{"id":10978,"date":"2022-09-26T16:51:23","date_gmt":"2022-09-26T21:51:23","guid":{"rendered":"http:\/\/www.savebuffalobayou.org\/?page_id=10978"},"modified":"2022-09-26T19:58:34","modified_gmt":"2022-09-27T00:58:34","slug":"10978-2","status":"publish","type":"page","link":"https:\/\/www.savebuffalobayou.org\/?page_id=10978","title":{"rendered":"Improving Flood Risk Knowledge. Proposing Solutions"},"content":{"rendered":"\n<h2 class=\"wp-block-heading\"><\/h2>\n\n\n\n<h3 class=\"wp-block-heading\"><em>A Draft Flood Plan for the Region<\/em><\/h3>\n\n\n\n<p><\/p>\n\n\n\n<h5 class=\"wp-block-heading\">Key Finding: Lack of Information<\/h5>\n\n\n\n<h5 class=\"wp-block-heading\">Emphasis on Preparedness<\/h5>\n\n\n\n<h5 class=\"wp-block-heading\">How to Manage Development<\/h5>\n\n\n\n<p><\/p>\n\n\n\n<p><a href=\"https:\/\/sanjacintofloodplanning.org\/wp-content\/uploads\/2022\/08\/RFPG-Public-Open-House-Flyer_Sept-2022.pdf\" target=\"_blank\" rel=\"noreferrer noopener\">Public Meeting<\/a> in-person, Sept. 27, 5:30-7:30 pm. White Oak Conference Center, 7603 Antoine<\/p>\n\n\n\n<p><a href=\"https:\/\/sanjacintofloodplanning.org\/wp-content\/uploads\/2022\/08\/RFPG-Public-Open-House-Flyer_Sept-2022.pdf\" target=\"_blank\" rel=\"noreferrer noopener\">Public Meeting<\/a> virtual online, Sept. 29, 5:30-7:30 pm<\/p>\n\n\n\n<p><a href=\"https:\/\/sanjacintofloodplanning.org\/technical-documents\/\" target=\"_blank\" rel=\"noreferrer noopener\">Public Comment<\/a> through Oct. 27<\/p>\n\n\n\n<p><a href=\"https:\/\/www.hcfcd.org\/Z-08\" target=\"_blank\" rel=\"noreferrer noopener\">Public Comment<\/a> through Sept. 30 on the Harris County Flood Control District\u2019s <a href=\"https:\/\/www.savebuffalobayou.org\/?p=10919\" target=\"_blank\" rel=\"noreferrer noopener\">proposal for county-wide stormwater tunnels<\/a><\/p>\n\n\n\n<p><\/p>\n\n\n\n<p>        <\/p>\n\n\n\n<p>     <\/p>\n\n\n\n<p> <\/p>\n\n\n\n<p>Sept. 26, 2022<\/p>\n\n\n\n<p><\/p>\n\n\n\n<p>     <\/p>\n\n\n\n<p>Harris County does not have adequate information about where and how the county floods.<\/p>\n\n\n\n<p>In fact, the entire watershed draining into the San Jacinto River does not have adequate information about flooding. This watershed includes Harris and parts or all of ten other counties from Galveston in the south to Huntsville in the north.<\/p>\n\n\n\n<p>But the <a href=\"https:\/\/www.maapnext.org\/\" target=\"_blank\" rel=\"noreferrer noopener\">Harris County Flood Control District<\/a> is working on it. (Back in 2017 the Army Corps of Engineers was <a href=\"https:\/\/www.savebuffalobayou.org\/?page_id=4792\" target=\"_blank\" rel=\"noreferrer noopener\">going to work on it too<\/a> and that work would have been done by now. But that project <a href=\"https:\/\/www.savebuffalobayou.org\/?p=10204\" target=\"_blank\" rel=\"noreferrer noopener\">was changed<\/a>.)<\/p>\n\n\n\n<p>The lack of information is just one of the findings <a rel=\"noreferrer noopener\" href=\"https:\/\/sanjacintofloodplanning.org\/wp-content\/uploads\/2022\/09\/06_RFP_Draft_Plan_V1.pdf\" target=\"_blank\">(p. 30)<\/a> of a state-sponsored flood planning group which has been meeting and gathering information for nearly two years. The group of mostly citizen volunteers represent a variety of interests, including small business, agriculture, the environment, municipalities, water and electric utilities, the public, and more. Aided by public officials and the engineering firm <a rel=\"noreferrer noopener\" href=\"https:\/\/www.freese.com\/\" target=\"_blank\">Freese and Nichols<\/a>, the group, known as the <a rel=\"noreferrer