{"id":9168,"date":"2020-10-13T00:55:38","date_gmt":"2020-10-13T05:55:38","guid":{"rendered":"http:\/\/www.savebuffalobayou.org\/?page_id=9168"},"modified":"2020-11-19T22:38:05","modified_gmt":"2020-11-20T04:38:05","slug":"outrageous-plan-to-deepen-widen-kill-buffalo-bayou","status":"publish","type":"page","link":"https:\/\/www.savebuffalobayou.org\/?page_id=9168","title":{"rendered":"Outrageous Plan to Deepen, Widen, Kill Buffalo Bayou"},"content":{"rendered":"\n<p><\/p>\n\n\n\n<p style=\"font-size:18px\"><strong><em>Virtual Public Meeting Tuesday, Oct. 13. Comment Period Now<\/em><\/strong><\/p>\n\n\n\n<p><\/p>\n\n\n\n<p>Oct. 13, 2020<\/p>\n\n\n\n<p>The US Army Corps of Engineers has come up with an outrageous plan to strip, deepen and widen <a rel=\"noreferrer noopener\" href=\"https:\/\/www.savebuffalobayou.org\/?page_id=4909\" target=\"_blank\">Buffalo Bayou<\/a> and line it in places with concrete block for 22-24 miles all the way from Highway 6 in far west Houston to 1,500-feet downstream of Montrose in <a rel=\"noreferrer noopener\" href=\"https:\/\/buffalobayou.org\/visit\/destination\/buffalo-bayou-park\/\" target=\"_blank\">Buffalo Bayou Park<\/a> downtown.<\/p>\n\n\n\n<p>Is this the 1930\u2019s? The 1960\u2019s? <a href=\"https:\/\/www.swg.usace.army.mil\/Portals\/26\/BBTnT_Interim_Report_202001001_Final_1.pdf\" target=\"_blank\" rel=\"noreferrer noopener\">The plan<\/a> is so backwards and outdated it\u2019s difficult to believe they are serious.<\/p>\n\n\n\n<p>The Corps even admits the project could kill all aquatic life in the bayou. <a href=\"https:\/\/www.swg.usace.army.mil\/Portals\/26\/BBTnT_Interim_Report_202001001_Final_1.pdf\" target=\"_blank\" rel=\"noreferrer noopener\">(p. 178-180)<\/a> And that there are no positive net benefits. <a href=\"https:\/\/www.swg.usace.army.mil\/Portals\/26\/BBTnT_Interim_Report_202001001_Final_1.pdf\" target=\"_blank\" rel=\"noreferrer noopener\">(pp. 19 and 149)<\/a> The cost is estimated to be from $1 billion to $4 billion, not including future continuing maintenance.<\/p>\n\n\n\n<p>Modern flood risk management focuses on <a href=\"https:\/\/islandpress.org\/books\/floodplain-management\" target=\"_blank\" rel=\"noreferrer noopener\">stopping stormwaters before they flood streams<\/a>. On <a href=\"https:\/\/www.savebuffalobayou.org\/wp-content\/uploads\/2018\/01\/Managing_Flooding_in_Plac.pdf\" target=\"_blank\" rel=\"noreferrer noopener\">managing flooding in place<\/a>, <a href=\"https:\/\/www.savebuffalobayou.org\/wp-content\/uploads\/2018\/01\/Managing_Flooding_in_Plac.pdf\" target=\"_blank\" rel=\"noreferrer noopener\">stopping raindrops where they fall<\/a>, on slowing down, spreading out, and soaking in rainfall. And getting out of the way. <a href=\"https:\/\/www.bloomberg.com\/news\/features\/2020-08-13\/after-500-years-trying-to-tame-fatal-floods-china-builds-sponge-cities\" target=\"_blank\" rel=\"noreferrer noopener\">Sponge cities<\/a>. <a href=\"https:\/\/www.bloomberg.com\/news\/features\/2020-08-13\/after-500-years-trying-to-tame-fatal-floods-china-builds-sponge-cities\" target=\"_blank\" rel=\"noreferrer noopener\">Green infrastructure<\/a>. Wetlands, greenspace, trees. Both the <a href=\"https:\/\/www.houstontx.gov\/mayor\/Resilient-Houston-20200212-single-page.pdf\" target=\"_blank\" rel=\"noreferrer noopener\">City of Houston<\/a> and <a href=\"https:\/\/www.houstontx.gov\/mayor\/Resilient-Houston-20200212-single-page.pdf\" target=\"_blank\" rel=\"noreferrer noopener\">Harris County<\/a> have emphasized this, as have cities around the state and around the world.