{"id":10997,"date":"2022-09-26T17:10:07","date_gmt":"2022-09-26T22:10:07","guid":{"rendered":"http:\/\/www.savebuffalobayou.org\/?p=10997"},"modified":"2022-09-26T17:53:36","modified_gmt":"2022-09-26T22:53:36","slug":"10997","status":"publish","type":"post","link":"https:\/\/www.savebuffalobayou.org\/?p=10997","title":{"rendered":"Improving Flood Risk Knowledge. Proposing Solutions"},"content":{"rendered":"\n<h1 class=\"wp-block-heading\"><\/h1>\n\n\n\n<h2 class=\"wp-block-heading\"><\/h2>\n\n\n\n<h3 class=\"wp-block-heading\"><em>A Draft Flood Plan for the Region<\/em><\/h3>\n\n\n\n<p><\/p>\n\n\n\n<h5 class=\"wp-block-heading\">Key Finding: Lack of Information<\/h5>\n\n\n\n<h5 class=\"wp-block-heading\">Emphasis on Preparedness<\/h5>\n\n\n\n<h5 class=\"wp-block-heading\">How to Manage Development<\/h5>\n\n\n\n<p><\/p>\n\n\n\n<p><a href=\"https:\/\/sanjacintofloodplanning.org\/wp-content\/uploads\/2022\/08\/RFPG-Public-Open-House-Flyer_Sept-2022.pdf\" target=\"_blank\" rel=\"noreferrer noopener\">Public Meeting<\/a> in-person, Sept. 27, 5:30-7:30 pm. White Oak Conference Center, 7603 Antoine<\/p>\n\n\n\n<p><a href=\"https:\/\/sanjacintofloodplanning.org\/wp-content\/uploads\/2022\/08\/RFPG-Public-Open-House-Flyer_Sept-2022.pdf\" target=\"_blank\" rel=\"noreferrer noopener\">Public Meeting<\/a> virtual online, Sept. 29, 5:30-7:30 pm<\/p>\n\n\n\n<p><a href=\"https:\/\/sanjacintofloodplanning.org\/technical-documents\/\" target=\"_blank\" rel=\"noreferrer noopener\">Public Comment<\/a> through Oct. 27<\/p>\n\n\n\n<p><a href=\"https:\/\/www.hcfcd.org\/Z-08\" target=\"_blank\" rel=\"noreferrer noopener\">Public Comment<\/a> through Sept. 30 on the Harris County Flood Control District\u2019s <a href=\"https:\/\/www.savebuffalobayou.org\/?p=10919\" target=\"_blank\" rel=\"noreferrer noopener\">proposal for county-wide stormwater tunnels<\/a><\/p>\n\n\n\n<p><\/p>\n\n\n\n<p>        <\/p>\n\n\n\n<p>     <\/p>\n\n\n\n<p> <\/p>\n\n\n\n<p>Sept. 26, 2022<\/p>\n\n\n\n<p><\/p>\n\n\n\n<p>     <\/p>\n\n\n\n<p>Harris County does not have adequate information about where and how the county floods.<\/p>\n\n\n\n<p>In fact, the entire watershed draining into the San Jacinto River does not have adequate information about flooding. This watershed includes Harris and parts or all of ten other counties from Galveston in the south to Huntsville in the north.<\/p>\n\n\n\n<p>But the <a href=\"https:\/\/www.maapnext.org\/\" target=\"_blank\" rel=\"noreferrer noopener\">Harris County Flood Control District<\/a> is working on it. (Back in 2017 the Army Corps of Engineers was <a href=\"https:\/\/www.savebuffalobayou.org\/?page_id=4792\" target=\"_blank\" rel=\"noreferrer noopener\">going to work on it too<\/a> and that work would have been done by now. But that project <a href=\"https:\/\/www.savebuffalobayou.org\/?p=10204\" target=\"_blank\" rel=\"noreferrer noopener\">was changed<\/a>.)<\/p>\n\n\n\n<p>The lack of information is just one of the findings <a rel=\"noreferrer noopener\" href=\"https:\/\/sanjacintofloodplanning.org\/wp-content\/uploads\/2022\/09\/06_RFP_Draft_Plan_V1.pdf\" target=\"_blank\">(p. 30)<\/a> of a state-sponsored flood planning group which has been meeting and gathering information for nearly two years. The group of mostly citizen volunteers represent a variety of interests, including small business, agriculture, the environment, municipalities, water and electric utilities, the public, and more. Aided by public officials and the engineering firm <a rel=\"noreferrer noopener\" href=\"https:\/\/www.freese.com\/\" target=\"_blank\">Freese and Nichols<\/a>, the group, known as the <a rel=\"noreferrer noopener\" href=\"https:\/\/sanjacintofloodplanning.org\/about-sjrfpg\/\" target=\"_blank\">San Jacinto Regional Flood Planning Group or Region 6<\/a>, recently released a <a rel=\"noreferrer noopener\" href=\"https:\/\/sanjacintofloodplanning.org\/wp-content\/uploads\/2022\/09\/06_RFP_Draft_Plan_V1.pdf\" target=\"_blank\">massive draft report,<\/a> which will be evaluated <a rel=\"noreferrer noopener\" href=\"https:\/\/www.twdb.texas.gov\/flood\/planning\/index.asp\" target=\"_blank\">by the Texas Water Development Board, incorporated into a state flood plan, and sent to the state legislature in 2024<\/a> for possible funding. The state flood plan is to be updated every five years.