{"id":9092,"date":"2020-09-30T21:35:40","date_gmt":"2020-10-01T02:35:40","guid":{"rendered":"http:\/\/www.savebuffalobayou.org\/?p=9092"},"modified":"2020-10-02T13:50:47","modified_gmt":"2020-10-02T18:50:47","slug":"flood-control-scrapes-bulldozes-healthy-banks-of-buffalo-bayou","status":"publish","type":"post","link":"https:\/\/www.savebuffalobayou.org\/?p=9092","title":{"rendered":"Flood Control Scrapes, Bulldozes Healthy Banks of Buffalo Bayou"},"content":{"rendered":"\n<p><\/p>\n\n\n\n<p><strong><em>Heart-Breaking<\/em><\/strong> <strong><em>Violation of County, City Mandates. Appropriate Use of Federal Funds?<\/em><\/strong><\/p>\n\n\n\n<p><\/p>\n\n\n\n<p>Sept. 30, 2020<\/p>\n\n\n\n<p>We were hoping they wouldn\u2019t do it. That Harris County Flood Control would see it wasn\u2019t necessary. The bayou banks were healthy and stable, lush and green.<\/p>\n\n\n\n<p>But the private consulting engineers had planned it. So Flood Control did it: scraped away the young trees and deep-rooted native plants holding the bank together, bulldozed what nature had successfully engineered, built, and planted in Buffalo Bayou Park.<\/p>\n\n\n\n<p>They left bare dirt, disturbed, compacted, dead. Violated every established principle of good management of a riverbank, as noted by one of the federal agencies funding the project. (<a href=\"https:\/\/www.nrcs.usda.gov\/Internet\/FSE_DOCUMENTS\/16\/nrcs143_019308.pdf\" target=\"_blank\" rel=\"noreferrer noopener\">p. 14<\/a>)<\/p>\n\n\n\n<p>And the bare dirt washed away in the rains that followed.<\/p>\n\n\n\n<p>Without the anchor of the surrounding network of deep-rooted plants, the remaining lone trees on the banks likely will soon fall, as <a rel=\"noreferrer noopener\" href=\"https:\/\/www.savebuffalobayou.org\/?p=2745\" target=\"_blank\">happened as a result of Flood Control&#8217;s previous work. <\/a><\/p>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"1000\" height=\"750\" src=\"https:\/\/www.savebuffalobayou.org\/wp-content\/uploads\/2020\/09\/15-s-bk-ds-dunlavy-1.jpg\" alt=\"\" class=\"wp-image-9051\" srcset=\"https:\/\/www.savebuffalobayou.org\/wp-content\/uploads\/2020\/09\/15-s-bk-ds-dunlavy-1.jpg 1000w, https:\/\/www.savebuffalobayou.org\/wp-content\/uploads\/2020\/09\/15-s-bk-ds-dunlavy-1-300x225.jpg 300w, https:\/\/www.savebuffalobayou.org\/wp-content\/uploads\/2020\/09\/15-s-bk-ds-dunlavy-1-768x576.jpg 768w\" sizes=\"auto, (max-width: 1000px) 100vw, 1000px\" \/><figcaption>The south bank of Buffalo Bayou in Buffalo Bayou Park just downstream from the Dunlavy after razing and grading by Harris County Flood Control. Photo taken looking upstream from the Jackson Hill Bridge on Sept. 17, 2020, before Tropical Storm Beta.<\/figcaption><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<p>They did it with public funds, spending over $2,000 per linear foot, claiming the purpose was to \u201ccontain erosion and bank failures caused by Hurricane Harvey.\u201d<\/p>\n\n\n\n<p>These particular banks weren\u2019t failing. We know because we climbed out of our canoes and up that gently sloping bank through the tall goldenrod and horseweed below the Dunlavy a couple of times in recent months. Flood Control\u2019s federal grant was supposed to be used to <a rel=\"noreferrer noopener\" href=\"https:\/\/www.nrcs.usda.gov\/wps\/portal\/nrcs\/detail\/national\/programs\/landscape\/ewpp\/?cid=nrcseprd1381472\" target=\"_blank\">\u201creshape and protect eroded streambanks.\u201d<\/a> But none of these areas was eroded. The bank shape was fine. Maybe steeper after bulldozing, with less of a beach, but pretty much the same. Though bare and unprotected.