noopener\" href=\"https:\/\/sanjacintofloodplanning.org\/about-sjrfpg\/\" target=\"_blank\">San Jacinto Regional Flood Planning Group or Region 6<\/a>, recently released a <a rel=\"noreferrer noopener\" href=\"https:\/\/sanjacintofloodplanning.org\/wp-content\/uploads\/2022\/09\/06_RFP_Draft_Plan_V1.pdf\" target=\"_blank\">massive draft report,<\/a> which will be evaluated <a rel=\"noreferrer noopener\" href=\"https:\/\/www.twdb.texas.gov\/flood\/planning\/index.asp\" target=\"_blank\">by the Texas Water Development Board, incorporated into a state flood plan, and sent to the state legislature in 2024<\/a> for possible funding. The state flood plan is to be updated every five years.<\/p>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/www.savebuffalobayou.org\/wp-content\/uploads\/2022\/09\/Region-6.png\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"524\" src=\"https:\/\/www.savebuffalobayou.org\/wp-content\/uploads\/2022\/09\/Region-6-1024x524.png\" alt=\"\" class=\"wp-image-10987\" srcset=\"https:\/\/www.savebuffalobayou.org\/wp-content\/uploads\/2022\/09\/Region-6-1024x524.png 1024w, https:\/\/www.savebuffalobayou.org\/wp-content\/uploads\/2022\/09\/Region-6-300x153.png 300w, https:\/\/www.savebuffalobayou.org\/wp-content\/uploads\/2022\/09\/Region-6-768x393.png 768w, https:\/\/www.savebuffalobayou.org\/wp-content\/uploads\/2022\/09\/Region-6-1536x786.png 1536w, https:\/\/www.savebuffalobayou.org\/wp-content\/uploads\/2022\/09\/Region-6-2048x1047.png 2048w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<p>   <\/p>\n\n\n\n<p><\/p>\n\n\n\n<p><strong>Managing Development. Being Prepared<\/strong><\/p>\n\n\n\n<p>The population of the San Jacinto region is expected to grow by one-third by 2050, and \u201cone of the largest challenges\u201d associated with this population increase, according to the report, is \u201cdetermining how to manage development responsibly and continue to preserve the region\u2019s natural resources.\u201d <a href=\"https:\/\/sanjacintofloodplanning.org\/wp-content\/uploads\/2022\/09\/06_RFP_Draft_Plan_V1.pdf\" target=\"_blank\" rel=\"noreferrer noopener\">(p. 24)<\/a><\/p>\n\n\n\n<p>Increasing flood preparedness and improving flood management regulations and ordinances are also among the top priorities detailed in the report. <a href=\"https:\/\/sanjacintofloodplanning.org\/wp-content\/uploads\/2022\/09\/06_RFP_Draft_Plan_V1.pdf\" target=\"_blank\" rel=\"noreferrer noopener\">(pp. 154 and 172)<\/a><\/p>\n\n\n\n<p>The <a rel=\"noreferrer noopener\" href=\"https:\/\/sanjacintofloodplanning.org\/technical-documents\/\" target=\"_blank\">public can comment until Oct. 27 on the draft report<\/a>, which is 302-pages long plus thousands of pages of appendices and maps and stuff. There are also <a rel=\"noreferrer noopener\" href=\"https:\/\/sanjacintofloodplanning.org\/meetings\/\" target=\"_blank\">two public meetings about the plan this week<\/a>, one in-person Tuesday, Sept. 27, and the second virtual on Thursday, Sept. 29.<\/p>\n\n\n\n<p><strong>Big Bottom-Up Flood Planning Effort<\/strong><\/p>\n\n\n\n<p>The regional group is one of fifteen <a href=\"https:\/\/capitol.texas.gov\/tlodocs\/86R\/billtext\/pdf\/SB00008F.pdf#navpanes=0\" target=\"_blank\" rel=\"noreferrer noopener\">established by the state legislature in 2019<\/a>. Based on the <a href=\"https:\/\/sanjacintofloodplanning.org\/rfpg-resources\/\" target=\"_blank\" rel=\"noreferrer noopener\">watersheds of the major rivers<\/a> draining the state, the groups operate under the <a href=\"\/\/\/Exhibit%20C\/%20Technical%20Guidelines%20for%20Regional%20Flood%20Planning\" target=\"_blank\" rel=\"noreferrer noopener\">technical guidance<\/a> of the <a href=\"https:\/\/www.twdb.texas.gov\/index.asp\" target=\"_blank\" rel=\"noreferrer noopener\">Texas Water Development Board<\/a>.