady, slow-moving wild bayou belongs to all of us. And amazingly, it is right here in the middle of our big city.

The project, promoted by the Bayou Preservation Association and officially a project of the Harris County Flood Control District, has no scientific or any other justification, says Kondolf. He points out that even the HCFCD says in its permit application that the stream is “recovering” (from something) and questions the county’s odd claim that razing the trees and vegetation, excavating and filling in the banks, and realigning the channel would “decrease the time needed for natural recovery.”

Kondolf points out that the existing riparian habitat is of “high quality,” that the erosion rate of the banks in the target area as estimated by the county is “not really problematic,” and notes that the construction project itself would likely dump three times more sediment into the waterway than this area does in a year.

Read Mathias Kondolf’s letter to the Army Corps of Engineers.

The forested banks of Buffalo Bayou as it flows past Memorial Park, on the left, and the River Oaks Country Club, on the right. All this would be razed by the Bayou Preservation Association's plan to "restore" the bayou.

The forested banks of Buffalo Bayou as it flows past Memorial Park, on the left, and the River Oaks Country Club, on the right. All this would be razed by the Bayou Preservation Association’s plan to “restore” the bayou. Photo taken July 13, 2014.

Another Failed Erosion Control Project on Buffalo Bayou

July 15, 2014

Kayaked down Buffalo Bayou past Memorial Park the other day with geophysicist Richard Hyde, a longtime supporter of Buffalo Bayou, an early member of the Bayou Preservation Association, and an opponent of the BPA’s very bad plan to destroy the natural beauty of Buffalo Bayou in order to … well, no one can quite figure out the purpose of this bizarre and heart-breaking project that would raze over a mile of perfectly fine riparian forest along both banks in and around our great Memorial Park. The proposal, created and promoted by the BPA and officially a project of the Harris County Flood Control District, would also dig up and fill in the bayou, its banks and high bluffs, dam up or bulldoze tributaries, causing enormous loss of land and forest to the River Oaks Country Club, which is paying $2 million for the privilege. It is a mystery why anyone thinks this is a good idea; a mystery how a project with no public benefit and so much public harm ever got funded ($4 million from county and city taxpayers); and a mystery why the BPA, an organization founded to “preserve the natural beauty” of the bayou, would be so hell-bent on eradicating it.

The water was very low — known as base flow, the bayou’s natural flow during fair weather, which is very slow and shallow. Except it wasn’t really base flow because a thunderstorm had just passed over, so even as we were slip-sliding in under the Woodway bridge the water was rising and the current picking up from runoff.

Our first shocking encounter was the new Woodway drainage outfall, recently constructed at a cost of $1,147,934 to Houston taxpayers (i.e. taxes that went to the Galleria area TIRZ 16 rather than into the city treasury). Laughably, this project, no longer under construction but still closed to the public, is described as an “erosion control” project in the TIRZ 16-Uptown 2013-2017 Capital Improvement Plan. “This drainage outflow project is to mitigate erosion in banks of Buffalo Bayou at Woodway,” says the budget description.

Please note the horrific erosion from the dissolving banks of this new massive outfall, the sand and mud clogging the channel, the concrete sidewalk and steps. There were trees here once, and a nature trail. Update 8.4.2014: In 1848, the rock-bottomed ford here was known as “Dutchman’s Crossing.”

Photo taken July 15, 2014, of mud and sand eroding from sides of new drainage outfall at Woodway on Buffalo Bayou.

Photo taken July 15, 2014, of mud and sand eroding from sides of new drainage outfall at Woodway on Buffalo Bayou.

The budget shows no funds allocated for operating and maintenance.

The big, new drainage pipe was also supposed to be set at an angle that allowed the often powerful flow of water to be released in the direction of the flow of the bayou, instead of shooting directly at the opposite bank. But apparently someone forgot to tell that to AECOM, the engineers who designed the project (as well as the tragically unsuccessful “erosion control” project at the Houston Country Club, which razed much of the riparian forest buffer on the banks of Buffalo Bayou along its golf course). AECOM designed the Woodway outfall so that the water blasts directly at the opposite bank, which is already being eaten away by the force.

The big new outfall shoots stormwater directly across the bayou at the opposite bank. Oops. Maybe they want the bayou to erode?

The big new outfall shoots storm water directly at the opposite bank and sediment into the bayou. Oops. Maybe “erosion control” means “increasing erosion”?

