Revising the Plan for Protecting Galveston Bay
Public Workshop Wednesday, March 1, 2017
Or Send Comments
Feb. 20, 2017
The Galveston Bay Estuary Program was established in 1989 to implement a comprehensive conservation plan for Galveston Bay. Established by the federal government and administered by the Texas Commission on Environmental Quality (TCEQ), the program’s goal is to “preserve Galveston Bay for generations to come.” It is one of two estuary programs in Texas and one of 28 programs nationwide protecting estuaries “of national significance.”
An estuary is “a partially enclosed, coastal water body where freshwater from rivers and streams mixes with salt water from the ocean. Estuaries, and their surrounding lands, are places of transition from land to sea. … Estuarine environments are among the most productive on earth.”
As the Environmental Protection Agency points out, “what happens on the land affects the quality of the water and health of the organisms that live in an estuary. … For example, if a river or stream … passes urbanized and suburbanized areas, it gathers substances such as:
- fertilizers or pet waste that wash off lawns;
- untreated sewage from failing septic tanks;
- wastewater discharges from industrial facilities;
- sediment from construction sites; and
- runoff from impervious surfaces like parking lots.”
Buffalo Bayou is the main river flowing through the center of Houston and emptying into Galveston Bay. Numerous other creeks and tributaries, including Brays, White Oak, and Sims bayous, flow into Buffalo Bayou, which becomes the Houston Ship Channel.
Updating the Galveston Bay Protection Plan
The 22-year-old Galveston Bay management plan is being revised. The Houston Sierra Club is urging the general public to attend a Wednesday afternoon workshop in La Marque to “provide input on how we can have a cleaner and more ecologically intact Galveston Bay.”
Film: Letting the River Heal
Learning to Respect A River’s Natural Process
October 18, 2015
“We have to be patient,” says Steve Nelle, Natural Resources Conservation Service, retired.
“Nature’s going to recover that area at her own timetable in her own way. It’s best to accommodate that natural process.”
Watch this moving and informative 14-minute documentary about a river’s natural process and Best Management Practices for protecting against erosion and preserving a river’s important role in cleansing our water, slowing storm water and runoff, and providing wildlife habitat.
All of this applies to Buffalo Bayou as well as our other bayous, creeks, and streams in Harris County. Even a small riparian buffer of native trees and vegetation a few feet wide is important for our waterways and the cleanliness of the water flowing through our neighborhood streams and into our bays and oceans. But on Buffalo Bayou, especially as it flows past Memorial Park, we are fortunate to have room for the river to move. Letting the river be a river is the most current scientific thinking on river management, even in cities. A dynamic river creates the most beneficial and biologically diverse environment.
Let’s work with nature, not against it.
This lovely, short film was made about the Blanco River and the impact of the 2015 Memorial Day flood on Wimberly, Texas. We can all learn from it.
New Aerial Photos of Buffalo Bayou!
Float In The Air Down Buffalo Bayou With Houston Photographer Jim Olive
October 17, 2015
Travel down the remarkable historic stretch of our 18,000-year-old bayou proposed for “restoration” by the Harris County Flood Control District and the City of Houston. The $6 million project, violating virtually every Best Management Practice for riparian areas, would pointlessly destroy and rebuild over 1.25 miles of a naturally-functioning bayou as it flows past Memorial Park and the Hogg Bird Sanctuary on the north and the River Oaks Country Club on the south.
Photos taken on October 2, 2015. Thank you, Jim Olive!
Recent Comments