<\/p>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/www.savebuffalobayou.org\/wp-content\/uploads\/2022\/09\/Region-6.png\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"524\" src=\"https:\/\/www.savebuffalobayou.org\/wp-content\/uploads\/2022\/09\/Region-6-1024x524.png\" alt=\"\" class=\"wp-image-10987\" srcset=\"https:\/\/www.savebuffalobayou.org\/wp-content\/uploads\/2022\/09\/Region-6-1024x524.png 1024w, https:\/\/www.savebuffalobayou.org\/wp-content\/uploads\/2022\/09\/Region-6-300x153.png 300w, https:\/\/www.savebuffalobayou.org\/wp-content\/uploads\/2022\/09\/Region-6-768x393.png 768w, https:\/\/www.savebuffalobayou.org\/wp-content\/uploads\/2022\/09\/Region-6-1536x786.png 1536w, https:\/\/www.savebuffalobayou.org\/wp-content\/uploads\/2022\/09\/Region-6-2048x1047.png 2048w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<p>   <\/p>\n\n\n\n<p><\/p>\n\n\n\n<p><strong>Managing Development. Being Prepared<\/strong><\/p>\n\n\n\n<p>The population of the San Jacinto region is expected to grow by one-third by 2050, and \u201cone of the largest challenges\u201d associated with this population increase, according to the report, is \u201cdetermining how to manage development responsibly and continue to preserve the region\u2019s natural resources.\u201d <a href=\"https:\/\/sanjacintofloodplanning.org\/wp-content\/uploads\/2022\/09\/06_RFP_Draft_Plan_V1.pdf\" target=\"_blank\" rel=\"noreferrer noopener\">(p. 24)<\/a><\/p>\n\n\n\n<p>Increasing flood preparedness and improving flood management regulations and ordinances are also among the top priorities detailed in the report. <a href=\"https:\/\/sanjacintofloodplanning.org\/wp-content\/uploads\/2022\/09\/06_RFP_Draft_Plan_V1.pdf\" target=\"_blank\" rel=\"noreferrer noopener\">(pp. 154 and 172)<\/a><\/p>\n\n\n\n<p>The <a rel=\"noreferrer noopener\" href=\"https:\/\/sanjacintofloodplanning.org\/technical-documents\/\" target=\"_blank\">public can comment until Oct. 27 on the draft report<\/a>, which is 302-pages long plus thousands of pages of appendices and maps and stuff. There are also <a rel=\"noreferrer noopener\" href=\"https:\/\/sanjacintofloodplanning.org\/meetings\/\" target=\"_blank\">two public meetings about the plan this week<\/a>, one in-person Tuesday, Sept. 27, and the second virtual on Thursday, Sept. 29.<\/p>\n\n\n\n<p><strong>Big Bottom-Up Flood Planning Effort<\/strong><\/p>\n\n\n\n<p>The regional group is one of fifteen <a href=\"https:\/\/capitol.texas.gov\/tlodocs\/86R\/billtext\/pdf\/SB00008F.pdf#navpanes=0\" target=\"_blank\" rel=\"noreferrer noopener\">established by the state legislature in 2019<\/a>. Based on the <a href=\"https:\/\/sanjacintofloodplanning.org\/rfpg-resources\/\" target=\"_blank\" rel=\"noreferrer noopener\">watersheds of the major rivers<\/a> draining the state, the groups operate under the <a href=\"\/\/\/Exhibit%20C\/%20Technical%20Guidelines%20for%20Regional%20Flood%20Planning\" target=\"_blank\" rel=\"noreferrer noopener\">technical guidance<\/a> of the <a href=\"https:\/\/www.twdb.texas.gov\/index.asp\" target=\"_blank\" rel=\"noreferrer noopener\">Texas Water Development Board<\/a>.<\/p>\n\n\n\n<p>The purpose of the entire project is to \u201cimprove flood risk knowledge and propose solutions,\u201d according to James Bronikowski, manager of regional flood planning for the state board. The ongoing effort is <a href=\"https:\/\/sanjacintofloodplanning.org\/about-sjrfpg\/\" target=\"_blank\" rel=\"noreferrer noopener\">\u201cintended to be a transparent process which relies on public input,\u201d<\/a> though based on the number of website responses and attendance at public meetings, public input appears to have been modest so far. <a href=\"https:\/\/sanjacintofloodplanning.org\/wp-content\/uploads\/2022\/09\/06_RFP_Draft_Plan_V1.pdf\" target=\"_blank\" rel=\"noreferrer noopener\">(p. 295)<\/a><\/p>\n\n\n\n<p><strong>A Variety of Potential Flood Risk Reduction Actions, Nature-Based, Expanded Benefit<\/strong><\/p>\n\n\n\n<p>Of the fifteen watershed planning regions, San Jacinto is the second smallest region but the most densely