{"id":2,"date":"2014-05-07T01:10:41","date_gmt":"2014-05-07T01:10:41","guid":{"rendered":"http:\/\/savebuffalo.server270.com\/?page_id=2"},"modified":"2014-08-02T00:17:48","modified_gmt":"2014-08-02T05:17:48","slug":"sample-page","status":"publish","type":"page","link":"https:\/\/www.savebuffalobayou.org\/?page_id=2","title":{"rendered":"Plans and Maps"},"content":{"rendered":"<p>&nbsp;<\/p>\n<p><strong><span class=\"medgray\">Destroying the bayou in order to &#8220;restore&#8221; it.<\/span><\/strong><\/p>\n<p><strong>Updated August 1, 2014,<\/strong> to include the Harris County Flood Control District&#8217;s map of the areas to be excavated (yellow) and filled in (orange). Note the huge amount of land and forest to be lost by the River Oaks Country Club, the destruction\u00a0 of <a href=\"https:\/\/www.youtube.com\/watch?v=kzO_9ZaJCtw&amp;feature=youtu.be\" target=\"_blank\">the Hogg Tributary and the magnificent old cliff overlooking it<\/a>, as well as other prehistoric cliffs and virtually all the <a href=\"http:\/\/www.na.fs.fed.us\/spfo\/pubs\/n_resource\/buffer\/cover.htm\" target=\"_blank\">riparian forest<\/a> along both banks of the bayou, as well as the bayou itself, which is to be dredged, channelized, rerouted and reconstructed. This is an historic nature area, and it is to be destroyed, along with the bayou&#8217;s natural ecosystem.<\/p>\n<div id=\"attachment_566\" style=\"width: 1129px\" class=\"wp-caption alignnone\"><a href=\"https:\/\/www.savebuffalobayou.org\/wp-content\/uploads\/2014\/05\/HCFCD-cut-fill-2013.jpg\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-566\" class=\"size-full wp-image-566\" src=\"https:\/\/www.savebuffalobayou.org\/wp-content\/uploads\/2014\/05\/HCFCD-cut-fill-2013.jpg\" alt=\"Where Buffalo Bayou will be excavated (yellow) and filled in (orange). Map created by the Harris County Flood Control District.\" width=\"1119\" height=\"646\" srcset=\"https:\/\/www.savebuffalobayou.org\/wp-content\/uploads\/2014\/05\/HCFCD-cut-fill-2013.jpg 1119w, https:\/\/www.savebuffalobayou.org\/wp-content\/uploads\/2014\/05\/HCFCD-cut-fill-2013-300x173.jpg 300w, https:\/\/www.savebuffalobayou.org\/wp-content\/uploads\/2014\/05\/HCFCD-cut-fill-2013-1024x591.jpg 1024w\" sizes=\"auto, (max-width: 1119px) 100vw, 1119px\" \/><\/a><p id=\"caption-attachment-566\" class=\"wp-caption-text\">Where Buffalo Bayou will be excavated (yellow) and filled in (orange). Map created by the Harris County Flood Control District.<\/p><\/div>\n<p><em><strong>Updated May 28, 2014. New map and entire permit application now online. See below.<\/strong><\/em><\/p>\n<p><strong>Update June 19, 2014: The HCFCD has apparently changed the link and the size of the <a href=\"http:\/\/www.hcfcd.org\/downloads\/brochures\/CompleteFinalIP_MPDP.pdf\" target=\"_blank\">full final application<\/a> to the ACE for a permit to destroy Buffalo Bayou. The <a href=\"http:\/\/www.hcfcd.org\/downloads\/brochures\/CompleteFinalIP_MPDP.pdf\" target=\"_blank\">link<\/a> is now http:\/\/www.hcfcd.org\/downloads\/brochures\/CompleteFinalIP_MPDP.pdf and the document is now\u00a0 <span class=\"medgray\">37MB on 06\/13\/2014.<\/span><\/strong><\/p>\n<p><span class=\"medgray\">Here is what the Harris County Flood Control District says on its <a href=\"http:\/\/www.hcfcd.org\/P_memorial\/\" target=\"_blank\">website<\/a> about the necessity to bulldoze the wild <a href=\"http:\/\/www.na.fs.fed.us\/spfo\/pubs\/n_resource\/buffer\/cover.htm\" target=\"_blank\">riparian forest <\/a>of Buffalo Bayou in Memorial Park:<\/span><\/p>\n<p><span class=\"medgray\"> &#8220;The bayou has experienced severe erosion caused by changes in stormwater runoff rates due to urbanization and the release of high stormwater flows for extended periods of time from the United States Army Corps of Engineers-controlled Addicks and Barker reservoirs in west Harris County. Erosion in the project area has caused bank failures, loss of public and private land, and a reduction in ecological functions, such as water quality and habitat.&#8221;<\/span><\/p>\n<p>But the fact sheet says nothing about controlling stormwater runoff. And the permit application to the Army Corps of Engineers makes clear that the proposed project will not improve water quality or ecological functions, that a vast amount of habitat will be destroyed, and that even more public and private land will be lost to the county bulldozers.