Fighting For Our Public Forests on Buffalo Bayou
On the Radio
Forests Work for Us
Oct. 28, 2015
Listen to Susan Chadwick of Save Buffalo Bayou and Landrum Wise of Save Our Forest talk about community campaigns to protect public forest along some twelve miles of Buffalo Bayou in Houston.
They spoke with Pat Greer and H.C. Clark on Eco-Ology on KPFT 90.1 Tuesday, Oct. 27, 2015, about efforts to keep the City of Houston and the Harris County Flood Control District from destroying woodlands on Buffalo Bayou in Memorial Park in the center of Houston and in Terry Hershey Park in far west Houston.
In addition to their great social value and benefit to our health, well-being, and quality of life, the trees and vegetation that grow naturally along the bayou perform vital ecological services and are a key part of the bayou’s living system. Known as riparian zones or buffers, these specially adapted trees and plants cleanse and filter pollutants from the water. They protect the banks from erosion, absorb and slow storm water runoff and provide natural flood detention. They shade us and cool the stream, and provide wildlife habitat.
Legally Required to Conserve Harris County Forests
The Harris County Flood Control District, according to its 1937 charter, is charged by state law with conserving forests in the county. (See page six.) But for decades the district has been razing forests to build storm water detention basins on our bayous, creeks, tributaries, and elsewhere, and to re-engineer channels and banks. Detention basins are used to hold or slow temporarily surface runoff or high flows in a stream during storms.
The flood control district’s project on Buffalo Bayou in Memorial Park, known as the Memorial Park Demonstration Project, would raze some 80 percent of the trees and vegetation along more than 1.25 miles of the bayou and its tributaries in Memorial Park and the Hogg Bird Sanctuary. The Army Corps of Engineers, which enforces the federal Clean Water Act, is currently considering whether to issue a permit for the controversial $6 million project, which is described by flood control as an “erosion control” and “bank stabilization” project. The project violates Best Management Practices for riparian areas. Virtually every federal and state resource agency has policies and regulations protecting riparian zones, which perform essentially the same function as federally-protected wetlands.
Recent Success for Save Our Forest
The City of Houston recently withdrew a project to cut down the majority of trees and understory on some 42 acres of public forest and excavate up to six large detention basins on the south bank of Buffalo Bayou in Terry Hershey Park between Beltway 8 and Wilcrest Drive. The Capital Improvement Project was to have cost the taxpayers between $3.5 and $8.5 million.
However, the flood control district appears to be continuing with its widely-opposed “Charting Buffalo” study that proposes as many as 24 storm water detention basins along some 10.7 miles of both banks of Buffalo Bayou in the forests of Terry Hershey Park between Beltway 8 and Highway 6 at Barker and Addicks dams. On Nov. 12, 2013, despite public opposition, Harris County Commissioners Court approved flood control’s request for $250,000 for a vegetation and topography survey in the park.
The headwaters of Buffalo Bayou are on the Katy Prairie west of Houston, and the 18,000-year-old “mother bayou,” fed by numerous tributaries, flows for some 53 miles east through the city and the ship channel into Galveston Bay. Buffalo Bayou, unlike major bayous like White Oak and Brays, which join Buffalo Bayou just west and east of downtown, has never been covered with concrete, though parts of it have been channelized.
Listen to the radio broadcast.
Recent Comments