Mr. Hyde just shook his head.

This “erosion control” project is in City Council Member Oliver Pennington’s district and Mr. Pennington is running for mayor, as he tells everyone he meets, so be sure to let him know what you think about Mr. Pennington’s “erosion control.” He’s holding a public meeting on Wednesday, July 30, 2014, from 6:00 to 7:30 pm at St. Anne’s Catholic Church, St. Basil’s Hall, 2140 Westheimer (at the corner of Shepherd). The meeting is to discuss “storm drainage improvements” on Shepherd from Westheimer to Buffalo Bayou. The project is scheduled to begin in a few weeks and will last over a year, so it’s very kind of Mr. Pennington to offer a public meeting about it.

Mr. Pennington supports the “erosion control” project that requires razing the wild banks and destroying our natural bayou in and around Memorial Park. So let him know what you think about that too. Might be time to bring out the pitchforks pickets and banners.

To be continued.

 

 

 

 

Deadline Monday, June 30, for Comments Opposing the Bulldozing of Our Beautiful, Wild Buffalo Bayou

June 29, 2014

The deadline is Monday, June 30, for the Army Corps of Engineers to receive your comments opposing a permit for Harris County to destroy nearly 1.5 miles of our wild Buffalo Bayou in and around Memorial Park, including the Hogg Bird Sanctuary. The fight for the life of our proud, southern bayou will continue, and we will prevail with your help.

However, you must let the ACE  as well as all our political representatives know that you oppose this bizarre, wasteful $6 million project. Here’s how to do that. In addition you can sign the MoveOn.org petition that will be sent to the proper authorities on Monday.

The pointless, destructive project that we oppose is being dishonestly promoted as a “restoration project aimed at reducing erosion and sedimentation and improving water quality, while providing for improved aquatic resource functions,” according to the permit application from the Harris County Flood Control District. (See page 13 of the permit application. Warning: big pdf file.)

Their project will do none of those things, and the plain proof is in their own permit application.

Our Buffalo Bayou Is Not in Need of Restoration

1. The first thing to know is that the bayou here is not in need of restoration. Buffalo Bayou as it flows between Memorial Park and the Hogg Bird Sanctuary on the north and the River Oaks Country Club on the south is some of our last natural bayou and riparian wilderness remaining to the people of Houston.

This, our most beautiful reach of the bayou, long preserved as part of our public park, is in better condition than any altered stretch of the bayou, and to know why it’s important to understand what a riparian forest buffer is. A riparian forest already does everything that they claim to be the purpose of this boondoggle: it controls erosion and sedimentation, improves water quality, filters pollution, slows storm waters, etc. Every single academic and professional paper you can find emphasizes the importance of protecting riparian buffer. No true river scientist advocates bulldozing riparian buffer.

  • The condition of most of the riparian buffer on the banks of our Memorial Park is rated as near-perfect, a score of 4.5 out of 5, according to the county’s own permit application. See page 450 in the permit application.
  • A magnificent, very old high bluff in the Hogg Bird Sanctuary, and the lovely tributary it overlooks, have perfect riparian buffer. (Pages 533 and 557).
  • Even much of the south bank owned by the country club has near perfect riparian buffer.
  • Overall the riparian forest in the entire project area has a near-perfect average score of 4.5, and there will be no significant improvement from this costly project. “The overall Riparian Buffer Variable is anticipated to stay at high sub-optimal (Score 4.5) level.” (Page 452.)
  • The average score of our natural riparian forest in this area is significantly reduced by the eroding lawns of a few large, private homes on the north bank and the inclusion of edges of the manicured golf course on the south bank.

The riparian forest of our public park is functioning as it should. Why should we sacrifice our beautiful, naturally functioning bayou because private homeowners stripped the riparian buffer on their property to create lawns? Why should we taxpayers pay millions to restore private property while destroying our own public property?

When They Say Restoration, They Mean Destruction

2. What do they mean by “restoration?”

Since our bayou forest is fine, in order to “restore” it, they first have to destroy it.

