Reminder: The Threat is Still Alive

Operation Save Buffalo Bayou II

March 14, 2016

Okay, so we harshed the mood a little with our small, silent reminders that regatta contestants were paddling through a historic natural area still threatened with destruction.

“Thanks for polluting my day,” yelled one paddler in the crowd of hundreds of Buffalo Bayou boaters playing loud music and stopping to pee in the woods. We were watching from the sandy bank of the lovely middle meander, forested with young willows and box elder that would all be cut down, the meander filled, graded, and planted with grass.

The event was the 44th Annual Buffalo Bayou Regatta on Saturday, March 12. And once again we hung our beautiful Save Buffalo Bayou banner (Night Heron by Houston artist Frank X. Tolbert 2) from the railroad bridge and set out small white signs alerting participants to the fact that the wild stretch they were passing through would all be bulldozed under a plan proposed by the Harris County Flood Control District and the Bayou Preservation Association (BPA).

Save Buffalo Bayou banner hanging from the railroad trestle crossing Buffalo Bayou from Memorial Park. Photo March 12, 2016, by Richard Hyde.

Save Buffalo Bayou banner hanging from the railroad trestle crossing Buffalo Bayou from Memorial Park. Photo March 12, 2016, by Richard Hyde.

The project, known as the Memorial Park Demonstration Project, demonstrates exactly the wrong thing to do. (See Buffalo Bayou Park and Fonteno Park.) It would raze most of the trees and vegetation along more than 1.25 miles of the 18,000-year-old bayou as it passes by Memorial Park and the Hogg Bird Sanctuary. These trees and vegetation and even the sand are part of the riparian zone, essentially wetlands, that hold the banks together, cleanse and filter the water, slow and absorb storm runoff, provide wildlife habitat, among many other important ecological functions. The $6 million “natural channel design” project, financed with $4 million in county and city taxpayer funds, would dredge and reroute the bayou and plug tributaries, obliterate ancient cliffs, destroy 250,000-year-old sandstone formations, and fill in our lovely meander (a natural detention area). Killing the bayou’s ecosystem in the name of “restoration.” And landscape design.

And no, contrary to rumors, the project, although holding its breath, is not dead. The Army Corps of Engineers is still deciding whether to issue a permit for the project, which is otherwise a violation of the federal Clean Water Act.

The Bayou Preservation Association first formulated the plan for the project in private meetings in 2010 and  former BPA president Kevin Shanley, then a principal with the landscape architecture firm SWA Group, was the primary promoter. SWA Group is the design firm that is also responsible for the landscape design of Buffalo Bayou Park downstream east of Shepherd.

So this is why we had signs up warning of landscapers lurking. In Buffalo Bayou Park downstream, we set out a few signs pointing out that landscaping has washed away (several times actually) and that removal of vegetation has caused erosion problems, and that repairs were $$$$ (paid with City funds). Yes, we were bad! Those signs did not last long, however.

Educational signs posted on expensive repairs to eroding banks that previously had been "stabilized" by the Harris County Flood Control District in Buffalo Bayou Park. Photo March 12, 2016, by AC Conrad.

Educational signs posted on expensive repairs to eroding banks that previously had been “stabilized” by the Harris County Flood Control District in Buffalo Bayou Park. Photo March 12, 2016, by AC Conrad.

Upstream around Memorial Park and the Hogg Bird Sanctuary our signs pointed out where beavers live, where banks were being naturally rebuilt by the bayou, and the Pleistocene bluffs that would be graded into a slope. Interestingly, the bayou, during and after the Memorial Day flood in 2015, has already graded the lower banks of those steep bluffs into a slope.

The River Oaks Country Club is theoretically a one-third partner in the demonstration project and owns the entire south half of the project reach. But in the meantime the club in two places has armored its banks with ugly concrete riprap, one of the most environmentally destructive methods of erosion control (pdf), and also, we allege, in this case illegal, as we contend that much of the riprap was placed in public waters, also a violation of the Clean Water Act.

The club, unfortunately, is having erosion problems on its high banks in those places because it cut down a lot of trees and extended the mowed and watered grass of its golf course up to the edge of the banks.

We put out signs pointing out that riprap damages the ecosystem and is part of the problem, not the solution.

But we’re glad people had fun, enjoyed the bayou, and picked up some of trash.

Maybe they’ll think about the future of the bayou.

And special thanks to river guide Tom Helm and to Richard Hyde for extra long duty putting out and picking up our banner and picking up our signs.

3 thoughts on “Reminder: The Threat is Still Alive”

  1. kirk says:

    I had no idea the failure of the lower banks in Buffalo Bayou Park was this extreme

    1. And that’s after they’ve been repaired.

  2. So glad you did this, keep up the very important good work!

Leave a Reply

Your email address will not be published. Required fields are marked *