<\/p>\n\n\n\n<p>Creating capacity to convey more and faster rainwater runoff encourages the production of more and faster runoff. As the excellent <a href=\"https:\/\/www.houstonconsortium.com\/\" target=\"_blank\" rel=\"noreferrer noopener\">Greater Houston Flood Mitigation Consortium<\/a> reported in 2018, \u201cconveyance projects can make flooding worse.\u201d <a href=\"https:\/\/www.houstonconsortium.com\/graphics\/StrategiesReport_pages.pdf\" target=\"_blank\" rel=\"noreferrer noopener\">(p. 17)<\/a><\/p>\n\n\n\n<p>Note that Harris County Flood Control just spent nearly $10 million reconfiguring the banks in Buffalo Bayou Park downtown. (See <a href=\"https:\/\/www.savebuffalobayou.org\/?p=7863\" target=\"_blank\" rel=\"noreferrer noopener\">here<\/a> and <a href=\"https:\/\/www.savebuffalobayou.org\/?p=7863\" target=\"_blank\" rel=\"noreferrer noopener\">here<\/a>.) &nbsp;In 2017 the agency <a href=\"https:\/\/www.savebuffalobayou.org\/?p=7863\" target=\"_blank\" rel=\"noreferrer noopener\">also spent millions \u201crepairing\u201d the north bank<\/a> in Terry Hershey Park between Beltway 8 and Highway 6, and in <a href=\"https:\/\/www.savebuffalobayou.org\/?p=7135\" target=\"_blank\" rel=\"noreferrer noopener\">2019 spent millions more<\/a> clearing trees and scraping shallow detention basins out of the park\u2019s south bank.<\/p>\n\n\n\n<p>Also note the Corps\u2019 report complains that in places the bayou is naturally deepening and widening itself <a href=\"https:\/\/www.swg.usace.army.mil\/Portals\/26\/BBTnT_Interim_Report_202001001_Final_1.pdf\" target=\"_blank\" rel=\"noreferrer noopener\">(p. 67-68)<\/a> and this problem will have to be fixed. But at the same time the bayou needs to be deeper and wider so we are going to do that with bulldozers and billions of dollars.<\/p>\n\n\n\n<p><strong>Attend a Virtual Public Meeting, Send Comments<\/strong><\/p>\n\n\n\n<p>The Corps is holding virtual public meetings on the report, known as <a href=\"https:\/\/www.swg.usace.army.mil\/Portals\/26\/BBTnT_Interim_Report_202001001_Final_1.pdf\" target=\"_blank\" rel=\"noreferrer noopener\">the Buffalo Bayou and Tributaries Resiliency Study Interim Feasibility Report<\/a>. The first virtual meeting is today, Tuesday, Oct. 13, from 6 to 8 p.m., followed by meetings on Oct. 15, 22, and 26. <a href=\"https:\/\/www.swg.usace.army.mil\/Missions\/Projects\/BBTRS\/\" target=\"_blank\" rel=\"noreferrer noopener\">Here is how to join the meetings<\/a>.<\/p>\n\n\n\n<p>The public comment period opened Oct. 2 when the Corps\u2019 Galveston District released the 210-page report. Public comment ends on Nov. 2. <a href=\"https:\/\/www.swg.usace.army.mil\/Missions\/Projects\/BBTRS\/Interim-Report\/\" target=\"_blank\" rel=\"noreferrer noopener\">Here is how to send your comments to the Corps.<\/a><\/p>\n\n\n\n<div class=\"wp-block-image\"><figure class=\"aligncenter size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"437\" src=\"https:\/\/www.savebuffalobayou.org\/wp-content\/uploads\/2020\/10\/BB-Channel-improvement-p.-112-1024x437.png\" alt=\"\" class=\"wp-image-9172\" srcset=\"https:\/\/www.savebuffalobayou.org\/wp-content\/uploads\/2020\/10\/BB-Channel-improvement-p.