populated, with twice the population density of any other region. Harris County has the most people at risk of major flooding. <a href=\"https:\/\/sanjacintofloodplanning.org\/wp-content\/uploads\/2022\/09\/06_RFP_Draft_Plan_V1.pdf\" target=\"_blank\" rel=\"noreferrer noopener\">(p. 82)<\/a> The 5,089-square mile region also includes some 3,173 square miles of farming, forestry, and ranch land, mostly forestry and ranching. <a href=\"https:\/\/sanjacintofloodplanning.org\/wp-content\/uploads\/2022\/09\/06_RFP_Draft_Plan_V1.pdf\" target=\"_blank\" rel=\"noreferrer noopener\">(p. 56)<\/a><\/p>\n\n\n\n<p>The draft report identifies 650 potential actions that could help reduce flood risk in the region. These are divided into three groups: 1. evaluations or studies, 2. strategies or plans, and 3. actual projects, both structural and non-structural, though sometimes the difference between strategies and projects is unclear. These \u201cactions\u201d are largely if not entirely existing projects planned by local municipalities, counties, or districts. The basis for assessing these actions included high need and existing risk to critical facilities, no adverse impact, quantifiable flood risk reduction, and regional benefit. &nbsp;<a href=\"https:\/\/sanjacintofloodplanning.org\/wp-content\/uploads\/2022\/09\/06_RFP_Draft_Plan_V1.pdf\" target=\"_blank\" rel=\"noreferrer noopener\">(p. 32)<\/a><\/p>\n\n\n\n<p>Incorporating nature-based practices in at least 90 percent of strategies and projects is a long-term (30-year) goal. <a href=\"https:\/\/sanjacintofloodplanning.org\/wp-content\/uploads\/2022\/09\/06_RFP_Draft_Plan_V1.pdf\" target=\"_blank\" rel=\"noreferrer noopener\">(p. 30)<\/a><\/p>\n\n\n\n<p>The report also expanded the traditional but controversial benefit-cost ratio, which tended to favor expensive properties. <a rel=\"noreferrer noopener\" href=\"https:\/\/sanjacintofloodplanning.org\/wp-content\/uploads\/2022\/09\/06_RFP_Draft_Plan_V1.pdf\" target=\"_blank\">(p. 160)<\/a> Projects and strategies can or should have other benefits like \u201cpublic uplift, public education, low impact development features, and environmental benefits.\u201d <a rel=\"noreferrer noopener\" href=\"https:\/\/sanjacintofloodplanning.org\/wp-content\/uploads\/2022\/09\/06_RFP_Draft_Plan_V1.pdf\" target=\"_blank\">(p. 163<\/a>)<\/p>\n\n\n\n<p><em><a href=\"https:\/\/www.savebuffalobayou.org\/?page_id=10978\" data-type=\"page\" data-id=\"10978\">Read the rest of this post.<\/a><\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>A Draft Flood Plan for the Region Key Finding: Lack of Information Emphasis on Preparedness How to Manage Development Public Meeting in-person, Sept. 27, 5:30-7:30 pm. White Oak Conference Center, 7603 Antoine Public Meeting virtual online, Sept. 29, 5:30-7:30 pm Public Comment through Oct. 27 Public Comment through Sept. 30&#8230;<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-10997","post","type-post","status-publish","format-standard","hentry","category-uncategorized"],"_links":{"self":[{"href":"https:\/\/www.savebuffalobayou.org\/index.php?rest_route=\/wp\/v2\/posts\/10997","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.savebuffalobayou.org\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.savebuffalobayou.org\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.savebuffalobayou.org\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.savebuffalobayou.org\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=10997"}],"version-history":[{"count":12,"href":"https:\/\/www.savebuffalobayou.org\/index.php?rest_route=\/wp\/v2\/posts\/10997\/revisions"}],"predecessor-version":[{"id":11014,"href":"https:\/\/www.savebuffalobayou.org\/index.php?rest_route=\/wp\/v2\/posts\/10997\/revisions\/11014"}],"wp:attachment":[{"href":"https:\/\/www.savebuffalobayou.org\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=10997"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.savebuffalobayou.org\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=10997"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.savebuffalobayou.org\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=10997"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}