<\/p>\n\n\n\n<p>The purpose of the entire project is to \u201cimprove flood risk knowledge and propose solutions,\u201d according to James Bronikowski, manager of regional flood planning for the state board. The ongoing effort is <a href=\"https:\/\/sanjacintofloodplanning.org\/about-sjrfpg\/\" target=\"_blank\" rel=\"noreferrer noopener\">\u201cintended to be a transparent process which relies on public input,\u201d<\/a> though based on the number of website responses and attendance at public meetings, public input appears to have been modest so far. <a href=\"https:\/\/sanjacintofloodplanning.org\/wp-content\/uploads\/2022\/09\/06_RFP_Draft_Plan_V1.pdf\" target=\"_blank\" rel=\"noreferrer noopener\">(p. 295)<\/a><\/p>\n\n\n\n<p><strong>A Variety of Potential Flood Risk Reduction Actions, Nature-Based, Expanded Benefit<\/strong><\/p>\n\n\n\n<p>Of the fifteen watershed planning regions, San Jacinto is the second smallest region but the most densely populated, with twice the population density of any other region. Harris County has the most people at risk of major flooding. <a href=\"https:\/\/sanjacintofloodplanning.org\/wp-content\/uploads\/2022\/09\/06_RFP_Draft_Plan_V1.pdf\" target=\"_blank\" rel=\"noreferrer noopener\">(p. 82)<\/a> The 5,089-square mile region also includes some 3,173 square miles of farming, forestry, and ranch land, mostly forestry and ranching. <a href=\"https:\/\/sanjacintofloodplanning.org\/wp-content\/uploads\/2022\/09\/06_RFP_Draft_Plan_V1.pdf\" target=\"_blank\" rel=\"noreferrer noopener\">(p. 56)<\/a><\/p>\n\n\n\n<p>The draft report identifies 650 potential actions that could help reduce flood risk in the region. These are divided into three groups: 1. evaluations or studies, 2. strategies or plans, and 3. actual projects, both structural and non-structural, though sometimes the difference between strategies and projects is unclear. These \u201cactions\u201d are largely if not entirely existing projects planned by local municipalities, counties, or districts. The basis for assessing these actions included high need and existing risk to critical facilities, no adverse impact, quantifiable flood risk reduction, and regional benefit. &nbsp;<a href=\"https:\/\/sanjacintofloodplanning.org\/wp-content\/uploads\/2022\/09\/06_RFP_Draft_Plan_V1.pdf\" target=\"_blank\" rel=\"noreferrer noopener\">(p. 32)<\/a><\/p>\n\n\n\n<p>Incorporating nature-based practices in at least 90 percent of strategies and projects is a long-term (30-year) goal. <a href=\"https:\/\/sanjacintofloodplanning.org\/wp-content\/uploads\/2022\/09\/06_RFP_Draft_Plan_V1.pdf\" target=\"_blank\" rel=\"noreferrer noopener\">(p. 30)<\/a><\/p>\n\n\n\n<p>The report also expanded the traditional but controversial benefit-cost ratio, which tended to favor expensive properties. <a href=\"https:\/\/sanjacintofloodplanning.org\/wp-content\/uploads\/2022\/09\/06_RFP_Draft_Plan_V1.pdf\" target=\"_blank\" rel=\"noreferrer noopener\">(p. 160)<\/a> Projects and strategies can or should have other benefits like \u201cpublic uplift, public education, low impact development features, and environmental benefits.