-112-1024x437.png 1024w, https:\/\/www.savebuffalobayou.org\/wp-content\/uploads\/2020\/10\/BB-Channel-improvement-p.-112-300x128.png 300w, https:\/\/www.savebuffalobayou.org\/wp-content\/uploads\/2020\/10\/BB-Channel-improvement-p.-112-768x328.png 768w, https:\/\/www.savebuffalobayou.org\/wp-content\/uploads\/2020\/10\/BB-Channel-improvement-p.-112-1536x655.png 1536w, https:\/\/www.savebuffalobayou.org\/wp-content\/uploads\/2020\/10\/BB-Channel-improvement-p.-112.png 1566w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><figcaption>Graphic of the plan to deepen and widen Buffalo Bayou from the interim report, <a rel=\"noreferrer noopener\" href=\"https:\/\/www.swg.usace.army.mil\/Portals\/26\/BBTnT_Interim_Report_202001001_Final_1.pdf\" target=\"_blank\">p. 112<\/a>.<br><\/figcaption><\/figure><\/div>\n\n\n\n<p><\/p>\n\n\n\n<p><\/p>\n\n\n\n<p><strong>Purpose and Alternatives<\/strong><\/p>\n\n\n\n<p>The purpose of the study is to figure out what to do about too much stormwater flowing too fast into Addicks and Barker reservoirs, the flood control dams in far west Houston that drain into Buffalo Bayou. (Note that the Harris County Flood Control District has been busy speeding up the flow of stormwater through tributary streams <a href=\"https:\/\/www.hcfcd.org\/Find-Your-Watershed\/Addicks-Reservoir\/F-53-Rehabilitation-of-Channels-Upstream-of-Addicks-Reservoir\" target=\"_blank\" rel=\"noreferrer noopener\">into Addicks<\/a> and <a href=\"https:\/\/www.hcfcd.org\/Find-Your-Watershed\/Barker-Reservoir\/F-52-Rehabilitation-of-Channels-Upstream-of-Barker-Reservoir\" target=\"_blank\" rel=\"noreferrer noopener\">Barker<\/a> reservoirs.)<\/p>\n\n\n\n<p>Numerous ideas were analyzed by the Corps\u2019 team, including doing nothing, building new dams, increasing the capacity of the existing reservoirs, removing the dams, raising the dams, digging large flood tunnels from Barker reservoir to the Houston ship channel or Galveston Bay, the Brazos River or Brays Bayou, and more.<\/p>\n\n\n\n<p>Virtually all of those proposals cause massive ecological, environmental, and societal damage, including the loss of schools and homes, closure of businesses, reduction in revenue and services, and more. <a href=\"https:\/\/www.swg.usace.army.mil\/Portals\/26\/BBTnT_Interim_Report_202001001_Final_1.pdf\" target=\"_blank\" rel=\"noreferrer noopener\">(pp. 175-183)<\/a><\/p>\n\n\n\n<p>The top rated proposal from the engineers was non-structural: buyout homes and businesses in the floodplain below the dams. <a href=\"https:\/\/www.swg.usace.army.mil\/Portals\/26\/BBTnT_Interim_Report_202001001_Final_1.pdf\" target=\"_blank\" rel=\"noreferrer noopener\">(p. 149<\/a>) But they like doing this in combination with bulldozing and armoring virtually the entire bayou west of downtown.<\/p>\n\n\n\n<p><strong>The Problem<\/strong><\/p>\n\n\n\n<p>The idea is to increase the capacity of the bayou to carry 15,000 cubic feet per second (cfs) without flooding anyone below the dams, except possibly downtown, so that they can empty the reservoirs faster and save neighborhoods behind the dams, as well as the dams themselves. The study\u2019s authors anticipate that the region beyond the dams will continue developing, creating more and faster runoff, and that rainstorms will continue to increase