Fighting For Our Public Forests on Buffalo Bayou

On the Radio

Forests Work for Us

Oct. 28, 2015

Listen to Susan Chadwick of Save Buffalo Bayou and Landrum Wise of Save Our Forest talk about community campaigns to protect public forest along some twelve miles of Buffalo Bayou in Houston.

They spoke with Pat Greer and H.C. Clark on Eco-Ology on KPFT 90.1 Tuesday, Oct. 27, 2015, about efforts to keep the City of Houston and the Harris County Flood Control District from destroying woodlands on Buffalo Bayou in Memorial Park in the center of Houston and in Terry Hershey Park in far west Houston.

In addition to their great social value and benefit to our health, well-being, and quality of life, the trees and vegetation that grow naturally along the bayou perform vital ecological services and are a key part of the bayou’s living system. Known as riparian zones or buffers, these specially adapted trees and plants cleanse and filter pollutants from the water. They protect the banks from erosion, absorb and slow storm water runoff and provide natural flood detention. They shade us and cool the stream, and provide wildlife habitat.

Legally Required to Conserve Harris County Forests

The Harris County Flood Control District, according to its 1937 charter, is charged by state law with conserving forests in the county. (See page six.) But for decades the district has been razing forests to build storm water detention basins on our bayous, creeks, tributaries, and elsewhere, and to re-engineer channels and banks. Detention basins are used to hold or slow temporarily surface runoff or high flows in a stream during storms.

The flood control district’s project on Buffalo Bayou in Memorial Park, known as the Memorial Park Demonstration Project, would raze some 80 percent of the trees and vegetation along more than 1.25 miles of the bayou and its tributaries in Memorial Park and the Hogg Bird Sanctuary. The Army Corps of Engineers, which enforces the federal Clean Water Act, is currently considering whether to issue a permit for the controversial $6 million project, which is described by flood control as an “erosion control” and “bank stabilization” project. The project violates Best Management Practices for riparian areas. Virtually every federal and state resource agency has policies and regulations protecting riparian zones, which perform essentially the same function as federally-protected wetlands.

Recent Success for Save Our Forest

The City of Houston recently withdrew a project to cut down the majority of trees and understory on some 42 acres of public forest and excavate up to six large detention basins on the south bank of Buffalo Bayou in Terry Hershey Park between Beltway 8 and Wilcrest Drive. The Capital Improvement Project was to have cost the taxpayers between $3.5 and $8.5 million.

However, the flood control district appears to be continuing with its widely-opposed “Charting Buffalo” study that proposes as many as 24 storm water detention basins along some 10.7 miles of both banks of Buffalo Bayou in the forests of Terry Hershey Park between Beltway 8 and Highway 6 at Barker and Addicks dams. On Nov. 12, 2013, despite public opposition, Harris County Commissioners Court approved flood control’s request for $250,000 for a vegetation and topography survey in the park.

The headwaters of Buffalo Bayou are on the Katy Prairie west of Houston, and the 18,000-year-old “mother bayou,” fed by numerous tributaries, flows for some 53 miles east through the city and the ship channel into Galveston Bay. Buffalo Bayou, unlike major bayous like White Oak and Brays, which join Buffalo Bayou just west and east of downtown, has never been covered with concrete, though parts of it have been channelized.

Listen to the radio broadcast.

The banks of Buffalo Bayou in Terry Hershey Park in West Houston. Straightened and channelized by the Army Corps of Engineers in the 1940s to speed storm waters, the bayou has since restored itself but remains threatened by public projects to slow storm waters.

The banks of Buffalo Bayou in Terry Hershey Park in West Houston. This 10.7-mile stretch of the bayou downstream from Barker and Addicks dams was straightened and channelized by the Army Corps of Engineers in the 1950s to speed storm waters. The bayou in this park has since restored itself but remains threatened by public flood control projects. Photo Oct. 6, 2015 by Susan Chadwick

 

 

 

Update on Puzzling Project to Bulldoze Wild Buffalo Bayou

Damaging, Expensive, Contradictory Plan Still Threatens

Conflicts Still Apparent, Purpose Still Unclear

No Permit Yet

October 8, 2015

The Harris County Flood Control District has responded to largely critical public comments to the Army Corps of Engineers about Flood Control’s misguided project to destroy one of the last natural stretches of Buffalo Bayou in Houston, a most remarkable asset to have in the middle of a city. The Corps is reviewing the Flood Control District’s responses, says Jayson Hudson, who has been the Corps’ Galveston District project manager for the permit application.