\u201d <a href=\"https:\/\/sanjacintofloodplanning.org\/wp-content\/uploads\/2022\/09\/06_RFP_Draft_Plan_V1.pdf\" target=\"_blank\" rel=\"noreferrer noopener\">(p. 163)<\/a><\/p>\n\n\n\n<p><strong>Projects. Plans. Be Prepared. Keep Doing the Same Thing<\/strong><\/p>\n\n\n\n<p>The 374 potential evaluations <a href=\"https:\/\/sanjacintofloodplanning.org\/wp-content\/uploads\/2022\/09\/06_RFP_Draft_Plan_V1.pdf\" target=\"_blank\" rel=\"noreferrer noopener\">(pp. 155 and 170)<\/a> include watershed planning&#8211;flood mapping updates and master drainage plans; project planning and preparedness for $200.6 million. <a href=\"https:\/\/sanjacintofloodplanning.org\/wp-content\/uploads\/2022\/09\/06_RFP_Draft_Plan_V1.pdf\" target=\"_blank\" rel=\"noreferrer noopener\">(p. 34)<\/a><\/p>\n\n\n\n<p>The plan identifies a total of 64 strategies at a cost of $1.137 billion, the vast majority of which ($1.1 billion) would be for \u201cbuyouts or elevation of structures with high flood risk or historical flooding impact as well as land preservation and restoration programs.\u201d <a href=\"https:\/\/sanjacintofloodplanning.org\/wp-content\/uploads\/2022\/09\/06_RFP_Draft_Plan_V1.pdf\" target=\"_blank\" rel=\"noreferrer noopener\">(p. 34)<\/a><\/p>\n\n\n\n<p>The remaining strategies include education and outreach, drainage improvements or maintenance, flood gages and warning systems. (<a href=\"https:\/\/sanjacintofloodplanning.org\/wp-content\/uploads\/2022\/09\/06_RFP_Draft_Plan_V1.pdf\" target=\"_blank\" rel=\"noreferrer noopener\">p. 155)<\/a> Additionally, retrofitting or hardening critical infrastructure against storms, burying power lines, land preservation, developing expertise in rescuing people from upper floors, hiring floodplain administrators are among the more detailed \u201cstrategies\u201d on the list. <a href=\"https:\/\/sanjacintofloodplanning.org\/wp-content\/uploads\/2022\/08\/06_RFP_Draft_Plan_V2_Part8_App_5-5B_to_10-11-1.pdf\" target=\"_blank\" rel=\"noreferrer noopener\">(p. 1977)<\/a><\/p>\n\n\n\n<p>None of these strategies refers explicitly to <a href=\"https:\/\/rethink.earth\/lessons-from-hurricane-harvey\/?utm_source=citylab-daily&amp;silverid=MzczNDEyNDg0NDkwS0\" target=\"_blank\" rel=\"noreferrer noopener\">slowing the flow,<\/a> stopping raindrops where they fall, <a href=\"https:\/\/today.tamu.edu\/wp-content\/uploads\/sites\/4\/2018\/11\/Urban-flooding-report-online.pdf\" target=\"_blank\" rel=\"noreferrer noopener\">(pp. 33-34)<\/a> or <a href=\"https:\/\/www.savebuffalobayou.org\/wp-content\/uploads\/2018\/01\/Managing_Flooding_in_Plac.pdf\" target=\"_blank\" rel=\"noreferrer noopener\">managing flooding in place<\/a>, (see <a href=\"https:\/\/www.theguardian.com\/environment\/2022\/jun\/07\/slow-water-urban-floods-drought-china-sponge-cities?utm_term=62a45995cec5342d9a9449489c2bd760&amp;utm_campaign=TheLongRead&amp;utm_source=esp&amp;utm_medium=Email&amp;CMP=longread_email\" target=\"_blank\" rel=\"noreferrer noopener\">also here<\/a>) which is modern flood management.<\/p>\n\n\n\n<p>However, there are numerous projects for building stormwater detention, removing structures from the floodplain, and purchasing land for preservation, including proposals from the <a href=\"https:\/\/www.coastalprairieconservancy.org\/\" target=\"_blank\" rel=\"noreferrer noopener\">Coastal Prairie Conservancy<\/a> (formerly Katy Prairie Conservancy) to purchase, preserve or restore five square miles of land in Waller and Harris counties. <a href=\"https:\/\/sanjacintofloodplanning.org\/wp-content\/uploads\/2022\/08\/06_RFP_Draft_Plan_V2_Part8_App_5-5B_to_10-11-1.pdf\" target=\"_blank\" rel=\"noreferrer noopener\">(p. 1988)<\/a><\/p>\n\n\n\n<p><strong>Ike Dike<\/strong><strong><\/strong><\/p>\n\n\n\n<p>The draft plan recommends a total of 21 nonstructural projects, also including property buyouts and easements, and 13 structural projects for a total cost of $28.9 billion. <a