They will do this by bringing heavy equipment into our park and cutting access roads to the bayou through the forest. (See Map 1.) They will use the bulldozers and backhoes to strip the trees and vegetation from eighty percent of the project area (not thirty percent as claimed by the Bayou Preservation Association), regardless of its condition and including in the scenic Hogg tributary. (See Map 2.) They will scrape up the riparian sand and soil in the banks, the ancient sandstone and red clay (our geologic history) and archeological remains, and cart it away somewhere. They will dig out and cut new channels in the bayou, lay down logs and other stuff, fill in parts of the bayou, which includes more than two dozen wetlands, deface and cover up the thousands-year-old high bluffs, bring the soil and sand back, grade the banks and create new slopes, cover the new banks with fiber mats and Bermuda grass, and plant some lilies and trees.

Map 1: The dotted red lines show the 14.35 acres of riparian forest to be scraped and bulldozed. According to the HCFCD, 80 percent of the vegetation in the targeted area will be removed. Note the areas to be cleared of trees extends into the interior of Memorial Park towards the maintenance facility. This is for access by heavy equipment to the bayou. Also note the land and forest to be lost by the River Oaks Country Club on the south, and the destruction of a scenic tributary and a magnificent high bluff in the Hogg Bird Sanctuary on the north.

Map 1: The dotted red lines show the 14.35 acres of riparian forest to be scraped and bulldozed. According to the HCFCD, 80 percent of the vegetation in the targeted area will be removed. Note the areas to be cleared of trees extends into the interior of Memorial Park towards the maintenance facility. This is for access by heavy equipment to the bayou. Also note the land and forest to be lost by the River Oaks Country Club on the south, and the destruction of a scenic tributary and a magnificent high bluff in the Hogg Bird Sanctuary on the north.

Why Do They Need to Bulldoze the Forest In Order to Restore It?

3. Why don’t they just plant trees and shrubs, etc. on the few bank areas where the riparian buffer is poor? Much cheaper and less complicated. The Bayou Preservation Association, which bizarrely supports this destructive project, in a four-page position paper dated June 23, 2014, says that “the pattern of storm water releases … from the Addicks and Barker Reservoirs makes the re-vegetation approach untenable.”

But doesn’t this also apply to their purported plans to re-vegetate the 80 percent of the project length that they plan to strip and recreate? Or do they plan to leave their newly “restored” banks essentially bare and shadeless?

Erosion and Sedimentation Will Not Be Reduced, and Water Quality Will Not Be Improved.

4. The HCFCD permit application claims that this small natural riparian area contributes “approximately 359 tons per year of soil erosion.” (Page 447.) That sounds like a lot, but our analysts have put that into perspective. If you spread out that entire year’s worth of soil erosion on a football field between the twenty and forty yard lines, the sediment would be only nine inches high.

The vast majority of the sediment comes from further upstream. (See page 446.) Buffalo Bayou is twenty-six miles long from the Addicks and Barker dams in Katy to the Sabine Street bridge downtown. This short but significant project area in and around our Memorial Park is our best natural, functioning bayou. It contributes only an infinitesimal amount of sediment to the waterway. There is no evidence anywhere in the application permit, no scientific studies, no explanation of how or why excavating and filling in and rechanneling the bayou reduces erosion better than the natural system already in place.

Furthermore, removal of sediment from the water has no impact on the amount of bacteria in the water. This is according to the expert analysis of Dr. George Guillen, executive director of the Environmental Institute of Houston and an associate professor of biology and environmental science at UH-Clear Lake.

But don’t listen to us. Read the HCFCD’s application permit. Page 452: Water quality will not be improved.

Map 2: Areas of the natural banks of Buffalo Bayou to be excavated and filled. Yellow is excavate. Orange is fill.

Map 2: Areas of the natural banks of Buffalo Bayou to be excavated and filled. Yellow is excavate. Orange is fill.

This Project to Destroy Our Beautiful Buffalo is Nothing Other than the Same Old Flood Control Project to Make Buffalo Bayou a Bigger Drainage Ditch.

“The project purpose is … improvements to the dimension, pattern, and profile allowing the stream to convey storm water and sediment loads more efficiently.” Page 2 of the permit application.

This stealth flood control project is a joint venture between Harris County, the City of Houston, and the River Oaks Country Club. Each entity is contributing $2 million to the $6 million cost of the “demonstration” project, and the Houston city council voted last June to approve and fund it. This zombie channelization plan, a “holistic” variant of proposals long opposed by the Bayou Preservation Association, was largely conceived by the board of the BPA, who must be in need of work, do-nothing preservation being too passive and non-remunerative to somebody, and is actively promoted by the BPA and the Memorial Park Conservancy despite the huge of loss of trees and wildlife habitat, and damage to the bayou and our great public park.