Flood Control must apply for a permit from the Corps of Engineers because the Clean Water Act requires the Corps to ensure that projects on federal waters do not damage the health of our waters. Federal waters are defined as navigable streams (Buffalo Bayou) up to the Ordinary High Water Mark, their tributaries and adjacent wetlands, all of which form the great living veins and arteries of our limited water supply. Some studies argue that all riparian areas , the highly biologically diverse natural gardens and forests along stream banks so vital for clean water, should be considered protected wetlands .

This beautiful meander, a natural detention area, would be filled in and graded, the woods and high cliffs destroyed, and the entire floodplain area obliterated by a permanent road. Aerial photo on Oct. 3, 2015, by Jim Olive

This beautiful meander, a natural storm water detention area, would be filled in and graded, the woods and high cliffs destroyed, and the entire floodplain area obliterated by a permanent road. Aerial photo on Oct. 3, 2015, by Jim Olive

Read the rest of this post.

The Piles of Concrete Came Down

Country Club Armors High Banks with Chunks of Rubble

August 12, 2015

For months we watched with suspense the towering piles of concrete riprap. They hung heavily over the edge of a high bank on the south side of Buffalo Bayou near the downstream end of one of the loveliest natural stretches of the bayou in the city. It’s a long stretch of the bayou that the Harris County Flood Control District wants to bulldoze and “restore” to a “more natural state,” so we were apprehensive.

A row of small telltale colored flags had first appeared near the waterline here and upstream at the upper limit of the area targeted for flood control’s highly destructive Memorial Park Demonstration Project.

The south bank of the nearly 1.5 mile project area is owned by the River Oaks Country Club, which is a one-third partner in the $6 million public project initiated and promoted by the Bayou Preservation Association. The club, which has nearly completed a renovation of its golf course on the bayou, had long threatened to armor its banks with riprap if the “stabilization” project didn’t go through.

And now the club has carried through on its threat, laying down black plastic sheeting on the steep banks at those two locations downstream and upstream, distributing chunks of concrete on the slopes, and covering the blocks with dirt. Club member Steve Lindley, who is overseeing the riprap work as well as the golf course upgrade for the club, said that the plastic sheeting is porous and biodegradable and that club plans to seed the dirt with grass to keep it from washing away and eventually to plant it with native vegetation such as chili pequin.

Read the rest of this post.

Concrete riprap and straw boom on the south bank of Buffalo Bayou at water's edge. Photo taken Aug. 9, 2015.

Concrete riprap, dirt, plastic, and straw boom on the south bank of Buffalo Bayou at water’s edge. Photo taken Aug. 9, 2015.

Crazy Widespread Disappearance of Wetlands around Houston

Wetlands in Buffalo Bayou Threatened Too

Aug. 3, 2015

The Army Corps of Engineers is not keeping track of whether developers are replacing tens of thousands of acres of wetlands lost to development in the Houston region as required by law.

Wetlands, according to the Environmental Protection Agency, “are part of the foundation of our nation’s water resources and are vital to the health of waterways and communities that are downstream. Wetlands feed downstream waters, trap floodwaters, recharge groundwater supplies, remove pollution, and provide fish and wildlife habitat.”

Under the federal Clean Water Act, the Corps of Engineers is charged with protecting our wetlands.

A study by the Houston Advanced Research Center (HARC), reported by the Houston Chronicle Friday, July 31, 2015, found that “more than 38,000 acres of wetlands vanished in greater Houston over the past two decades despite a federal policy that ‘no net loss’ can be caused by encroaching development.”

Read the rest of this story.

Wetland photo by John Jacob, Texas A&M University's Coastal Watershed Program, published in the Houston Chronicle, July 31, 2015. Printed with permission of John Jacob.

Wetland photo by John Jacob, director of Texas A&M University’s Coastal Watershed Program, published in the Houston Chronicle, July 31, 2015. Printed with permission of John Jacob.

While We Wait

The Flood Control District’s Failing “Natural Channel Design” Projects

July 11, 2015

Well, the comments are in to the Army Corps of Engineers. The comment period that ended June 5 was not extended. So now we wait to find out what the Corps will do next about a permit for the Harris County Flood Control District’s controversial $6 million Memorial Park Demonstration Project. The flood control district wants to destroy one of the last natural stretches of Buffalo Bayou as it flows past Memorial Park in the middle of the city so that engineers can “build it better,” thus demonstrating exactly the wrong thing to do for erosion control and bank stabilization on the bayou.

It’s the wrong thing to do because the specially adapted trees and plants on the bayou (known as the riparian zone) protect the land from erosion, slow storm water and runoff, filter pollution and bacteria (and trash) from the water, provide shade and habitat, among many other vital functions. Razing the riparian buffer, as this project would do, digging up and running heavy equipment over the banks and bayou bottom are all contrary to Best Management Practices and the policies of virtually every federal and state agency charged with protecting the health of our waters, our wildlife habitat, and our soil.

What Are the Options?

So what are the Corps’ options?