href=\"https:\/\/sanjacintofloodplanning.org\/wp-content\/uploads\/2022\/09\/06_RFP_Draft_Plan_V1.pdf\" target=\"_blank\" rel=\"noreferrer noopener\">(p. 33)<\/a> Most of the nonstructural projects focus on preparedness. <a href=\"https:\/\/sanjacintofloodplanning.org\/wp-content\/uploads\/2022\/09\/06_RFP_Draft_Plan_V1.pdf\" target=\"_blank\" rel=\"noreferrer noopener\">(p. 172)<\/a><\/p>\n\n\n\n<p>The majority of recommended structural projects are so-called \u201cchannel improvements\u201d proposed by the Harris County Flood Control District <a href=\"https:\/\/sanjacintofloodplanning.org\/wp-content\/uploads\/2022\/09\/06_RFP_Draft_Plan_V1.pdf\" target=\"_blank\" rel=\"noreferrer noopener\">(p. 64)<\/a> &nbsp;and funded through the <a href=\"https:\/\/www.hcfcd.org\/2018-bond-program\" target=\"_blank\" rel=\"noreferrer noopener\">2018 bond program<\/a>. \u201cChannel improvements\u201d means repairing previously \u201cimproved\u201d channels and streams, widening and altering, a continuous and outdated process which can contribute to increased flooding. <a href=\"https:\/\/nap.nationalacademies.org\/read\/10327\/chapter\/5#154\" target=\"_blank\" rel=\"noreferrer noopener\">(p. 154)<\/a> However, the report seeks to mitigate potential downstream flooding problems by also recommending new stormwater detention basins. It\u2019s unclear how many trees might be removed to be build new detention basins or whether removing trees for detention results in more or less detention. (<a href=\"https:\/\/harcresearch.org\/research\/forest-and-floods\/?ct=t(EMAIL_CAMPAIGN_JAN_NEWS)\" target=\"_blank\" rel=\"noreferrer noopener\">Trees and vegetation<\/a> deflect, soak up, and slow the rain and runoff.)<\/p>\n\n\n\n<p>Recommended structural projects also include a tunnel, bridge replacements, and in at least one instance <a rel=\"noreferrer noopener\" href=\"https:\/\/sanjacintofloodplanning.org\/wp-content\/uploads\/2022\/09\/06_RFP_Draft_Plan_V1.pdf\" target=\"_blank\">(p. 184),<\/a> converting open stormwater ditches to curb and gutter drainage, despite the fact that earthen ditches are more effective and cheaper and easier to maintain <a rel=\"noreferrer noopener\" href=\"http:\/\/digitalcommons.usu.edu\/cgi\/viewcontent.cgi?article=1001&amp;context=laep_facpub\" target=\"_blank\">(p. 2)<\/a> than concrete curbs and gutters, which can increase flooding. <a href=\"https:\/\/nap.nationalacademies.org\/read\/10327\/chapter\/5#183\">(p. 183)<\/a><\/p>\n\n\n\n<p><strong>Recommended Structural Projects<\/strong><\/p>\n\n\n\n<p>Lower Clear Creek and Dickinson Bayou <a href=\"https:\/\/sanjacintofloodplanning.org\/wp-content\/uploads\/2022\/09\/06_RFP_Draft_Plan_V1.pdf\" target=\"_blank\" rel=\"noreferrer noopener\">(p. 173)<\/a><\/p>\n\n\n\n<p>Brays Bayou <a href=\"https:\/\/sanjacintofloodplanning.org\/wp-content\/uploads\/2022\/09\/06_RFP_Draft_Plan_V1.pdf\" target=\"_blank\" rel=\"noreferrer noopener\">(p. 176)<\/a><\/p>\n\n\n\n<p>Sims Bayou <a href=\"https:\/\/sanjacintofloodplanning.org\/wp-content\/uploads\/2022\/09\/06_RFP_Draft_Plan_V1.pdf\" target=\"_blank\" rel=\"noreferrer noopener\">(p. 178)<\/a><\/p>\n\n\n\n<p>Halls Bayou <a href=\"https:\/\/sanjacintofloodplanning.org\/wp-content\/uploads\/2022\/09\/06_RFP_Draft_Plan_V1.pdf\" target=\"_blank\" rel=\"noreferrer noopener\">(p. 180)<\/a><\/p>\n\n\n\n<p>White Oak Bayou <a href=\"https:\/\/sanjacintofloodplanning.org\/wp-content\/uploads\/2022\/09\/06_RFP_Draft_Plan_V1.pdf\" target=\"_blank\" rel=\"noreferrer noopener\">(p. 182)<\/a><\/p>\n\n\n\n<p>Greens Bayou <a href=\"https:\/\/sanjacintofloodplanning.org\/wp-content\/uploads\/2022\/09\/06_RFP_Draft_Plan_V1.pdf\" target=\"_blank\" rel=\"noreferrer