{"id":7270,"date":"2019-05-22T20:21:36","date_gmt":"2019-05-23T01:21:36","guid":{"rendered":"http:\/\/www.savebuffalobayou.org\/?p=7270"},"modified":"2021-04-06T18:39:38","modified_gmt":"2021-04-06T23:39:38","slug":"private-club-destroying-bank-of-buffalo-bayou-threatening-self-and-neighbors","status":"publish","type":"post","link":"https:\/\/www.savebuffalobayou.org\/?p=7270","title":{"rendered":"Private Club Destroying Bank of Buffalo Bayou, Threatening Self and Neighbors, with City Permission"},"content":{"rendered":"<div id=\"content-box\">\n<div id=\"post-body\">\n<div class=\"post-single post-7182 page type-page status-publish hentry\">\n<div id=\"article\">\n<h3>Money to Burn: Leaders Reject Cheaper, Less Damaging Alternatives<\/h3>\n<h4><em>A Cascade of Increasingly Costly Mistakes<\/em><\/h4>\n<p>\u00a0<\/p>\n<p>May 22, 2019<\/p>\n<p><strong>Updated with photos from July 12, 2020<\/strong><\/p>\n<p>An elite private club on Buffalo Bayou has begun an $18-24 million \u201cbank stabilization\u201d project that will likely cause extensive damage to public and private property, including the club\u2019s own property.<\/p>\n<p>The River Oaks Country Club received a permit from the City of Houston Floodplain Management Office on May 6, 2019, to install over 1,500 linear feet of metal walls, concrete pilings, concrete rubble, wire baskets filled with rock (gabions), and other material in three locations on Buffalo Bayou below the edge of their golf course. The locations are opposite Memorial Park and the Hogg Bird Sanctuary, as well as private residential property.<\/p>\n<p>This type of bank hardening has been specifically rejected by the Harris County Flood Control District and the Galveston District of the US Army Corps of Engineers, which governs the coast and southeast Texas down to the Rio Grande. Both agencies nevertheless appear to have given their approval, despite knowing that such unnecessarily costly projects often fail, damage nearby property, and even increase flooding.<\/p>\n<p>\u00a0<\/p>\n<p><strong>Solutions Creating More Costly Problems<\/strong><\/p>\n<p>\u201cBank armoring at a single point of erosion has been shown to be ineffective along Buffalo Bayou,\u201d noted the Corps in a 2014 publication specifically referring to this stretch of the river. \u201cThe isolated bank armoring installed to deflect the erosive shear stress at the point of failure, in most cases, is attacked at one or both of its terminal ends, resulting in eventual failure. This type of armoring redirects stream energy to a new spot location downstream, creating a new point of stress.\u201d <a href=\"https:\/\/www.savebuffalobayou.org\/wp-content\/uploads\/2019\/05\/PN.201201007.pdf\" target=\"_blank\" rel=\"noopener noreferrer\">(p. 4)<\/a><\/p>\n<p>The Federal Emergency Management Agency <a href=\"https:\/\/www.fema.gov\/pdf\/about\/regions\/regionx\/Engineering_With_Nature_Web.pdf\" target=\"_blank\" rel=\"noopener noreferrer\">(p. 8)<\/a>, the Corps, and the Flood Control District recommend against bank hardening projects due to, among other reasons, the \u201clack of shear stress reduction\u201d and \u201cthe erosive energy transfer it would place on the opposite bank of the bayou at a downstream location.