in intensity and frequency. <a href=\"https:\/\/www.swg.usace.army.mil\/Portals\/26\/BBTnT_Interim_Report_202001001_Final_1.pdf\" target=\"_blank\" rel=\"noreferrer noopener\">(p. 7)<\/a><\/p>\n\n\n\n<p>To increase bayou capacity they would widen the top of the bayou channel to 230 feet, the channel bottom to 70 feet, increasing the depth by 11.6 feet, laying back the banks, including the bayou\u2019s historic high cliffs if necessary <a rel=\"noreferrer noopener\" href=\"https:\/\/www.swg.usace.army.mil\/Portals\/26\/BBTnT_Interim_Report_202001001_Final_1.pdf\" target=\"_blank\">(p. 18)<\/a>, some of which have been laying back anyway.<\/p>\n\n\n\n<p><a href=\"https:\/\/www.savebuffalobayou.org\/?p=4392\" target=\"_blank\" rel=\"noreferrer noopener\">During Hurricane Harvey in 2017,<\/a> the normally empty park-like reservoirs filled up and began backing up and flooding homes built in and near the reservoir pools, <a href=\"https:\/\/www.savebuffalobayou.org\/?p=4392\" target=\"_blank\" rel=\"noreferrer noopener\">on land that the federal government was supposed to buy but didn\u2019t<\/a>. Naturally developers moved in.<\/p>\n\n\n\n<p>Then the unprecedented high water level behind the dams threatened to spill around the dams or even overtop the dams, a scenario so potentially disastrous that the Corps began releasing water from the dams in the <a href=\"https:\/\/twitter.com\/USACEGALVESTON\/status\/902280561481437186\" target=\"_blank\" rel=\"noreferrer noopener\">very early morning of Aug. 28, 2017<\/a>. &nbsp;A few hours later stormwater did spill around the northern end of Addicks Dam, which, as noted in the report, had subsided three feet. <a href=\"https:\/\/www.swg.usace.army.mil\/Portals\/26\/BBTnT_Interim_Report_202001001_Final_1.pdf\" target=\"_blank\" rel=\"noreferrer noopener\">(p. 46)<\/a> Both of the reservoirs have subsided. <a href=\"https:\/\/www.swg.usace.army.mil\/Portals\/26\/BBTnT_Interim_Report_202001001_Final_1.pdf\" target=\"_blank\" rel=\"noreferrer noopener\">(p. 69)<\/a><\/p>\n\n\n\n<p>The peak of Harvey flooding had already passed downstream on Aug. 27, when the dam floodgates were closed. This downstream flooding was the result of rainwater running quickly off the paved and built surface of the city below the dams. (There was also substantial flooding from streets and yards that could not drain into the bayou. Stormwater pipes were blocked or even flowing back into neighborhoods because of the high water level of the bayou.)<\/p>\n\n\n\n<p><a href=\"https:\/\/water.weather.gov\/ahps2\/hydrograph.php?wfo=hgx&amp;gage=wsbt2&amp;hydro_type=2\" target=\"_blank\" rel=\"noreferrer noopener\">Peak flow at Beltway 8 during Harvey<\/a> was almost 23,000 cfs on Aug. 31, 2017, though there was some doubt about whether the gauges were working properly during the massive flood. The Corps operates the dams on the basis that homes downstream can start to flood <a href=\"https:\/\/water.weather.gov\/ahps2\/hydrograph.php?wfo=hgx&amp;gage=pptt2&amp;prob_type=stage&amp;source=hydrograph\" target=\"_blank\" rel=\"noreferrer noopener\">when the Piney Point gauge hits 4,000 cfs<\/a>.