<\/p>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"1000\" height=\"750\" src=\"https:\/\/www.savebuffalobayou.org\/wp-content\/uploads\/2020\/09\/Waugh-shelf-s-us.jpg\" alt=\"\" class=\"wp-image-9054\" srcset=\"https:\/\/www.savebuffalobayou.org\/wp-content\/uploads\/2020\/09\/Waugh-shelf-s-us.jpg 1000w, https:\/\/www.savebuffalobayou.org\/wp-content\/uploads\/2020\/09\/Waugh-shelf-s-us-300x225.jpg 300w, https:\/\/www.savebuffalobayou.org\/wp-content\/uploads\/2020\/09\/Waugh-shelf-s-us-768x576.jpg 768w\" sizes=\"auto, (max-width: 1000px) 100vw, 1000px\" \/><figcaption>The same location on Sept. 9, 2020. Note the north bank in the distance which had just recently been bulldozed.<\/figcaption><\/figure>\n\n\n\n<p><strong>Designed to Fail?<\/strong> <strong>Do It Anyway<\/strong><\/p>\n\n\n\n<p>Not even the private contractors paid to scrape it all away thought it was a good idea. In response to the observation that the denuded bank would fail as a result, one worker commented, \u201cThat\u2019s what we told them.\u201d He added, \u201cBut that\u2019s the way Flood Control wanted it.\u201d We responded that Flood Control had just destroyed a healthy bayou bank. The guys nodded.<\/p>\n\n\n\n<p><em><a href=\"https:\/\/www.savebuffalobayou.org\/?page_id=9038\">Read the rest of this post.<\/a><\/em><\/p>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"1000\" height=\"750\" src=\"https:\/\/www.savebuffalobayou.org\/wp-content\/uploads\/2020\/09\/11-ds-dunlavy-fr-jackson.jpg\" alt=\"\" class=\"wp-image-9058\" srcset=\"https:\/\/www.savebuffalobayou.org\/wp-content\/uploads\/2020\/09\/11-ds-dunlavy-fr-jackson.jpg 1000w, https:\/\/www.savebuffalobayou.org\/wp-content\/uploads\/2020\/09\/11-ds-dunlavy-fr-jackson-300x225.jpg 300w, https:\/\/www.savebuffalobayou.org\/wp-content\/uploads\/2020\/09\/11-ds-dunlavy-fr-jackson-768x576.jpg 768w\" sizes=\"auto, (max-width: 1000px) 100vw, 1000px\" \/><figcaption>The same bank on Sept. 29, 2020, after Storm Beta. Water was still high from releases from the federal dams far upstream.<\/figcaption><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>Heart-Breaking Violation of County, City Mandates. Appropriate Use of Federal Funds? Sept. 30, 2020 We were hoping they wouldn\u2019t do it. That Harris County Flood Control would see it wasn\u2019t necessary. The bayou banks were healthy and stable, lush and green. But the private consulting engineers had planned it. So&#8230;<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-9092","post","type-post","status-publish","format-standard","hentry","category-uncategorized"],"_links":{"self":[{"href":"https:\/\/www.savebuffalobayou.org\/index.php?rest_route=\/wp\/v2\/posts\/9092","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.savebuffalobayou.org\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.savebuffalobayou.org\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.savebuffalobayou.org\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.savebuffalobayou.org\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=9092"}],"version-history":[{"count":8,"href":"https:\/\/www.savebuffalobayou.org\/index.php?rest_route=\/wp\/v2\/posts\/9092\/revisions"}],"predecessor-version":[{"id":9129,"href":"https:\/\/www.savebuffalobayou.org\/index.php?rest_route=\/wp\/v2\/posts\/9092\/revisions\/9129"}],"wp:attachment":[{"href":"https:\/\/www.savebuffalobayou.org\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=9092"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.savebuffalobayou.org\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=9092"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.savebuffalobayou.org\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=9092"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}