<\/p>\n<p><a href=\"http:\/\/www.hcfcd.org\/P_memorial\/\" target=\"_blank\">Here<\/a> is where you can find what the HCFCD said about its plan in December 2013. It includes a powerpoint demonstration on the virtues of Bermuda grass.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-97 size-full\" src=\"https:\/\/www.savebuffalobayou.org\/wp-content\/uploads\/2014\/05\/treeinventory1.jpg\" alt=\"treeinventory\" width=\"1118\" height=\"625\" srcset=\"https:\/\/www.savebuffalobayou.org\/wp-content\/uploads\/2014\/05\/treeinventory1.jpg 1118w, https:\/\/www.savebuffalobayou.org\/wp-content\/uploads\/2014\/05\/treeinventory1-300x167.jpg 300w, https:\/\/www.savebuffalobayou.org\/wp-content\/uploads\/2014\/05\/treeinventory1-1024x572.jpg 1024w\" sizes=\"auto, (max-width: 1118px) 100vw, 1118px\" \/><\/p>\n<p>This image from the HCFCD shows an inventory of the types and numbers of trees in the project area. However, only trees larger than 8 inches in diameter at breast height were counted, leaving out a lot of trees, as can be seen on the map. The HCFCD says the vegetation will be removed from 80 percent of the project area. This is <a href=\"http:\/\/dof.virginia.gov\/mgt\/riparian\/index.htm\" target=\"_blank\">riparian forest<\/a>, which protects the land from erosion, and removing it is exactly the wrong thing to do.<\/p>\n<p><strong>The HCFCD answers Frequently Asked Questions: They want to bulldoze the riparian forest while maintaining its natural state! And they want to continue to use this illogical, controversial method on Buffalo Bayou and other bayous.<\/strong><\/p>\n<p>From their <a href=\"http:\/\/www.hcfcd.org\/P_memorial\/\">website<\/a>:<\/p>\n<p><span style=\"font-size: 11.000000pt; font-family: 'HelveticaNeue';\">&#8220;Q: What is the project &#8216;demonstrating&#8217;?<\/span><\/p>\n<p><span style=\"font-size: 11.000000pt; font-family: 'HelveticaNeue';\">&#8220;A: The Memorial Park Demonstration Project provides an opportunity to showcase \u2013 or \u201cdemonstrate\u201d &#8211; the benefits of utilizing natural channel design techniques to stabilize a portion of Buffalo Bayou while maintaining the natural state of this iconic Harris County bayou. The natural channel design techniques used in this project could be applied to other segments of the bayou if a decision is made to do so in the future. The project\u2019s intent is also to show property owners along Buffalo and other bayous the long-term benefits of restoring a significant channel reach, as opposed to making individual repairs that only address isolated areas of erosion and do not take into account effects the alteration will have on the opposite side of the bayou and downstream.&#8221;<\/span><\/p>\n<div class=\"column\">\n<p><strong>But Natural Channel Design Is Not Appropriate for Buffalo Bayou<\/strong><\/p>\n<p>Respected bioengineer Robbin Sotir commenting on Natural Channel Design to Harris County Commissioner R. Jack Cagle in a telephone conference call on December 16, 2013:\u00a0 &#8220;At this time I do not think the present plan using the Natural Channel Design approach is appropriate for this reach of Buffalo Bayou. I have come to this conclusion for a number of reasons: (1) consideration of the altered watershed hydrology and associated systemic instabilities, (2) our determination that the underlying problem is related to geotechnical failures (not erosion) and (3) the proposed changes to the channel resulting in a very high amount of disturbance to the riparian forest.&#8221;<\/p>\n<\/div>\n<p><strong>The HCFD Plan submitted to the Army Corps of Engineers.<\/strong><\/p>\n<p><a href=\"http:\/\/www.swg.usace.army.mil\/Media\/PublicNotices\/tabid\/2217\/Article\/484429\/swg-2012-01007-harris-county-flood-control-district.aspx\" target=\"_blank\">Here is a link to the full public notice and the plan<\/a> submitted to the Army Corps of Engineers by the Harris County Flood Control District.<\/p>\n<p><strong>Update May, 28, 2014: But wait! That isn&#8217;t the full plan. Entire permit application now available online!<\/strong><\/p>\n<p>HCFCD has now posted the entire 719-page plan on its <a href=\"http:\/\/www.hcfcd.org\/P_memorial\/Draft_Project_Plan.asp\" target=\"_blank\">website<\/a>! No need to drive all the way to Galveston to inspect the permit application in the District Office of the Army Corps of Engineers. Apparently this is the real and true official permit application, unlike the 41-page document posted on the ACE website. And can you imagine the ACE was telling us we needed a Freedom of Information Request to view the proposed plan. Thank you, HCFCD, for doing the right thing.