{"id":2428,"date":"2016-03-07T18:03:59","date_gmt":"2016-03-08T00:03:59","guid":{"rendered":"http:\/\/www.savebuffalobayou.org\/?p=2428"},"modified":"2016-03-14T00:10:03","modified_gmt":"2016-03-14T05:10:03","slug":"public-meeting-on-buffalo-bayou-dams","status":"publish","type":"post","link":"https:\/\/www.savebuffalobayou.org\/?p=2428","title":{"rendered":"Public Meeting on Buffalo Bayou Dams"},"content":{"rendered":"<h4>Corps of Engineers to Issue Repair Update Wednesday, March 9<\/h4>\n<p>March 7, 2016<\/p>\n<p><strong>Updated March 14, 2016<\/strong><\/p>\n<p>The US Army Corps of Engineers, Galveston District, is <a href=\"http:\/\/www.swg.usace.army.mil\/Media\/NewsReleases\/tabid\/2216\/Article\/681661\/us-army-corps-of-engineers-to-provide-addicks-and-barker-construction-update.aspx?mc_cid=d773dbb27f&amp;mc_eid=515f6d880d\" target=\"_blank\">holding a public meeting Wednesday, March 9, 2016,<\/a> to update the public about progress in repairing the Addicks and Barker dams on South Mayde Creek and Buffalo Bayou in rapidly developing west Houston.<\/p>\n<p>The two earthen dams, completed in the 1940s, were labeled \u201cextremely high risk\u201d in 2009 when engineers noticed seepage around the dams\u2019 gates and ends following a heavy storm. <a href=\"http:\/\/www.swg.usace.army.mil\/Missions\/DamSafetyProgram.aspx\" target=\"_blank\">The \u201cextremely high risk\u201d designation did not mean the dams were in danger of failing soon<\/a>. But the possibility of failure combined with the dams\u2019 location upstream of a major metropolitan area lifted the dams into the urgent category.<\/p>\n<p>As a result, the reservoirs, which are dry reservoirs and contain <a href=\"https:\/\/en.wikipedia.org\/wiki\/George_Bush_Park\" target=\"_blank\">one of the region\u2019s largest parks and recreation areas<\/a>, cannot be filled to capacity during storms, which impacts the way water is released from the dams before and after storms: faster and more often. <strong>(Correction: <a title=\"No Changes in Operation of Buffalo Bayou Dams\" href=\"https:\/\/www.savebuffalobayou.org\/?page_id=2436\" target=\"_blank\">The Corps of Engineers says that the structural problems with the dams have had no impact on the capacity limit or release rates.<\/a>)\u00a0<\/strong> This unnatural flow regime in turn impacts Buffalo Bayou downstream. (South Mayde Creek joins Buffalo Bayou just below the dams.) However, most of the flooding in Buffalo Bayou during heavy storms is caused by surface runoff from buildings, highways, streets, parking lots, and other paved surfaces below the dams, which are closed during rain events.<\/p>\n<p><a title=\"Public Meeting on Buffalo Bayou Dams\" href=\"https:\/\/www.savebuffalobayou.org\/?page_id=2420\"><em>Read the rest of this post.<\/em><\/a><\/p>\n<div id=\"attachment_2422\" style=\"width: 1034px\" class=\"wp-caption aligncenter\"><a href=\"https:\/\/www.savebuffalobayou.org\/wp-content\/uploads\/2016\/03\/Barker-Reservoir.jpg\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-2422\" class=\"size-full wp-image-2422\" src=\"https:\/\/www.savebuffalobayou.org\/wp-content\/uploads\/2016\/03\/Barker-Reservoir.jpg\" alt=\"Barker Reservoir. Undated photo courtesy of USACE, Galveston District.\" width=\"1024\" height=\"569\" srcset=\"https:\/\/www.savebuffalobayou.org\/wp-content\/uploads\/2016\/03\/Barker-Reservoir.jpg 1024w, https:\/\/www.savebuffalobayou.org\/wp-content\/uploads\/2016\/03\/Barker-Reservoir-300x166.jpg 300w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><p id=\"caption-attachment-2422\" class=\"wp-caption-text\">Barker Reservoir. Undated photo courtesy of USACE, Galveston District.<\/p><\/div>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Corps of Engineers to Issue Repair Update Wednesday, March 9 March 7, 2016 Updated March 14, 2016 The US Army Corps of Engineers, Galveston District, is holding a public meeting Wednesday, March 9, 2016, to update the public about progress in repairing the Addicks and Barker dams on South Mayde&#8230;<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[319,130,318,260,317,60,241,168,244,167,44,323,322,321,320],"tags":[],"class_list":["post-2428","post","type-post","status-publish","format-standard","hentry","category-addicks-dam","category-army-corps-of-engineers","category-barker-dam","category-corps","category-dams","category-federal","category-flood","category-flood-control","category-flooding","category-george-bush","category-hcfcd","category-reservoir","category-richard-long","category-richard-pannell","category-south-mayde-creek"],"_links":{"self":[{"href":"https:\/\/www.savebuffalobayou.org\/index.php?rest_route=\/wp\/v2\/posts\/2428","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.savebuffalobayou.org\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.savebuffalobayou.org\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.savebuffalobayou.org\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.savebuffalobayou.org\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=2428"}],"version-history":[{"count":6,"href":"https:\/\/www.savebuffalobayou.org\/index.php?rest_route=\/wp\/v2\/posts\/2428\/revisions"}],"predecessor-version":[{"id":2449,"href":"https:\/\/www.savebuffalobayou.org\/index.php?rest_route=\/wp\/v2\/posts\/2428\/revisions\/2449"}],"wp:attachment":[{"href":"https:\/\/www.savebuffalobayou.org\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=2428"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.savebuffalobayou.org\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=2428"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.savebuffalobayou.org\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=2428"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}