Update on Our Campaign to Save the Last Natural Stretch of Buffalo Bayou in Houston

Oct. 5, 2014

Where are we now and what should you do?

The Harris County Flood Control District has applied for a permit to bulldoze most of the riparian forest and vegetation along both banks of more a mile of the last remaining stretch of natural Buffalo Bayou in the city. This is our bayou as it passes by Memorial Park. Also targeted are the tributary and high bluffs of the Hogg Bird Sanctuary, as well as other ancient cliffs and prehistoric sandstone used in the past as water crossings by buffalo and people. The project would excavate, fill, grade, and artificially rebuild the banks; dredge, deepen, and reroute the bayou channel, damming tributaries. Hundreds of trees will be cut down, many of them riparian species too small or too young to be counted by the district’s inappropriate tree survey. The shading tree canopy will be removed (project proponents claim there is no tree canopy!); the water temperature increased. The soil, packed with protective, binding roots small and large, will be dug up, tossed around, and compacted by heavy equipment. Wetlands and lovely sandy beaches will be obliterated along with the colonizing and stabilizing plants that have taken root there, a crucial stage of the natural process of building the riparian buffer so important to water quality, flood and erosion control.

All of this and more violates best management practices for riparian zones. It will destroy the bayou’s ecosystem. And this is a project developed and promoted by the Bayou Preservation Association, supported by the Memorial Park Conservancy.

Timelines Are Difficult to Predict — Updated Oct. 30, 2014

The Harris County Flood Control District has responded to the public comments sent to the Army Corps of Engineers during the public comment period, which ended June 30. The district has posted its responses on its website, and you can read them here. (Caution: big pdf.)

Read the rest.

The River Oaks Country Club has killed the grass on its golf course, along with vegetation on the high banks, in preparation for redoing the golf course. Photo on Sept. 20, 2014, by Jim Olive.

The River Oaks Country Club, which owns the entire south bank of the bayou project, has killed the grass on its golf course, along with some vegetation on the high banks, in preparation for redoing the golf course. Photo on Sept. 20, 2014, by Jim Olive.