Read the rest of this story to find out and learn about the flood control district’s previous failing “natural channel design” projects.

 

Cottonwood downed on south bank west of Waugh by undercutting of banks in Buffalo Bayou Park "restored" by the Harris County Flood Control District. Several more mature trees have been lost since this photo was taken Jan. 26, 2015, by Jim Olive.

Cottonwood downed on south bank west of Waugh by undercutting of banks in Buffalo Bayou Park “restored” by the Harris County Flood Control District. Several more mature trees have been lost since this photo was taken Jan. 26, 2015, by Jim Olive.

Immutable Plan. Invisible Rocks.

“Revised” plan to destroy Buffalo Bayou not really “revised” at all.

Project manager says no significant changes to much criticized original plan.

No sandstone in project area, says flood control, contradicting itself.

June 3, 2015

Invisible ancient sandstone in project area at 29°45'35.8"N 95°25'58.6"W 29.759953, -95.432954. Photo by Bill Heins.

Invisible ancient sandstone in project area at 29°45’35.8″N 95°25’58.6″W. Photo by Bill Heins.

Despite the hundreds of comments criticizing the purpose, methods, impact, cost, benefit, and harm of Harris County Flood Control District’s proposed “erosion control” project on Buffalo Bayou in and around Memorial Park, the district has made no significant changes to the plans recently re-submitted to the Army Corps of Engineers.

Jason Krahn, project manager for the controversial Memorial Park Demonstration Project, told Dianna Wray of the Houston Press that the district was “simply following the guidelines” and that there were “no significant changes” to the original project plan.

Indeed, many of the “revised” plan sheets posted by the Army Corps of Engineers on its website appear to have been simply relabeled with new dates, though there are some with new details.

The public has until June 5 to send comments to the Corps about the district’s “revised” permit application and the district’s responses to previous comments. There is no limit on the number of comments one can make. So if you’ve already made a comment, make another!

Read the rest of this story.

Let’s Work With Nature, Not Against It

What’s the right way to protect Buffalo Bayou?

March 18, 2015 Updated: March 18, 2015 11:20am

Is the traditional vision of local and urban flood control agencies in conflict with federal and state agencies charged with protecting the health of our waterways?

Let me explain how I came to ask myself this question about mission conflict.

I grew up on Buffalo Bayou in Houston, and since early last spring I have been involved with a campaign to stop a flood control project that would destroy and then attempt to rebuild a healthy and relatively untouched riparian forest corridor running through the center of our city. It’s pretty rare to have a stretch of fairly wild river running through the middle of such a large city. The late great conservationist Army Emmott described our Buffalo Bayou as a ribbon of life running through the concrete. And that’s what it is: a living thing, a diverse and dynamic ecosystem that shows us the wondrous process of nature.

We are even more fortunate that in the words of the great river scientist Mathias Kondolf of Berkeley, this enchanting river has “room to move.” Here, in the middle of the city, we have space to “let the river be a river” — to let its banks change and its forest garden grow, as they would naturally. Dr. Kondolf traveled through this reach of the bayou in November, a reach that has never been channelized. The nearly 1.5-mile stretch targeted for destruction flows between the riparian forest and great cliffs of a public park (Memorial Park) and the forested terraces and high banks of a private golf course.

Read the rest of this article in the Houston Chronicle.

Note: This opinion piece is adapted from a presentation delivered February 12, 2015, at Texas’ first Urban Riparian Symposium, sponsored by the Texas Water Resources Institute, the Texas Riparian Association, and the City of Austin.

Looking over Buffalo Bayou from Memorial Park towards the River Oaks Country Club. This area is targeted for destruction by the $6 million Memorial Park Demonstration Project. Photo by Jim Olive.

Looking over Buffalo Bayou from Memorial Park towards the River Oaks Country Club. This area is targeted for destruction by the $6 million Memorial Park Demonstration Project. Photo by Jim Olive.

Operation Save Buffalo Bayou: Banners, Signs Erected During Big Regatta Saturday, March 7

March 8, 2015

Defenders of Buffalo Bayou traipsed through clumps of wild chives and violets on the banks of the bayou Saturday, March 7, in order to hang colorful banners from bridges and trees and set out signs informing more than a thousand participants in the annual Buffalo Bayou Regatta about the grave threat to our wild bayou.

Operation Save Buffalo Bayou was a huge success as competitors paddling down the bayou waved and shouted “No bulldozers!” and “Leave it natural!” to members of the Buffalo Bayou defense team sitting on the banks in the project area.

Bayou defenders also handed out informational flyers at the end of the race in Sesquicentennial Park adjacent to the Wortham Center downtown and engaged participants and officials in conversation.