noopener\">(p. 184)<\/a><\/p>\n\n\n\n<p>Caney Creek <a href=\"https:\/\/sanjacintofloodplanning.org\/wp-content\/uploads\/2022\/09\/06_RFP_Draft_Plan_V1.pdf\" target=\"_blank\" rel=\"noreferrer noopener\">(p. 186)<\/a><\/p>\n\n\n\n<p>East Fork of the San Jacinto River <a href=\"https:\/\/sanjacintofloodplanning.org\/wp-content\/uploads\/2022\/09\/06_RFP_Draft_Plan_V1.pdf\" target=\"_blank\" rel=\"noreferrer noopener\">(p. 189)<\/a><\/p>\n\n\n\n<p>Lake Creek <a href=\"https:\/\/sanjacintofloodplanning.org\/wp-content\/uploads\/2022\/09\/06_RFP_Draft_Plan_V1.pdf\" target=\"_blank\" rel=\"noreferrer noopener\">(p. 190)<\/a><\/p>\n\n\n\n<p>Peach Creek <a href=\"https:\/\/sanjacintofloodplanning.org\/wp-content\/uploads\/2022\/09\/06_RFP_Draft_Plan_V1.pdf\" target=\"_blank\" rel=\"noreferrer noopener\">(p. 192)<\/a><\/p>\n\n\n\n<p>Spring Creek <a href=\"https:\/\/sanjacintofloodplanning.org\/wp-content\/uploads\/2022\/09\/06_RFP_Draft_Plan_V1.pdf\" target=\"_blank\" rel=\"noreferrer noopener\">(p. 193)<\/a><\/p>\n\n\n\n<p>West Fork San Jacinto River <a href=\"https:\/\/sanjacintofloodplanning.org\/wp-content\/uploads\/2022\/09\/06_RFP_Draft_Plan_V1.pdf\" target=\"_blank\" rel=\"noreferrer noopener\">(p. 195)<\/a><\/p>\n\n\n\n<p>Coastal Storm Risk Management &nbsp;<a rel=\"noreferrer noopener\" href=\"https:\/\/sanjacintofloodplanning.org\/wp-content\/uploads\/2022\/09\/06_RFP_Draft_Plan_V1.pdf\" target=\"_blank\">(p. 197)<\/a>. The report claims that the Galveston Bay Surge Protection plan (known as the Ike Dike) has no adverse environmental impacts. <a rel=\"noreferrer noopener\" href=\"https:\/\/sanjacintofloodplanning.org\/wp-content\/uploads\/2022\/08\/06_RFP_Draft_Plan_V2_Part8_App_5-5B_to_10-11-1.pdf\" target=\"_blank\">(p. 2050)<\/a> It does not mention the <a rel=\"noreferrer noopener\" href=\"https:\/\/www.sspeed.rice.edu\/gbpp\" target=\"_blank\">Galveston Bay Park Plan<\/a> developed by the SSPEED Center at Rice to complement <a rel=\"noreferrer noopener\" href=\"https:\/\/www.coastalstudy.texas.gov\/draft-proposal\/locations\/upper\/index.html\" target=\"_blank\">the coastal protection plan<\/a> proposed by the Corps of Engineers and Texas General Land Office.<\/p>\n\n\n\n<p>SC<\/p>\n","protected":false},"excerpt":{"rendered":"<p>A Draft Flood Plan for the Region Key Finding: Lack of Information Emphasis on Preparedness How to Manage Development Public Meeting in-person, Sept. 27, 5:30-7:30 pm. White Oak Conference Center, 7603 Antoine Public Meeting virtual online, Sept. 29, 5:30-7:30 pm Public Comment through Oct. 27 Public Comment through Sept. 30&#8230;<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-10978","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/www.savebuffalobayou.org\/index.php?rest_route=\/wp\/v2\/pages\/10978","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.savebuffalobayou.org\/index.php?rest_route=\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.savebuffalobayou.org\/index.php?rest_route=\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.savebuffalobayou.org\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.savebuffalobayou.org\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=10978"}],"version-history":[{"count":21,"href":"https:\/\/www.savebuffalobayou.org\/index.php?rest_route=\/wp\/v2\/pages\/10978\/revisions"}],"predecessor-version":[{"id":11016,"href":"https:\/\/www.savebuffalobayou.org\/index.php?rest_route=\/wp\/v2\/pages\/10978\/revisions\/11016"}],"wp:attachment":[{"href":"https:\/\/www.savebuffalobayou.org\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=10978"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}