\u201d (<a href=\"https:\/\/www.dropbox.com\/s\/d5f5mdk1wbjaib9\/2012-01007%20EA%20signed%20copy.pdf?dl=0\" target=\"_blank\" rel=\"noopener noreferrer\">p. 21<\/a>)<\/p>\n<\/div>\n<p>\u00a0<\/p>\n<div id=\"attachment_7254\" style=\"width: 1010px\" class=\"wp-caption aligncenter\"><a href=\"https:\/\/www.savebuffalobayou.org\/wp-content\/uploads\/2019\/05\/Sheet-pile-1a.jpg\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-7254\" class=\"size-full wp-image-7254\" src=\"https:\/\/www.savebuffalobayou.org\/wp-content\/uploads\/2019\/05\/Sheet-pile-1a.jpg\" alt=\"\" width=\"1000\" height=\"750\" srcset=\"https:\/\/www.savebuffalobayou.org\/wp-content\/uploads\/2019\/05\/Sheet-pile-1a.jpg 1000w, https:\/\/www.savebuffalobayou.org\/wp-content\/uploads\/2019\/05\/Sheet-pile-1a-300x225.jpg 300w, https:\/\/www.savebuffalobayou.org\/wp-content\/uploads\/2019\/05\/Sheet-pile-1a-768x576.jpg 768w\" sizes=\"auto, (max-width: 1000px) 100vw, 1000px\" \/><\/a><p id=\"caption-attachment-7254\" class=\"wp-caption-text\">Heavy sheet pile walls being pounded into the south bank of Buffalo Bayou by the River Oaks Country Club. Area 3 of three locations receiving similar treatment. The water level was at base flow of around 145 cubic feet per second. The work was clearly being conducted in federally-protected waters below the Ordinary High Water Mark. There are also federally-protected wetlands here. Photo May 22, 2019.<\/p><\/div>\n<\/div>\n<p>\u00a0<\/p>\n<div class=\"post-single post-7182 page type-page status-publish hentry\">\n<p>The Corps and Flood Control specifically rejected bank hardening \u201con the outside of meander bends\u201d for reasons that include, in addition to above, \u201cthe lack of habitat creation\u201d and \u201clack of natural occurrence\u201d on the bayou. All three locations for the \u201cstabilization\u201d project are on the outside of meander bends.<\/p>\n<p>\u00a0<\/p>\n<div id=\"attachment_7227\" style=\"width: 1010px\" class=\"wp-caption aligncenter\"><a href=\"https:\/\/www.savebuffalobayou.org\/wp-content\/uploads\/2019\/05\/Lidar-topo-BB-3.19-s.jpg\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-7227\" class=\"size-full wp-image-7227\" src=\"https:\/\/www.savebuffalobayou.org\/wp-content\/uploads\/2019\/05\/Lidar-topo-BB-3.19-s.jpg\" alt=\"\" width=\"1000\" height=\"639\" srcset=\"https:\/\/www.savebuffalobayou.org\/wp-content\/uploads\/2019\/05\/Lidar-topo-BB-3.19-s.jpg 1000w, https:\/\/www.savebuffalobayou.org\/wp-content\/uploads\/2019\/05\/Lidar-topo-BB-3.19-s-300x192.jpg 300w, https:\/\/www.savebuffalobayou.org\/wp-content\/uploads\/2019\/05\/Lidar-topo-BB-3.19-s-768x491.jpg 768w\" sizes=\"auto, (max-width: 1000px) 100vw, 1000px\" \/><\/a><p id=\"caption-attachment-7227\" class=\"wp-caption-text\">An outdated LIDAR topographic map shows an inaccurate path of the bayou channel flowing past Memorial Park on the north and the Hogg Bird Sanctuary on the northeast. Image from the April 2019 hydraulic analysis submitted to the City and Flood Control District by Binkley and Barfield on behalf of the River Oaks Country Club. Areas 1,2, and 3 are the &#8220;slope repair&#8221; project areas on the south bank of the bayou below the River Oaks Country Club golf course.<\/p><\/div>\n<p>\u00a0<\/p>\n<p><strong>Damage to Others<\/strong><\/p>\n<p>The initial metals walls being pounded into the bank at the downstream end of the club\u2019s golf course are opposite residential properties. A preliminary analysis showed that they will indeed \u201cdisplace\u201d the club\u2019s \u201cerosion consequences onto their neighbors,\u201d and that the \u201cdisplaced consequences will be more expensive than the ones [the club] seeks to avoid.\u201d<\/p>\n<p>The on-site analysis was conducted by a professional geologist working with Save Buffalo Bayou.<\/p>\n<p>The project will similarly cause increased erosion of the forested banks of Memorial Park upstream, a 1500-acre public park currently undergoing $300 million worth of landscaping. Management of the park is under contract to the <a href=\"https:\/\/www.memorialparkconservancy.org\/the-conservancy\/board-of-directors.html\" target=\"_blank\" rel=\"noopener noreferrer\">Memorial Park Conservancy<\/a>. Of the 28 members of the Conservancy board, at least six are members of the River Oaks Country Club, including the chairman and vice chairman, as is a major donor.