The regatta was organized by the Buffalo Bayou Partnership (BBP), a non-profit organization in charge of developing the $58 million Buffalo Bayou Park between Memorial Drive and Allen Parkway downstream of the project area. The partnership officially supports the $6 million plan to bulldoze one of the last natural stretches of the bayou as it flows past Memorial Park in the middle of Houston.

Sand on the Sidewalks

BBP President Anne Olson wrote a letter of support for the destruction project to the Army Corps of Engineers in June 2014 saying that the plan would “significantly prevent” the bayou from “depositing silt on Buffalo Bayou’s downtown parks and trails.” She also claimed that the project, known as the Memorial Park Demonstration Project, would demonstrate “a prototype that can be employed by bayou property owners who currently remedy their property erosion by all different types of inappropriate stabilization methods.”

In fact the amount of silt and sediment contributed by the historic nature area targeted for destruction by the Harris County Flood Control District is minimal. But the project itself would likely greatly increase the sediment flowing downstream as a result of dredging the bayou, removing trees and plants, and breaking up the soil structure of the banks.

Read the rest of this story.

Beautiful banner of a night heron drawn by Houston artist Frank Tolbert hanging over Buffalo Bayou during the annual Regatta.

Beautiful banner of a night heron drawn by Houston artist Frank Tolbert hanging over Buffalo Bayou during the annual Regatta.

Bayou Preservation Association Will Attempt to Explain Position in Favor of Destroying Bayou

Jan. 20, 2015

Steve Hupp of the Bayou Preservation Association will attempt to explain tonight (Tuesday, Jan. 20, 2015) why the BPA supports a project that violates its founding purpose of preserving Buffalo Bayou. Hupp will defend the Memorial Park Demonstration Project we oppose at a regular meeting of the Briar Forest Super Neighborhood at 6:30 p.m.

Briar Forest has been fighting Harris County plans to destroy riparian forest for detention basins along the south side of Buffalo Bayou in Terry Hershey Park between Dairy Ashford and Memorial. Terry Hershey Park is a named after one of the founders of the BPA.

The meeting is at the Briarwood School, 12207 Whittington.

Pettibone surveys the "restoration" of the wild banks of Buffalo Bayou.

Pettibone surveys the “restoration” of the wild banks of Buffalo Bayou.

Who’s Cutting the Black Willows on Buffalo Bayou in Memorial Park?

Dec. 21, 2014

We’ll Get to the Bottom of This Meander Mystery

Updated Dec. 24, 2014. Mystery solved! See below.

Revisiting a beautiful meander last week in Memorial Park we came across something strange. This is what we call the middle meander in the area of the Harris County Flood Control District’s project to bulldoze the riparian vegetation, dredge and channelize one of the last natural stretches of Buffalo Bayou in the middle of Houston. You can see photos taken earlier in October of this lovely spot.

This is a flat, marshy area of the north bank, filled with wildlife, mullet jumping and landing on their backs, where the bayou has gradually shifted to the east and has been naturally revegetating the sandy banks with native smartweed, ground cherry, boxelder, black willow, and sycamores.

Here is what it looked like last week.

  • Wildlife tracks in the mud on the middle meander to be destroyed. Photo taken Dec. 15, 2014, by Susan Chadwick.
  • Edible native smartweed on the middle meander to be obliterated by the Harris County Flood Control District. Photo taken Dec. 15, 2014, by Susan Chadwick
  • Sycamore in the foreground, sandy point on the south bank of the middle meander to be filled in by the flood control district. Photo taken Dec. 15, 2014, by Susan Chadwick

 

This area will be totally obliterated by the flood control district’s “erosion control” and “bank stabilization” project, known as the Memorial Park Demonstration Project. The bayou here will be filled in, the magnificent, very old cliffs defaced and leveled, and the bayou rerouted further to the south. Why? Because that’s what the flood control district imagines the bayou will do 200-300 years from now. So we taxpayers are paying $4 million to do all the damage now that the bayou might possibly do in several centuries.

The odd thing was that someone has been cutting down the native black willow saplings that are growing up on the sandy bench in this area, creating a new riparian forest so necessary for controlling erosion, stabilizing the banks, cleansing the water, and providing wildlife habitat. Who would do that and why?

Answer: It’s beavers.

Here’s the evidence.

  • Native black willow sapling chopped, apparently by a beaver, it turns out. Experts have pointed out the tooth marks that a beaver makes. All photos taken Dec. 15, 2014, by Susan Chadwick.
  • Another native black willow cut by a busy beaver. These are the trees that a healthy bayou naturally plants to create a new riparian forest, but beavers need homes too.
  • Another young black willow cut down for a beaver development.
  • The probable track of a beaver, apparently dragging a harvested black willow sapling to the water for home building material. And are those beaver footprints with the long toes?

 

« Previous PageNext Page »