Cool Off With Geology Classes On The Bayou
A Good Time for Floating with Tom Helm
August 13, 2016
You may think it’s way too hot to go outside. But it’s actually much cooler down on the bayou, thanks to the water and the shade from overhanging trees.
Also it’s free of mosquitoes since the damselflies eat them up. Nature works that way. Bats eat mosquitoes too. Mosquitoes don’t breed in flowing water anyway.
So now is the perfect time (unless it’s raining) to cool off and learn about the amazing geology of one of the last natural stretches of our 18,000-year-old Buffalo Bayou as it flows past Memorial Park.
Float for a couple of hours through this historic nature area with geologist, naturalist, and river guide Tom Helm. Tom will explain the ancient sandstone formations and high Pleistocene bluffs, the patterns in the sand, why the river changes course and how sediment taken away from one side gets deposited on the other. And much more. See mole cricket tracks and watch diving hawks! Witness the grace of a great blue heron flying in front of your canoe!
Right here in the middle of Houston.
Tom takes care of everything. Look under Classes at the top page of this website. Or contact Tom directly. Scheduling is flexible so arrange a time that suits you and your family and friends.
Get outside, have a good time, and learn something new! The water is low now so the sandstone formations and sandy banks are visible.
But if it’s raining or the flow is too high, classes will be postponed.
Immutable Plan. Invisible Rocks.
“Revised” plan to destroy Buffalo Bayou not really “revised” at all.
Project manager says no significant changes to much criticized original plan.
No sandstone in project area, says flood control, contradicting itself.
June 3, 2015
Despite the hundreds of comments criticizing the purpose, methods, impact, cost, benefit, and harm of Harris County Flood Control District’s proposed “erosion control” project on Buffalo Bayou in and around Memorial Park, the district has made no significant changes to the plans recently re-submitted to the Army Corps of Engineers.
Jason Krahn, project manager for the controversial Memorial Park Demonstration Project, told Dianna Wray of the Houston Press that the district was “simply following the guidelines” and that there were “no significant changes” to the original project plan.
Indeed, many of the “revised” plan sheets posted by the Army Corps of Engineers on its website appear to have been simply relabeled with new dates, though there are some with new details.
The public has until June 5 to send comments to the Corps about the district’s “revised” permit application and the district’s responses to previous comments. There is no limit on the number of comments one can make. So if you’ve already made a comment, make another!
Recent Comments