<\/p>\n<p>Among other problems, the project maps use an outdated LIDAR topographic survey of the area, possibly from 2008, that shows an inaccurate path of the bayou channel.<\/p>\n<p>The project maps also exaggerate the club&#8217;s property line, <a href=\"https:\/\/www.savebuffalobayou.org\/?page_id=5975\" target=\"_blank\" rel=\"noopener noreferrer\">which only extends partially down the bank to the &#8220;gradient boundary.&#8221; The Port of Houston (the public) owns the submerged lands of Buffalo Bayou<\/a>.<\/p>\n<p><strong>Less Damaging Alternatives<\/strong><\/p>\n<p>The club has other less damaging, less costly, and more effective methods of protecting its bank. In mid-April Save Buffalo Bayou contacted the club leadership with recommendations and information but received no response. The club is led by board chairman Randall B. Hale. Board member Steve Lindley has been in charge of the golf course and bank projects.<\/p>\n<p>In mid-April Save Buffalo Bayou also contacted the Memorial Park Conservancy, the Houston Parks Department, City officials, including the Mayor and City Council representatives, among others, about its concerns for the park. There was no response.<\/p>\n<p><a href=\"https:\/\/www.savebuffalobayou.org\/?page_id=7182\"><em>Read the rest of this post.<\/em><\/a><\/p>\n<div id=\"article\">\n<p>\u00a0<\/p>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n\n\n<div class=\"wp-block-image\"><figure class=\"aligncenter size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1000\" height=\"661\" src=\"https:\/\/www.savebuffalobayou.org\/wp-content\/uploads\/2021\/04\/10-crime-c.jpg\" alt=\"\" class=\"wp-image-9795\" srcset=\"https:\/\/www.savebuffalobayou.org\/wp-content\/uploads\/2021\/04\/10-crime-c.jpg 1000w, https:\/\/www.savebuffalobayou.org\/wp-content\/uploads\/2021\/04\/10-crime-c-300x198.jpg 300w, https:\/\/www.savebuffalobayou.org\/wp-content\/uploads\/2021\/04\/10-crime-c-768x508.jpg 768w\" sizes=\"auto, (max-width: 1000px) 100vw, 1000px\" \/><figcaption>Area 3 on July 12, 2020<\/figcaption><\/figure><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Money to Burn: Leaders Reject Cheaper, Less Damaging Alternatives A Cascade of Increasingly Costly Mistakes \u00a0 May 22, 2019 Updated with photos from July 12, 2020 An elite private club on Buffalo Bayou has begun an $18-24 million \u201cbank stabilization\u201d project that will likely cause extensive damage to public and&#8230;<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-7270","post","type-post","status-publish","format-standard","hentry","category-uncategorized"],"_links":{"self":[{"href":"https:\/\/www.savebuffalobayou.org\/index.php?rest_route=\/wp\/v2\/posts\/7270","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.savebuffalobayou.org\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.savebuffalobayou.org\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.savebuffalobayou.org\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.savebuffalobayou.org\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=7270"}],"version-history":[{"count":5,"href":"https:\/\/www.savebuffalobayou.org\/index.php?rest_route=\/wp\/v2\/posts\/7270\/revisions"}],"predecessor-version":[{"id":9796,"href":"https:\/\/www.savebuffalobayou.org\/index.php?rest_route=\/wp\/v2\/posts\/7270\/revisions\/9796"}],"wp:attachment":[{"href":"https:\/\/www.savebuffalobayou.org\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=7270"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.savebuffalobayou.org\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=7270"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.savebuffalobayou.org\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=7270"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}