<\/p>\n\n\n\n<p>The fact that downstream floods even when the dam floodgates are closed is why building a flood tunnel to carry water from Barker Reservoir to the Houston Ship Channel or Galveston Bay, the Brazos River or Brays Bayou, is not necessarily going to prevent anyone downstream of the dams from flooding. The report dismisses the flood tunnel ideas for a variety of good reasons. <a href=\"https:\/\/www.swg.usace.army.mil\/Portals\/26\/BBTnT_Interim_Report_202001001_Final_1.pdf\" target=\"_blank\" rel=\"noreferrer noopener\">(pp. 106-110)<\/a><\/p>\n\n\n\n<p>The opening of the floodgates <a rel=\"noreferrer noopener\" href=\"https:\/\/www.savebuffalobayou.org\/?page_id=6105\" target=\"_blank\">badly flooded thousands of residences and businesses in neighborhoods around and upstream of Beltway 8, along the 6-mile long stretch of the bayou flowing through Terry Hershey Park<\/a>. This stretch of the bayou immediately below the dams was channelized, straightened and narrowed by the Corps in the 1950s.<\/p>\n\n\n\n<p>It is in this area presumably that the Corps suggests buying out homes and businesses, though the report suggests buyouts through three unspecified reaches. <a rel=\"noreferrer noopener\" href=\"https:\/\/www.swg.usace.army.mil\/Portals\/26\/BBTnT_Interim_Report_202001001_Final_1.pdf\" target=\"_blank\">(p. 117)<\/a><\/p>\n\n\n\n<p>Also unspecified is how the Corps proposes to acquire the right-of-way necessary to widen Buffalo Bayou, <a href=\"https:\/\/www.savebuffalobayou.org\/?page_id=5975\" target=\"_blank\" rel=\"noreferrer noopener\">the upper banks of which are largely privately owned.<\/a><\/p>\n\n\n\n<p>SC<\/p>\n\n\n\n<p><\/p>\n\n\n\n<div class=\"wp-block-image\"><figure class=\"aligncenter size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"759\" height=\"1024\" src=\"https:\/\/www.savebuffalobayou.org\/wp-content\/uploads\/2020\/10\/Corps-cartoon-Bodson.jpg\" alt=\"\" class=\"wp-image-9174\" srcset=\"https:\/\/www.savebuffalobayou.org\/wp-content\/uploads\/2020\/10\/Corps-cartoon-Bodson.jpg 759w, https:\/\/www.savebuffalobayou.org\/wp-content\/uploads\/2020\/10\/Corps-cartoon-Bodson-222x300.jpg 222w\" sizes=\"auto, (max-width: 759px) 100vw, 759px\" \/><\/figure><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Virtual Public Meeting Tuesday, Oct. 13. Comment Period Now Oct. 13, 2020 The US Army Corps of Engineers has come up with an outrageous plan to strip, deepen and widen Buffalo Bayou and line it in places with concrete block for 22-24 miles all the way from Highway 6 in&#8230;<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-9168","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/www.savebuffalobayou.org\/index.php?rest_route=\/wp\/v2\/pages\/9168","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.savebuffalobayou.org\/index.php?rest_route=\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.savebuffalobayou.org\/index.php?rest_route=\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.savebuffalobayou.org\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.savebuffalobayou.org\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=9168"}],"version-history":[{"count":11,"href":"https:\/\/www.savebuffalobayou.org\/index.php?rest_route=\/wp\/v2\/pages\/9168\/revisions"}],"predecessor-version":[{"id":9392,"href":"https:\/\/www.savebuffalobayou.org\/index.php?rest_route=\/wp\/v2\/pages\/9168\/revisions\/9392"}],"wp:attachment":[{"href":"https:\/\/www.savebuffalobayou.org\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=9168"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}