\u00a0 You can download the full pdf document here: <a class=\"link\" href=\"http:\/\/www.hcfcd.org\/downloads\/brochures\/CompleteFinalIP_MPDP_051914.pdf\" target=\"_blank\">U.S. Army Corps of Engineers Individual Permit Application for MPDP<\/a>\u00a0\u00a0<span class=\"medgray\">(PDF, 43MB, 05\/19\/2014)<\/span><\/p>\n<p><strong>Update June 19, 2014: The HCFCD has apparently changed the link and the size of the <a href=\"http:\/\/www.hcfcd.org\/downloads\/brochures\/CompleteFinalIP_MPDP.pdf\" target=\"_blank\">full final application<\/a> to the ACE for a permit to destroy Buffalo Bayou. The <a href=\"http:\/\/www.hcfcd.org\/downloads\/brochures\/CompleteFinalIP_MPDP.pdf\" target=\"_blank\">link<\/a> is now http:\/\/www.hcfcd.org\/downloads\/brochures\/CompleteFinalIP_MPDP.pdf and the document is now\u00a0 <span class=\"medgray\">37MB on 06\/13\/2014.<\/span><\/strong><\/p>\n<p><strong>New map showing riparian zone targeted for destruction is bigger than before. Includes forest in the interior of Memorial Park to be bulldozed to provide access for heavy equipment to the bayou.<\/strong><\/p>\n<p>Note how the &#8220;study area&#8221; in this map from the Army Corps of Engineers website extends further east than HCFCD&#8217;s inventory of trees (the map above with yellow lines).<\/p>\n<div id=\"attachment_242\" style=\"width: 1034px\" class=\"wp-caption alignnone\"><a href=\"https:\/\/www.savebuffalobayou.org\/wp-content\/uploads\/2014\/05\/Study-area-ACE.jpg\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-242\" class=\"wp-image-242 size-large\" src=\"https:\/\/www.savebuffalobayou.org\/wp-content\/uploads\/2014\/05\/Study-area-ACE-1024x791.jpg\" alt=\"The dotted red lines show the 14.35 acres of riparian forest to be scraped and bulldozed. According to the HCFCD, 80 percent of the vegetation in the targeted area will be removed. Note the areas to be cleared of trees extends into the interior of Memorial Park towards the maintenance facility. This is for access by heavy equipment to the bayou.\" width=\"1024\" height=\"791\" srcset=\"https:\/\/www.savebuffalobayou.org\/wp-content\/uploads\/2014\/05\/Study-area-ACE-1024x791.jpg 1024w, https:\/\/www.savebuffalobayou.org\/wp-content\/uploads\/2014\/05\/Study-area-ACE-300x231.jpg 300w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><p id=\"caption-attachment-242\" class=\"wp-caption-text\">The dotted red lines show the 14.35 acres of riparian forest to be scraped and bulldozed. According to the HCFCD, 80 percent of the vegetation in the targeted area will be removed. Note the areas to be cleared of trees extends into the interior of Memorial Park towards the maintenance facility. This is for access by heavy equipment to the bayou.<\/p><\/div>\n","protected":false},"excerpt":{"rendered":"<p>&nbsp; Destroying the bayou in order to &#8220;restore&#8221; it. Updated August 1, 2014, to include the Harris County Flood Control District&#8217;s map of the areas to be excavated (yellow) and filled in (orange). Note the huge amount of land and forest to be lost by the River Oaks Country Club,&#8230;<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"open","ping_status":"open","template":"","meta":{"footnotes":""},"class_list":["post-2","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/www.savebuffalobayou.org\/index.php?rest_route=\/wp\/v2\/pages\/2","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.savebuffalobayou.org\/index.php?rest_route=\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.savebuffalobayou.org\/index.php?rest_route=\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.savebuffalobayou.org\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.savebuffalobayou.org\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=2"}],"version-history":[{"count":21,"href":"https:\/\/www.savebuffalobayou.org\/index.php?rest_route=\/wp\/v2\/pages\/2\/revisions"}],"predecessor-version":[{"id":567,"href":"https:\/\/www.savebuffalobayou.org\/index.php?rest_route=\/wp\/v2\/pages\/2\/revisions\/567"}],"wp:attachment":[{"href":"https:\/\/www.savebuffalobayou.org\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=2"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}